Skip to main content

Managing Olympic Venues

  • Chapter
Book cover Managing the Olympics

Abstract

Olympic sport venues are the stage upon which Olympic athletes perform and are a critical component for both athletes and spectators at Olympic Games. Venues built or modified specifically to host the Olympic Games have become a focus of international media attention in the years leading up to these events for a combination of their design, aesthetic impact, construction time frames, operational logistics, cost and questions regarding longer-term use and sustainability. Venues are sport specific, multi-sport and also include support venues such as the athlete village. The venues that have been able to reflect the local historic cultural context and aspirations of the host nation in their design, such as Barcelona’s swimming pool (Piscina Municipal de Montjuïc) with its panoramic views over Barcelona, or Beijing’s ‘Bird’s Nest’ National Stadium, have achieved iconic status and represent a strong architectural and cultural signature.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 109.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 139.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 129.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Bibliography

  • Aap. (2010). Acer Arena boss headed to Perth, Sydney Morning Herald. Retrieved from http://news.smh.com.au/breaking-news-national/acer-arenaboss-headed-to-perth-20100901–14n0w.html

  • Andranovich, G., Burbank, M. J., and Heying, C. H. (2001). Olympic cities: lessons learned from mega-event politics. Journal of Urban Affairs, 23 (2), 113–31.

    Article  Google Scholar 

  • Appleby, L. (2007). Legacy of Sydney Paralympics. Paper presented at the Taiwan Olympic Committee Event Management Seminar for Deaf Olympics and World Corporate Games, Taiwan–Cities of Taipei and Kaohsiung.

    Google Scholar 

  • Barclay, J. (2009). Predicting the costs and benefits of mega-sporting events: Misjudgement of Olympic Proporations? Economic Affairs, 29(2), 62–6. 10.1111/j.1468-0270.2009.01896.x.

    Article  Google Scholar 

  • Beder, S. (2002). Environmentalists Help Manage Corporate Reputation: Changing Perceptions Not Behaviour. Working paper series: University of Wollongong.

    Google Scholar 

  • Berkowitzc, P., Gjermano, G., Gomez, L., and Schafer, G. (2007). Brand China: Using the 2008 Olympic Games to enhance China’s image. Place Branding and Public Diplomacy 3(2), 164–78.

    Article  Google Scholar 

  • Beyer, S. (2006). The green Olympic movement: Beijing 2008. Chinese Journal of International Law, 5 (2), 423–40.

    Article  Google Scholar 

  • Cashman, R. (2006). The Bitter-Sweet Awakening: The Legacy of the Sydney 2000 Olympic Games: Walla Walla Press in conjunction with the Australian Centre for Olympic Studies, University of Technology, Sydney.

    Google Scholar 

  • Cashman, R., and Darcy, S. (eds). (2008). Benchmark Games: The Sydney 2000 Paralympic Games. Petersham, NSW Australia: Walla Walla Press in conjunction with the Australian Centre for Olympic Studies.

    Google Scholar 

  • Cashman, R., and Richmond, D. (eds). (2011). Sydney Olympic Park 2000 to 2010: History and Legacy. Petersham: Walla Walla Press.

    Google Scholar 

  • Chalkley, B., and Essex, S. (1999a). Sydney 2000: The ‘Green Games’? Geography, 84 (4), 299–307.

    Google Scholar 

  • Chalkley, B., and Essex, S. (1999b). Urban development through hosting international events: a history of the Olympic Games. Planning Perspectives, 14 (4), 369–94. doi:

    Article  Google Scholar 

  • Clapp, C. M., and Hakes, J. K. (2005). How long a honeymoon? The effect of New Stadiums on attendance in Major League Baseball. Journal of Sports Economics, 6 (3), 237–63.

    Article  Google Scholar 

  • Darcy, S. (2001). A games for everyone?: Planning for disability and access at the Sydney 2000 Games. Disability Studies Quarterly, 21 (3), 70–84.

    Google Scholar 

  • Darcy, S. (2003). The politics of disability and access: The Sydney 2000 Games experience. Disability and Society, 18 (6), 737–57.

    Article  Google Scholar 

  • Darcy, S. (2008a). Planning. In R. Cashman and S. Darcy (eds), Benchmark Games: The Sydney 2000 Paralympic Games (pp. 74–98 ). Petersham, NSW Australia: Walla Walla Press in conjunction with the Australian Centre for Olympic Studies.

