Spillway construction at the Irganai HPP in Dagestan R. Z. UmanskiiI. A. BalychevtsevA. P. Shevchuk Hydrotechnical Construction 21 November 2008 Pages: 191 - 195
Measuring devices for instrument inspection of bearings and shafts in hydraulic generating sets S. V. BekhterevV. I. OsikaV. A. Pchelintsev Hydrotechnical Construction 21 November 2008 Pages: 196 - 202
Model studies of conditions for closure of the Vakhsh River at the site of the Sangtudinskaya HPP-1 V. B. RodionovV. P. KupriyanovG. F. Onipchenko Hydrotechnical Construction 21 November 2008 Pages: 203 - 209
Laboratory investigations of lower-pool hydraulics during operation of the service spillway at the Bureya HPP A. V. Vasil’evG. K. DeryuginV. A. Prokof’ev Hydrotechnical Construction 21 November 2008 Pages: 210 - 212
Analysis of the temperature and icing regimes of pipelines under severe climatic conditions G. A. Raspopin Hydrotechnical Construction 21 November 2008 Pages: 213 - 215
On scientific and technical support of programs for Hydrotechnical Construction in the Russian Federation to 2020 A. N. Marchuk Hydrotechnical Construction 21 November 2008 Pages: 216 - 219
Improvements in the technique for assembling flanged connectors in the shaft lines of turbine units É. A. DonD. V. Taradai Thermal Electric Power Stations 21 November 2008 Pages: 220 - 221
Modernization of standard and rapid pressure-reducing and cooling units with injection of high pressure water V. V. ErmolaevA. P. Andreev Thermal Electric Power Stations 21 November 2008 Pages: 222 - 229
Purification of turbine condensate in the lumped desalinization units of the Mosénergo TÉTs-22 Heat and Electric Power Plant I. A. MalakhovÉ. G. AmosovaL. S. Klimonova Thermal Electric Power Stations 21 November 2008 Pages: 230 - 235
Use of GTÉ-65 gas turbine power units in the thermal configuration of steam-gas systems for the refitting of operating thermal electric power plants A. S. LebedevV. P. KovalevskiiN. A. Ermaikina Thermal Electric Power Stations 21 November 2008 Pages: 236 - 246
Behavior of phosphates in a high pressure drum boiler with frequent loading A. F. BogachevA. V. KirillinaYu. V. Kozlov Thermal Electric Power Stations 21 November 2008 Pages: 247 - 251