Abstract
This Chapter covers the description of maintenance of Overhead Transmission Lines (OHTL). Due to difficulties encountered by most Line Owners in building new OHTL and even with upgrading existing lines, the present Chapter is to understand issues and technologies related to the safe maintenance and operation of existing transmission lines. Since most of the world’s power utilities’ OHTL are approaching their design life or beyond, a good maintenance strategy is important to ensure their integrity.
Originally published by Cigré, 2014, under the ISBN 978-2-85873-284-5.
Republished by Springer International Publishing Switzerland with kind permission.
References
BS EN 50374:2004: Conductors cars
CARPI: Proceedings of the First International Conference on Applied Robotics for the Power Industry. Montréal (2010)
CARPI: Proceedings of the Second International Conference on Applied Robotics for the Power Industry. Zürich (2012)
Cho, B.-H., S.-H. Byun, J.-Y. Park, J.-S. Kim.: Development of automatic inspection robot for live-line insulators. In: Proceedings of the International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance, Korea Electric Power Research Institute, ESMO (2006)
Cigré ELT-222-4: Guidelines for emergency resource planning for overhead transmission line asset owners. Working Group B2.13 (2005)
Cigré Session Paper B2-204: Condition assessment of overhead lines (2004)
Cigré Session Paper B2-208: The application of the RCM method to RTE overhead transmission lines (2004)
Cigré TB 175: Management of existing overhead transmission lines. Working Group 22.13 (2000)
Cigré TB 201: Maintenance outsourcing guidelines. Joint Working Group 23/39.14 (2002)
Cigré TB 216: Joints on transmission line conductors: field testing and replacement criteria. Working Group 22.12 (2002)
Cigré TB 230: Assessment of existing overhead line supports. Working Group B2.08 (2003)
Cigré TB 306: Guide for the assessment of old cap & pin and long-rod transmission line insulators made of porcelain or glass: what to check and when to replace. Working Group B2.03 (2006)
Cigré TB 353: Guidelines for increased utilization of existing overhead transmission lines. Working Group B2.13 (2008)
Cigré TB 471: Working safely while supported on aged overhead conductors. Working Group B2.33 (2011)
Cigré TB 477: Evaluation of aged fittings. Working Group B2.32 (2011)
Cigré TB 481: Guide for the assessment of composite insulators in the laboratory after their removal from service. Working Group B2.21 (2011)
Cigré TB 545: Assessment of in-service composite insulators by using diagnostic tools. Working Group B2.21 (2013)
Cigré TB 561: Live work – a management perspective. Joint Working Group B2/B3.27 (2013)
Cigré TB: Remedial actions for aged fittings & repair of conductors. Working Group B2.47 (to be published)
Cigré TB: The use of robotics in assessment and maintenance of OHL. Working Group B2.52 (to be published)
Elizondo, D., Gentile, T.: Technology watch on transmission line robotics. Transmission Line Asset Management Interest Group (TLAM), CEATI report no. T093700-3224 (2010)
Elizondo, D., Gentile, T.: State of the art study on Unmanned Aerial Vehicles (UAVs) for transmission line asset management. Transmission Line Asset Management Interest Group (TLAM), CEATI report no. T123700-3242 (2013)
Elizondo, D., Gentile, T., Candia, H., Bell, G.: Ground based robots for energized transmission line work-technology description, field projects and technical-economical justification of their application. IEEE 1(1), 700–705 (2010a)
Elizondo, D., Piernot, S., Jesse Kohler, P.E.: Energized robotic maintenance and its implications for transmission line design. Technical report for the Overhead Line Design Issues and Wind and Ice Storm Mitigation Program (2012)
Papailiou, K.O., Schmuck, F.: Silicone Composite Insulators. Springer, Berlin (2012)
Park, J.-Y., Lee, J.-K., Cho, B.-H., Oh, K.-Y.: Development of advanced insulator inspection robot for 345kV suspension insulator strings. In: Proceedings of the International Multi Conference of Engineers and Computer Scientists 2010, vol. II, IMECS 2010, Hong Kong, 17–19 Mar 2010
Roncolatto, R.A., Romanelli, N.W., Hirakawa, A., Horikawa, O., Vieira, D.M., Yamamoto, V., Finotto, V.C., Sverzuti, V., Lopes, I.P.: Robotics applied to work conditions improvement in power distribution lines maintenance. IEEE 1(1), 1–6 (2010)
Shimo, Y.: Development of power transmission line inspection system by unmanned helicopter. Cigré Conference, B2/D2-106 (2006)
Toussaint, K., Pouliot, N., Montambault, S.: Transmission line maintenance robots capable of crossing obstacles: state-of-the-art review and challenges ahead. J. Field Robot. 26(5), 477–499 (2009)
Turner, A.P., Wilson, D.C.: System development of a robotic pole manipulator. IEEE 1(1), 1–6 (2010)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2017 Springer International Publishing Switzerland
About this entry
Cite this entry
Leblond, A., Lindsey, K.E. (2017). Maintenance. In: Papailiou, K. (eds) Overhead Lines. CIGRE Green Books. Springer, Cham. https://doi.org/10.1007/978-3-319-31747-2_16
Download citation
DOI: https://doi.org/10.1007/978-3-319-31747-2_16
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-31746-5
Online ISBN: 978-3-319-31747-2
eBook Packages: EngineeringReference Module Computer Science and Engineering