Skip to main content
Log in

High-enthalpy hot-shot wind tunnel with combined heating and stabilization of parameters

  • Published:
Thermophysics and Aeromechanics Aims and scope

Abstract

In the present paper, we consider instrumentation and the experimental procedure for conducting tests in a highenthalpy short-duration wind-tunnel facility, namely, a hypersonic hot-shot wind tunnel. We consider operation of the hot-shot wind tunnel with the test gas (TG) parameters kept constant during the regime and also operation of the tunnel as a traditional shock tube with a decay of the TG parameters that occurs as the TG leaves a constant-volume settling chamber. Stabilization of the TG parameters is achieved by using a pressure multiplier installed coaxially with the settling chamber, the configuration presenting a linear arrangement of the two components. Unloading of pressure multiplier dynamic component is achieved by using an equalizer whose piston moves in the opposite direction to the multiplier piston system. Several modes of wind tunnel operation with various combinations of different TG heating methods (electric arc, chemical energy, adiabatic compression, or heating in an external with respect to the settling chamber heat source) are possible. The design of a device responsible for diaphragm breakdown delay is considered. The design and dimensions of the wind tunnel provide for its normal operation under the following conditions: range of Mach numbers M = 4–20, range of settling-chamber temperatures T ch1 = 600–4000 K, and settling-chamber pressure p ch1 up to 200 MPa (in operation with a double settling chamber, the stagnation pressure p 0n = p ch2 can be varied from 1 to 200 MPa). The settling chamber volume (80–100 dm3) is sufficiently large, allowing obtaining a 1-m diameter hypersonic stream in the test section during ∼ 100 ms (in combination with a second settling chamber).

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. M.E. Topchiyan and A.M. Kharitonov, Wind tunnels for hypersonic research (progress, problems, and prospects), J. Appl. Mech. Tech. Phys., 1994, Vol. 35, No. 3, P. 383–395.

    Article  ADS  Google Scholar 

  2. Advanced hypersonic test facilities, in: F.K. Lu and D.E. Marren (editors), Progress in Astronautics and Aeronautics, 2002, Vol. 198.

  3. V.V. Kislykh, High-velocity hot-shot wind tunnels: comparative analysis and prospects, in: Proc. Int. Sci. and Engng. Conference “Basic Problems in High-Velocity Flows”, 2004, TsAGI, Moscow, 2004, P. 467–468.

    Google Scholar 

  4. D.B. Volov, Heat-technology units for generation of dense high-temperature gases, High Temperat., 2006, Vol. 44, No. 4, P. 604–626.

    Article  Google Scholar 

  5. N.A. Anfimov and V.V. Kislykh, Modeling of the flow around hypersonic flying vehicles and heat transfer in piston-driven gas-dynamic facilities with multistage compression, in: Problems in Advanced Mechanics: Collection of Scientific Papers, Moscow State University, Moscow, 2008, P. 17–43.

    Google Scholar 

  6. Invention certificate No. 1156462, USSR, G01M9/00, Hot-shot wind tunnel / V.A. Dmitriev, Yu.F. Trushnikov, L.N. Puzyrev, and M.I. Yaroslavtsev, 1985.

  7. L.N. Puzyrev and M.I. Yaroslavtsev, Stabilization of gas parameters in the settling chamber of a hypersonic hotshot wind tunnel, Izv. SO AN SSSR, Ser. Tekhn. Nauk, 1990, No. 5, P. 135–140.

    Google Scholar 

  8. V.V. Shumsky, Combined heating of the test gas in high-enthalpy gas-dynamic facilities, Sib. Fiz.-Tekhn. Zhurn., 1993, No 2, P. 87–97.

    Google Scholar 

  9. V.V. Shumsky and M.I. Yaroslavtsev, Chemical heating of the working gas in a short-duration high-enthalpy facility, Combustion, Explosion, and Shock Waves, 2007, Vol. 43, No. 5, P. 518–529.

    Article  Google Scholar 

  10. RF Patent No. 2439523, MPK G01M 9/02, Hot-shot wind tunnel / M.I. Yaroslavtsev, V.M. Fomin, A.A. Maslov, A.M. Meshcheryakov, L.N. Puzyrev, V.V. Shumsky, and A.S. Sokolovskii; Patent Applicant and Holder — Khristianovich Institute of Theoretical and Applied Mechanics, Russian Academy of Sciences, Siberian Branch, No. 2010129768/28; Appl. 07.16.2010, Publ. 01.10.2012.

  11. A.S. Korolev, B.V. Boshenyatov, I.G. Druker, and V.V. Zatoloka, Hot-Shot Wind Tunnels in Aerodynamic Research, Nauka, Novosibirsk, 1978.

    Google Scholar 

  12. V.V. Zatoloka, Hot-Shot Wind Tunnels, Nauka, Novosibirsk, 1986.

    Google Scholar 

  13. RF Patent No. 2436058, MPK G01M9/2, A wind tunnel / M.I. Yaroslavtsev, V.M. Fomin, A.A. Maslov, L.N. Puzyrev, and V.V. Shumsky; Patent Applicant and Holder — Khristianovich Institute of Theoretical and Applied Mechanics, Russian Academy of Science, Siberian Branch, No. 2010129903/28; Appl. 07.16.2010, Publ. 12.10.2011.

  14. A.A. Maslov, V.V. Shumsky, and M.I. Yaroslavtsev, Short-duration wind tunnel with combined heating and stabilization of parameters, J. Appl. Mech. Tech. Phys., 2012, Vol. 53, No. 6, P. 805–811.

    Article  ADS  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to A. A. Maslov.

Additional information

This work was financially supported by the Russian Foundation for Basic Research (Grant No. 12-08-00435-a) and by the Presidium of the Russian Academy of Science (Grant No. 25/12).

Rights and permissions

Reprints and permissions

About this article

Cite this article

Maslov, A.A., Shumsky, V.V. & Yaroslavtsev, M.I. High-enthalpy hot-shot wind tunnel with combined heating and stabilization of parameters. Thermophys. Aeromech. 20, 527–538 (2013). https://doi.org/10.1134/S0869864313050011

Download citation

  • Received:

  • Revised:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1134/S0869864313050011

Key words

Navigation