Physico-mechanical characteristics and mechanism of concrete leaching in cracked zone of reinforced-concrete penstock linings at the Sayano-Shushenskaya HPP V. A. RasskazchikovV. A. Ulyashinskii Hydrotechnical Construction 11 March 2009 Pages: 253 - 260
Parameters of the lognormal distribution of settled suspended particles as applies to settling basins at HPP, sprinkling systems, water supply, and water disposal I. E. Mikhailov Hydrotechnical Construction 11 March 2009 Pages: 261 - 267
Substantiation of parameters of horizontal fish-discharging reticulated barriers V. V. Petrashkevich Hydrotechnical Construction 11 March 2009 Pages: 268 - 272
On methods of calculating potential (seepage) flows on the basis of Jacobi elliptic integrals K. N. Anakhaev Hydrotechnical Construction 12 March 2009 Pages: 273 - 276
Ultrasound monitoring of permeability in movement joints of water-development works A. G. Alimov Hydrotechnical Construction 12 March 2009 Pages: 277 - 280
Development and introduction of new designs for gas-dust flow mixing distribution systems at thermal power plants V. Z. LeikinI. A. PozinS. V. Ognishchenko Thermal Electric Power Stations 11 March 2009 Pages: 281 - 292
Possible use of feed water for boiler injectors V. V. Ermolaev Thermal Electric Power Stations 12 March 2009 Pages: 293 - 299
Damming the channel of the River Vakhsh in the section of the Sangtudinskaya GÉS-1 hydroelectric power plant A. A. Ryabikin Energy Systems and Electrical Networks 12 March 2009 Pages: 300 - 303
Investigation of the reasons for the damage to the DVI-630-1500 type electric motor Yu. A. KrylovA. L. DokukinYu. N. Samorodov Energy Systems and Electrical Networks 11 March 2009 Pages: 304 - 307