Abstract
Olympic sport venues are the stage upon which Olympic athletes perform and are a critical component for both athletes and spectators at Olympic Games. Venues built or modified specifically to host the Olympic Games have become a focus of international media attention in the years leading up to these events for a combination of their design, aesthetic impact, construction time frames, operational logistics, cost and questions regarding longer-term use and sustainability. Venues are sport specific, multi-sport and also include support venues such as the athlete village. The venues that have been able to reflect the local historic cultural context and aspirations of the host nation in their design, such as Barcelona’s swimming pool (Piscina Municipal de Montjuïc) with its panoramic views over Barcelona, or Beijing’s ‘Bird’s Nest’ National Stadium, have achieved iconic status and represent a strong architectural and cultural signature.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Bibliography
Aap. (2010). Acer Arena boss headed to Perth, Sydney Morning Herald. Retrieved from http://news.smh.com.au/breaking-news-national/acer-arenaboss-headed-to-perth-20100901–14n0w.html
Andranovich, G., Burbank, M. J., and Heying, C. H. (2001). Olympic cities: lessons learned from mega-event politics. Journal of Urban Affairs, 23 (2), 113–31.
Appleby, L. (2007). Legacy of Sydney Paralympics. Paper presented at the Taiwan Olympic Committee Event Management Seminar for Deaf Olympics and World Corporate Games, Taiwan–Cities of Taipei and Kaohsiung.
Barclay, J. (2009). Predicting the costs and benefits of mega-sporting events: Misjudgement of Olympic Proporations? Economic Affairs, 29(2), 62–6. 10.1111/j.1468-0270.2009.01896.x.
Beder, S. (2002). Environmentalists Help Manage Corporate Reputation: Changing Perceptions Not Behaviour. Working paper series: University of Wollongong.
Berkowitzc, P., Gjermano, G., Gomez, L., and Schafer, G. (2007). Brand China: Using the 2008 Olympic Games to enhance China’s image. Place Branding and Public Diplomacy 3(2), 164–78.
Beyer, S. (2006). The green Olympic movement: Beijing 2008. Chinese Journal of International Law, 5 (2), 423–40.
Cashman, R. (2006). The Bitter-Sweet Awakening: The Legacy of the Sydney 2000 Olympic Games: Walla Walla Press in conjunction with the Australian Centre for Olympic Studies, University of Technology, Sydney.
Cashman, R., and Darcy, S. (eds). (2008). Benchmark Games: The Sydney 2000 Paralympic Games. Petersham, NSW Australia: Walla Walla Press in conjunction with the Australian Centre for Olympic Studies.
Cashman, R., and Richmond, D. (eds). (2011). Sydney Olympic Park 2000 to 2010: History and Legacy. Petersham: Walla Walla Press.
Chalkley, B., and Essex, S. (1999a). Sydney 2000: The ‘Green Games’? Geography, 84 (4), 299–307.
Chalkley, B., and Essex, S. (1999b). Urban development through hosting international events: a history of the Olympic Games. Planning Perspectives, 14 (4), 369–94. doi:
Clapp, C. M., and Hakes, J. K. (2005). How long a honeymoon? The effect of New Stadiums on attendance in Major League Baseball. Journal of Sports Economics, 6 (3), 237–63.
Darcy, S. (2001). A games for everyone?: Planning for disability and access at the Sydney 2000 Games. Disability Studies Quarterly, 21 (3), 70–84.
Darcy, S. (2003). The politics of disability and access: The Sydney 2000 Games experience. Disability and Society, 18 (6), 737–57.
Darcy, S. (2008a). Planning. In R. Cashman and S. Darcy (eds), Benchmark Games: The Sydney 2000 Paralympic Games (pp. 74–98 ). Petersham, NSW Australia: Walla Walla Press in conjunction with the Australian Centre for Olympic Studies.
Darcy, S. (2008b). Infrastructure. In R. Cashman and S. Darcy (eds), Benchmark Games: The Sydney 2000 Paralympic Games (pp. 161–82 ). Petersham, NSW Australia: Walla Walla Press in conjunction with the Australian Centre for Olympic Studies.
Darcy, S., and Appleby, L. (2011). Sydney 2000: Moving from Post-Hoc Legacy to Strategic Vision and Operational Partnership. In D. Legg and K. Gilbert (eds), Paralympic Legacies (pp. 75–98 ). Champaign, IL USA: Common Ground Publishing LLC.
Darcy, S., and Cashman, R. (2008). Legacy. In R. Cashman and S. Darcy (eds), Benchmark Games: The Sydney 2000 Paralympic Games (pp. 218–31 ). Petersham, NSW Australia: Walla Walla Press in conjunction with the Australian Centre for Olympic Studies.
De Yong, J. (2008). What next: Beijing after the Olympics, Article, China Today, pp. 52–7. Retrieved from http://www.lib.uts.edu.au/sso/goto.php?url=http://search.ebscohost.com/login.aspx?direct=trueanddb=a9handAN=34793726andsite=ehost-live
Flyvbjerg, B., Holm, M. S., and Buhl, S. (2002). Underestimating costs in public works projects: Error or lie? Journal of the American Planning Association, 68 (3), 279–95.
