Renewable Energy Systems

2013 Edition
| Editors: Martin Kaltschmitt, Nickolas J. Themelis, Lucien Y. Bronicki, Lennart Söder, Luis A. Vega

Wind Power Grid Integration: Transmission Planning

Reference work entry
DOI: https://doi.org/10.1007/978-1-4614-5820-3_90

Abstract

How is transmission planning done? In as many ways as there are different goals of many organizations influenced by regulation. The discussion will relate to entities connected to a large interconnected grid.

This is a preview of subscription content, log in to check access.

Bibliography

  1. 1.
    EWITS – Eastern Wind Integration and Transmission Study. The National Renewable Energy Laboratory, US. http://www.nrel.gov/wind/systemsintegration/pdfs/2010/ewits_executive_summary.pdf
  2. 2.
    EIPC – Eastern Interconnection Planning Collaborative. http://www.eipconline.com/
  3. 3.
    JCSP – Joint Coordinated System Plan (JCSP) 2018 summer reliability study Report. https://www.midwestiso.org/Library/Repository/Study/JCSP/JCSP_Report_Volume_2.pdf
  4. 4.
  5. 5.
    GE MAPS – GE Multi-Area Production Simulation Software.http://crai.com/consultingexpertise/content.aspx?tID=828&subtID=842&terTID=896
  6. 6.

Copyright information

© Springer Science+Business Media New York 2013

Authors and Affiliations

  1. 1.Midwest ISOColumbusUSA