FREEFloat

  • Saul I. Gass
  • Carl M. Harris
Reference work entry
DOI: https://doi.org/10.1007/1-4020-0611-X_365

The amount of time a designated activity can be delayed without affecting succeeding activities of a project. This will be the float for the final activity of a chain (or for a single activity which does not lie on a chain with equal float). Float;  Network planning.