Gold, J. R., and Gold, M. M. (2010). Olympic Cities: City Agendas, Planning and the World’s Games, 1896–2016. London: Taylor and Francis.
Gold, J. R., and Gold, M. M. (2011). Olympic Cities. City Agendas, Planning and the World’s Games, 1896–2016. Oxon: Routledge.
Heath, J. (1996). 1996 Atlanta Paralympic games. Link, 5 (4), 16–23.
Hindson, A. G., Gidlow, B., and Peebles, C. (1994). The trickle down effect of top level sport: Myth or reality? A case study of the Olympics. Australian Journal of Lesiure and Recreation, 4 (1), 16–24.
Hogan, K., and Norton, K. (2000). The ‘price’of Olympic gold. Journal of Science and Medicine in Sport, 3 (2), 203–18.
Horne, R., Verghese, K., and Grant, T. (2009). Life Cycle Assessment: Principles, Practice, and Prospects: Csiro.
Infrastructure Partnerships Australia. (Nd). Telstra Stadium, Sydney Olympic Park Sydney. Retrieved from http://www.google.com.au/url?sa=tandrct=jandq=andesrc=sandsource=webandcd=4andcts=1331418993282andved=0CFYQFjADandurl=http%3A%2F%2F http://www.infrastructure.org.au%2FDisplayFile.aspx%3FFileID3D13andei=b9ZbT6yuJsSNiAffoOy7DQandusg=AFQjCNETKnVUnpSK2PjQuu7pnnjlHoZHNgandsig2=Lbj81xCFP95P8yldoMkhXQ
International Facility Management Association. (2005). A Framework for Facilities Lifecycle Cost Management Core. Houston: International Facility Management Association.
International Olympic Committee. (1999). Olympic marketing: Ambush prevention and clean venue guidelines/International Olympic Committee. Retrieved from http://www.olympic.org/Documents/Host_city_elections/2020_CAP.pdf
International Olympic Committee. (2003). Olympic games study commission. Retrieved from http://www.olympic.org/Documents/Host_city_elections/2020_CAP.pdf
International Olympic Committee. (2004). 2012 Candidature Procedure and Questionnaire: Games of the XXX Olympiad in 2012. Lausanne: International Olympic Committee.
International Olympic Committee. (2005). Technical manual on brand protection. Retrieved from http://www.olympic.org/Documents/Host_city_elections/2020_CAP.pdf
International Olympic Committee. (2006). What Is the Olympic Games Global Impact Study?’ Olympic Review. Lausanne: International Olympic Committee
International Olympic Committee. (2011). 2020 Candidature acceptance procedure. Retrieved from http://www.olympic.org/Documents/Host_city_elections/2020_CAP.pdf
International Olympic Committee. (2012). Choice of the host city—lifecycle planning. Retrieved 10 March, 2012, from http://www.olympic.org/host-city-election
International Paralympic Commitee. (2009). Accessibility guide: An inclusive approach to the olympic and paralympic games. Retrieved from http://www.paralympic.org/IPC/Documentation_Centre/.
International Paralympic Commitee. (2012). Principles. Retrieved from http://www.paralympic.org/IPC/Documentation_Centre/.
Jefferies, M., Gameson, R., and Rowlinson, S. (2002). Critical success factors of the BOOT procurement system: reflections from the Stadium Australia case study. Engineering Construction and Architectural Management, 9 (4), 352–61.
Kearins, K., and Pavlovich, K. (2002). The role of stakeholders in Sydney’s Green Games. Corporate Social Responsibility and Environmental Management, 9 (3), 157–69.
Kelso, P. (2008, April 9). Budget for Olympic aquatic centre triples, The Guardian. Retrieved from http://www.guardian.co.uk/sport/2008/apr/09/athletics.olympics2012.
Kent, M. (2006). Paying off the Montreal Olympic debt—Quebec’s Big Owe stadium debt is over. CBS News Monteal. Retrieved from http://www.cbc.ca/news/canada/montreal/story/2006/12/19/qc-olympicstadium.html will.
Liu, Y. W., Zhao, G. F., and Wang, S. Q. (2010). Many hands, much politics, multiple risks—The Case of the 2008 Beijing Olympics Stadium. Australian Journal of Public Administration, 69, S85–S98. doi: 10.1111/j.1467-8500.2009.00661.x.
Long, J. G. (2005). Full count: The real cost of public funding for Major League Sports Facilities. Journal of Sports Economics 6(2), 119–143. doi:10.1177/1527002504264614.
Major Stadia Task Force. (2007). Perth stadium feasibility report–The stadium and the city: Volume 1 Vol. 1. Making the Case for a World-Class Stadium in Perth. Retrieved from http://www.dsr.wa.gov.au/assets/files/Major%20Stadium/The%20Stadium%20and%20the%20City%20Vol%201.pdf.
