Using the Multilayer Free-Surface Flow Model to Solve Wave Problems V. A. Prokof’ev HYDROTECHNICAL CONSTRUCTION 18 February 2017 Pages: 459 - 465
Steel-Reinforced Concrete Penstock Experiments V. B. NikolaevS. E. LisichkinA. S. Lisichkin OriginalPaper 18 February 2017 Pages: 466 - 472
Sediment Deposition in Artificial Harbors and Approach Channels A. A GorlovaK. N. Makarov OriginalPaper 22 February 2017 Pages: 473 - 479
Studies on the Action of Waves on Maritime Hydraulic-Engineering Structures A. A. GirgidovV. I. KlimovichV. A. Prokof’ev OriginalPaper 18 February 2017 Pages: 480 - 486
Hydraulic Studies in Support of the Construction of a Stepped Spillway at The Boguchany Hydroelectric Power Plant G. A. Sudol’skii OriginalPaper 18 February 2017 Pages: 487 - 495
Results of Laboratory Tests of the Filtration Characteristics of Clay-Cement Concrete S. V. Sol’skiiM. G. LopatinaN. L. Orlova OriginalPaper 18 February 2017 Pages: 496 - 500
Analysis and Prediction of Asphalt-Concrete Core Wall Settlement of the Boguchany HPP Rockfill Dam During the Period of Construction Completion V. V. UspenskiiE. I. Kuznetsov OriginalPaper 18 February 2017 Pages: 501 - 505
Determining the Natural Frequencies of the Dam at the Sayano-Shushenskaya Hydroelectric Power Plant Based on Data from a Seismometer System and Computations A. Yu. EgorovV. S. KostylevM. I. Sarantsev OriginalPaper 22 February 2017 Pages: 506 - 510
Mathematical Modeling in Systems for Operational Evaluation of the Stress-Strain State of the Arch-Gravity Dam at the Sayano-Shushenskaya Hydroelectric Power Plant E. N. BellendirL. A. GordonA. E. Skvortsova OriginalPaper 18 February 2017 Pages: 511 - 515
Prospects for Implementing Best Available Technologies for Environmental Protection at Thermal Power Plants A. G. TumanovskiiA. N. ChugaevaA. M. Volodin THERMAL POWER PLANTS 18 February 2017 Pages: 516 - 520
Experience with Certification Testing of Thermal Power Plant Equipment N. V. ZorchenkoA. G. Chaplin OriginalPaper 18 February 2017 Pages: 521 - 524
Specific Operating Conditions of the K-175-12,7 Steam Turbine of Unit 5 at the Berezovskaya Grés E. O. VoronovS. V. KramarenkoA. I. Chertkov OriginalPaper 18 February 2017 Pages: 525 - 529
Effect of Feed Water Temperature on the Operational Reliability of High-Pressure Drum Boilers A. I. FedorovD. A. Baev OriginalPaper 18 February 2017 Pages: 530 - 534
Status and Standardization of the Water-Chemical Regime for Power Generation Boilers A. V. KirilinaS. Yu. SuslovA. B. Larin OriginalPaper 18 February 2017 Pages: 535 - 539
Increasing the Reliability and Extending the Service Lifetime of the Rotors of Double-Flow Medium-Pressure Cylinders of High-Power Steam Turbines I. V. ZaitsevL. A. KhomenokA. V. Gorin OriginalPaper 18 February 2017 Pages: 540 - 545
Increasing the Reliability of Steam-Jet Ejectors in Power Plant Turbines1 A. Yu. RyabchikovK. É. AronsonS. I. Khaet OriginalPaper 18 February 2017 Pages: 546 - 548
Using Traveling-Wave Processes in the Development of Relay Protection for Overhead Lines (OHL)1 V. F. LachuginP. S. Platonov POWER SYSTEMS AND ELECTRIC NETWORKS 17 February 2017 Pages: 549 - 555
Usage Optimization of Automatic Points of Sectionalizing to Increase Grid Reliability and Electricity Service S. A. AndrikeevaA. M. Gel’fandA. L. Tolmachev OriginalPaper 17 February 2017 Pages: 556 - 559
Use of TCSR with Split Windings for Shortening the Spar Cycle Time in 500 kV Lines A. M. MatinyanM. V. PeshkovN. A. Alekseev OriginalPaper 17 February 2017 Pages: 560 - 566