Critical Path Analysis

  • Kenneth R. MacCrimmon
Reference work entry
DOI: https://doi.org/10.1057/978-1-349-95189-5_455

Abstract

When consumers plan vacations, manufacturers schedule production, and governments tackle budget deficits, each must deal with a myriad of interrelated activities. In large projects, managing these interrelationships is very difficult due to three major factors: the precedence ordering of activities, the uncertainty about activity durations, and the possibility of reallocating resources.

This is a preview of subscription content, log in to check access

Bibliography

  1. Dean, B.V., and A.K. Chaudhuri. 1980. Project scheduling: A critical review. TIMS Studies in the Management Sciences 15: 215–233.Google Scholar
  2. Elmaghraby, S.E. 1977. Activity networks: Project planning and control by network models. New York: Wiley.Google Scholar
  3. Kelley, J.E., and M.R. Walker. 1959. Critical path planning and scheduling. Proceedings of the Eastern Joint Computer Conference.Google Scholar
  4. MacCrimmon, K.R., and C.A. Ryavec. 1959. An analytical study of the PERT assumptions. Operations Research 7(5): 16–37.Google Scholar
  5. Malcolm, D.G., J.H. Rosenboom, C.E. Clark, and W. Fazar. 1959. Applications of a technique for research and development program evaluation. Operations Research 7(5): 646–669.CrossRefGoogle Scholar
  6. Pritsker, A.A.B.., and C.E. Sigal. 1983. Management decision making: A network simulation approach. Englewood Cliffs: Prentice-Hall.Google Scholar

Copyright information

© Macmillan Publishers Ltd. 2018

Authors and Affiliations

  • Kenneth R. MacCrimmon
    • 1
  1. 1.