Mangan, J. A. (2008). Prologue: Guarantees of global goodwill: Post-olympic legacies–too many limping White Elephants? International Journal of the History of Sport, 25 (14), 1869–83.
Myer, A., and Chaffee, C. (1997). Life-cycle analysis for design of the Sydney Olympic Stadium. Renewable Energy, 10(2–3), 169–72. doi: 10.1016/0960-1481(96)00058-4.
Nimmo, A., Wright, S., and Coulson, D. (2011). Delivering London 2012: temporary venues. Proceedings of the Institution of Civil Engineers. Civil Engineering, 164 (6), 59–64. doi: 10.1680/cien.2011.164.6.59.
Olympic Co-ordination Authority. (1996). Access Guidelines (1st edn). Sydney: Olympic Co-ordination Authority.
Olympic Co-ordination Authority. (1998). Access Guidelines ( 2nd edn ). Sydney: Olympic Co-ordination Authority.
Olympic Co-ordination Authority. (1999). Access Guidelines ( 3rd edn ). Sydney: Olympic Co-ordination Authority.
Olympic Co-ordination Authority. (2000). Sydney 2000 Access Guide to the Olympic and Paralympic Games. Homebush Bay, N.S.W: Olympic Co-ordination Authority.
Olympic Co-ordination Authority. (2001). Accessible Operations Post Game Report– Sydney 2000 Olympic and Paralympics Games. Sydney: Olympic Co-ordination Authority.
Robinson, J. A., and Torvik, R. (2005). White elephants. Journal of Public Economics, 89 (2–3), 197–210.
Russo, F. E., Esckilsen, L. A., and Stewart, R. J. (2009). Public Assembly Facility Management: Principles and Practices ( 2nd edn ). Coppel, TX: International Association of Assembly Managers.
Scherer, J. (2011). Olympic Villages and Large-Scale urban development: Crises of capitalism, deficits of democracy? Sociology, 45 (5), 782–97.
Scherer, J., Sam, M., and Batty, R. (2005). Sporting sign wars: advertising and the contested terrain of sporting events and venues. International Journal of Sport Management and Marketing, 1 (1), 17–36.
Searle, G. (2002). Uncertain legacy: Sydney’s Olympic stadiums. European Planning Studies, 10 (7), 845–60.
Shirbin, J. (1999). The Olympic Stadium: Innovation in project financing. University of New South Wales Law Journal, 22 (3), 29.
Sydney Olympic Park Authority. (2009). Master Plan 2030. Homebush Bay, N.S.W.: Sydney Olympic Park Authority.
The Elephant Conservation Centre. (2010). The Royal Elephant stable. Retrieved 1 January, 2012, from http://www.thailandelephant.org/en/royalstable.html
Toohey, K. (2008). The Sydney Olympics: striving for legacies–overcoming short-term disappointments and long-term deficiencies. The International Journal of the History of Sport, 25 (14), 1953–71.
Vanoc. (2007). Olympic Games Impact Program: Baseline Report. Vancouver: VANOC.
VanWynsberghe, R., Bischel, T., Gatzeva, M., Hambrock, M., Kwan, B., and Lim, C. (2011). Olympic Games Impact (OGI) Study for the 2010 Olympic and Paralympic Winter Games Games-time Report. Vancouver: Prepared by The OGIUBC Research Team for the Vancouver Organizing Committee for the 2010 Olympic and Paralympic Games (VANOC).
Veal, A. J. (2011). Leisure, Sport and Tourism: Politics, Policy and Planning ( 3rd ed. ). Wallingford, Oxon, UK: CABI Publishing.
Weed, M., Coren, E., Fiore, J., Chatziefstathiou, D., Mansfield, L., and Wellard, I. (2008). A systematic review of the evidence base for developing a physical activity, sport and health legacy from the London 2012 Olympic and Paralympic Games. Canterbury: Centre for Sport, Physical Education and Activity Research (SPEAR), Canterbury Christ Church University.
Westerbeek, H., Smith, A., Turner, P., Emry, P., Green, C., and van Leeuwen, L. (2005). Managing Sport Facilities and Major Events. Sydney: Allen and Unwin.
Zou, P. X. W., and Leslie-Carter, R. (2010). Lessons learned from managing the design of the ‘Water Cube’ National Swimming Centre for the Beijing 2008 Olympic Games. Architectural Engineering and Design Management, 6(3), 175–88.
Editor information
Editors and Affiliations
Copyright information
© 2013 Simon Darcy and Tracy Taylor
About this chapter
Cite this chapter
Darcy, S., Taylor, T. (2013). Managing Olympic Venues. In: Frawley, S., Adair, D. (eds) Managing the Olympics. Palgrave Macmillan, London. https://doi.org/10.1057/9780230389588_7
Download citation
DOI: https://doi.org/10.1057/9780230389588_7
Publisher Name: Palgrave Macmillan, London
Print ISBN: 978-1-349-35119-0
Online ISBN: 978-0-230-38958-8
eBook Packages: Palgrave Business & Management CollectionBusiness and Management (R0)