Correction to: Water Resour Manag
The original version of this article unfortunately contains mistakes in equations 1 and 2. The mistakes and corrections is described below:
Should be:
Author information
Authors and Affiliations
Corresponding author
Additional information
Publisher’s Note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
The online version of the original article can be found at https://doi.org/10.1007/s11269-020-02581-w
Rights and permissions
About this article
Cite this article
Yan, L., Xiong, L., Luan, Q. et al. Correction to: On the Applicability of the Expected Waiting Time Method in Nonstationary Flood Design. Water Resour Manage 34, 3057–3058 (2020). https://doi.org/10.1007/s11269-020-02606-4
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11269-020-02606-4