Condition of the thrust front of the Sayano-Shushenskaya HPP after completion of repairs to reduce its perviousness L. S. PermyakovaA. P. EpifanovN. I. Stefanenko Hydrotechnical Construction 12 August 2008 Pages: 67 - 71
Cavitation damage sustained by constriction discharges at the Bureya hydroproject during passage of floods in 2003–2006 A. V. Vasil’evA. S. GarkinG. K. Deryugin Hydrotechnical Construction 12 August 2008 Pages: 72 - 77
Design and construction of dams on permafrost A. B. Feringer Hydrotechnical Construction 12 August 2008 Pages: 78 - 82
Condition and control of the thermal-filtration regime of northern rock-and-earthfill dams constructed in accordance with the thaw principle A. M. TsvikI. A. MaksimovV. V. Koleganov Hydrotechnical Construction 12 August 2008 Pages: 83 - 87
Computer model for flood control in the middle-run of the Belaya River A. L. BuberM. V. TroshinaS. P. Ivasenko Hydrotechnical Construction 12 August 2008 Pages: 88 - 92
Modernizing the boiler installation for unit no. 3 at the Kashirskaya GRÉS to reduce nitrogen oxide emissions A. A. SmyshlyaevS. A. EvdokimovÉ. Kh. Verbovetskii Thermal Electric Power Stations 12 August 2008 Pages: 93 - 99
Calculating the thermally stressed state of the high and medium pressure rotors of a T-250/300-240 turbine in the labyrinth seal zone A. A. IvanovskiiV. L. PokhorilerV. N. Goloshumova Thermal Electric Power Stations 12 August 2008 Pages: 100 - 104
Automated system for removal and pneumatic transport of fly ash from electric precipitator hoppers V. K. KonovalovO. V. YashkinV. V. Ermakov Thermal Electric Power Stations 12 August 2008 Pages: 105 - 109
Using an oxygen content indicator in a coal-dust boiler fuel controller Yu. V. ArtamonovV. N. BarbakovYu. G. Metal’nikov Thermal Electric Power Stations 12 August 2008 Pages: 110 - 112
An estimate of the limit state of power transformers and autotransformers M. Yu. L’vovK. M. AntipovYu. A. Dement’ev Energy Systems and Electrical Networks 12 August 2008 Pages: 113 - 118
Tuning of higher harmonic filters connected to the tertiary windings of converter transformers L. L. BalyberdinYu. S. KraichikG. G. Prochan Energy Systems and Electrical Networks 12 August 2008 Pages: 119 - 122