Zusammenfassung
The Launch Management is currently playing a more and more important role in the automotive industry. This is mainly due to increasing numbers of variants with decreasing quantities and shortening of the product-life-cycle. A launch can be divided into 2 phases: before start of production (pilot phase) and after start of production (ramp-up). Due to increasing automation in assembly shop and prototype construction, the pilot phase faces new challenges. During the pilot phase the developed facilities and processes must be adopted to fulfill the demands of the series production.
In this paper, the application of ontologies is investigated as a possible solution for the upcoming challenges. For this investigation, at first the characteristics of the pilot phase in the automotive industry are defined. Following the definition, an ontology tailored to the pilot phase’s demands is developed. Finally, an outlook will be given towards implementing ontology into future concepts. Additionally an overview of demand for further research will be provided.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Literatur
Nagel, J.: Risikoorientiertes Anlaufmanagement. Gabler Verlag, Wiesbaden (2011).
Wildemann, H.: Anlaufmanagement: Leitfaden zur Optimierung der Anlaufphase von Produkten, Anlagen und Dienstleistungen. TCW Transfer-Centrum, 13. Aufl., München (2014).
Kuhn, A. Wiendahl, H.-P, Eversheim, W. and Schuh, G.: Fast ramp up: Schneller Produktionsanlauf von Serienproduktion, Praxiswissen, Dortmund (2002).
Opitz, A., Müller, E. and Hildebrand, T.: Die optimale Anlaufkurve in der Serienfertigung: Ein Modell zur Bestimmung des Aufwand-Nutzen-Verhältnisses von Anpassungsmaßnahmen bei der Beschleunigung des Anlaufs. ZWF Zeitschrift für wirtschaftlichen Fabrikbetrieb, 101. Jg. Heft 6, pp. 356-359 (2006).
Laick, T.: Hochlaufmanagement: Sicherer Produktionshochlauf durch zielorientierte Gestaltung und Lenkung des Produktionsprozesssystems, Universität Kaiserslautern. Lehrstuhl für Fertigungstechnik und Betriebsorganisation (2003a).
Risse J.: Time-to-Market-Management in der Automobilindustrie. Ein Gestaltungsrahmen für ein logistikorientiertes Anlaufmangement, Technische Universität Berlin. Fakultät VIII Wirtschaft und Management (2002).
Laick, T., Warnecke, G. and Aurich, J. C.: Hochlaufmanagement: Sicherer Produktionshochlauf durch zielorientierte Gestaltung und Lenkung des Produktionsprozesssystems. PPS Management - Zeitschrift für Produktion und Logistik, 8. Jg., Heft 2, pp. 51-54 (2003b).
Wangenheim, S.: Planung und Steuerung des Serienanlaufs komplexer Produkt-Dargestellt am Beispiel der Automobilindustrie, Peter Lang, Bern (1998).
Pfohl, H.-C., Gareis , K.: Die Rolle der Logistik in der Anlaufphase. ZfB Zeitschrift für Betriebswirtschaft, 70. Jg., Heft 11, pp. 1189-1214 (2000).
Johnson F. , Karlsson, M.: Ramp-up in manufacturing: Conceptual framework, measurement system and practical experiences from 48 cases in the Swedish industry. Master´s Thesis, Department of Operations Management and Work Organization, Report Number: 98:8, Chalmers University of Technology, Gothenburg (1998).
Resch, J.: Kontextorientierte Entwicklung und Absicherung von festen Verbindungen im Produktentstehungsprozess der Automobilindustrie. In: Berichte aus dem INSTITUT FÜR MASCHINEN- UND GERÄTEKONSTRUKTION (IMGK), Band 27, Universitätsverlag Ilmenau, Ilmenau (2016).
Weyand, L: Risikoreduzierte Endmontageplanung am Beispiel der Automobilindustrie. Universität des Saarlandes, Saarbrücken (2010).
Lawson, G., Salanitri, D., Waterfield, B.: Future directions for the development of virtual reality within an automotive manufacturer. Applied Ergonomics, 53, pp. 323–330 (2016).
Bracht, U., Geckler, D. and Wenzel, S: Digitale Fabrik. Methoden und Praxisbeispiele, Springer, Heidelberg (2011).
VDI 4499: Digitale Fabrik - Digitaler Fabrikbetrieb (2011).
Berger, U., Minhas, S.-u.-H., Lehmann, C. and Städter, J. P.: Reconfigurable Strategies for manufacturing setups to confront mass customization challanges. In: 21st International Conference on Production Research, Stuttgart (2011).
Specht D.: Beiträge zur Produktionswirtschaft: Weiterentwicklung der Produktion, Gabler Verlag, Wiesbaden (2009).
Almgren, H.: Towards a framework for analyzing efficiency during launch: an empirical investigation of a Swedish auto manufacturer. International Journal of Production Economics, 60/61, pp. 79–86 (1999).
Terwiesch, C. and Bohn, R.E.: Learning and Process Improvement during Production Rampup. International Journal of Production Economics, 70, (1), pp. 1–19 (2001).
Fjällström, Säfsten, S., K., Harlin, U. and Stahre, J.: Information enabling production ramp-up. Journal of Manufacturing Technology Management, 20, (2), pp. 178–196 (2009).
Noy, N. F., McGuinness, D. L.: Ontology Development 101: A Guide to Creating Your First Ontology”, Stanford University (2001).
Gómez-Pérez, A., Fernández-López, M., Corcho, O.: Ontological Engineering: With Examples from the Areas of Knowledge Management, e-commerce and the Semantic Web. London: Springer Verlag (2004).
Dengel, A., Bernadi, A., Elst, L.: Wissensrepräsentation in Semantische Technologien: Grundlagen - Konzepte - Anwendungen, A. Dengel, Ed., Hei-delberg: Spektrum Akademischer Verlag (2012).
Haarmann B.: Einführung in die Arbeit mit Ontologien, 2. Aufl. Berlin: epubli. (2013).
Bodendorf, Freimut.: Daten- und Wissensmanagement, 2. Aufl. Berlin, Heidelberg: Springer-Verlag (2006).
Beißel S.: Ontologiegestütztes Case-Based Reasoning: Entwicklung und Beurteilung semantischer Ähnlichkeitsindikatoren für die Wiederverwendung natürlichsprachlich repräsentierten Projektwissens Dissertation, Universität Duisburg-Essen, Duisburg-Essen (2011).
DIN 8580:2003-09 Fertigungsverfahren (2003).
Juzek, C.: Entwicklung eines automatisierten, ontologiegestützten Wissensmanagementmodells für Produktionsanläufe in der Automobilindustrie, Shaker Verlag, Stuttgart (2014).
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2018 Springer-Verlag GmbH Deutschland, ein Teil von Springer Nature
About this paper
Cite this paper
Eilenberger, D., Berger, D. (2018). Ontologies as a solution for current challenges of automation of the pilot phase in the automotive industry. In: Schüppstuhl, T., Tracht, K., Franke, J. (eds) Tagungsband des 3. Kongresses Montage Handhabung Industrieroboter. Springer Vieweg, Berlin, Heidelberg. https://doi.org/10.1007/978-3-662-56714-2_19
Download citation
DOI: https://doi.org/10.1007/978-3-662-56714-2_19
Published:
Publisher Name: Springer Vieweg, Berlin, Heidelberg
Print ISBN: 978-3-662-56713-5
Online ISBN: 978-3-662-56714-2
eBook Packages: Computer Science and Engineering (German Language)