    Google Scholar 

  • Darcy, S. (2008b). Infrastructure. In R. Cashman and S. Darcy (eds), Benchmark Games: The Sydney 2000 Paralympic Games (pp. 161–82 ). Petersham, NSW Australia: Walla Walla Press in conjunction with the Australian Centre for Olympic Studies.

    Google Scholar 

  • Darcy, S., and Appleby, L. (2011). Sydney 2000: Moving from Post-Hoc Legacy to Strategic Vision and Operational Partnership. In D. Legg and K. Gilbert (eds), Paralympic Legacies (pp. 75–98 ). Champaign, IL USA: Common Ground Publishing LLC.

    Google Scholar 

  • Darcy, S., and Cashman, R. (2008). Legacy. In R. Cashman and S. Darcy (eds), Benchmark Games: The Sydney 2000 Paralympic Games (pp. 218–31 ). Petersham, NSW Australia: Walla Walla Press in conjunction with the Australian Centre for Olympic Studies.

    Google Scholar 

  • De Yong, J. (2008). What next: Beijing after the Olympics, Article, China Today, pp. 52–7. Retrieved from http://www.lib.uts.edu.au/sso/goto.php?url=http://search.ebscohost.com/login.aspx?direct=trueanddb=a9handAN=34793726andsite=ehost-live

    Google Scholar 

  • Flyvbjerg, B., Holm, M. S., and Buhl, S. (2002). Underestimating costs in public works projects: Error or lie? Journal of the American Planning Association, 68 (3), 279–95.

    Article  Google Scholar 

  • Gold, J. R., and Gold, M. M. (2010). Olympic Cities: City Agendas, Planning and the World’s Games, 1896–2016. London: Taylor and Francis.

    Google Scholar 

  • Gold, J. R., and Gold, M. M. (2011). Olympic Cities. City Agendas, Planning and the World’s Games, 1896–2016. Oxon: Routledge.

    Google Scholar 

  • Heath, J. (1996). 1996 Atlanta Paralympic games. Link, 5 (4), 16–23.

    Google Scholar 

  • Hindson, A. G., Gidlow, B., and Peebles, C. (1994). The trickle down effect of top level sport: Myth or reality? A case study of the Olympics. Australian Journal of Lesiure and Recreation, 4 (1), 16–24.

    Google Scholar 

  • Hogan, K., and Norton, K. (2000). The ‘price’of Olympic gold. Journal of Science and Medicine in Sport, 3 (2), 203–18.

    Article  Google Scholar 

  • Horne, R., Verghese, K., and Grant, T. (2009). Life Cycle Assessment: Principles, Practice, and Prospects: Csiro.

    Google Scholar 

  • Infrastructure Partnerships Australia. (Nd). Telstra Stadium, Sydney Olympic Park Sydney. Retrieved from http://www.google.com.au/url?sa=tandrct=jandq=andesrc=sandsource=webandcd=4andcts=1331418993282andved=0CFYQFjADandurl=http%3A%2F%2F http://www.infrastructure.org.au%2FDisplayFile.aspx%3FFileID3D13andei=b9ZbT6yuJsSNiAffoOy7DQandusg=AFQjCNETKnVUnpSK2PjQuu7pnnjlHoZHNgandsig2=Lbj81xCFP95P8yldoMkhXQ

  • International Facility Management Association. (2005). A Framework for Facilities Lifecycle Cost Management Core. Houston: International Facility Management Association.

    Google Scholar 

  • International Olympic Committee. (1999). Olympic marketing: Ambush prevention and clean venue guidelines/International Olympic Committee. Retrieved from http://www.olympic.org/Documents/Host_city_elections/2020_CAP.pdf

    Google Scholar 

  • International Olympic Committee. (2003). Olympic games study commission. Retrieved from http://www.olympic.org/Documents/Host_city_elections/2020_CAP.pdf

    Google Scholar 

  • International Olympic Committee. (2004). 2012 Candidature Procedure and Questionnaire: Games of the XXX Olympiad in 2012. Lausanne: International Olympic Committee.

    Google Scholar 

  • International Olympic Committee. (2005). Technical manual on brand protection. Retrieved from http://www.olympic.org/Documents/Host_city_elections/2020_CAP.pdf

    Google Scholar 

  • International Olympic Committee. (2006). What Is the Olympic Games Global Impact Study?’ Olympic Review. Lausanne: International Olympic Committee

    Google Scholar 

  • International Olympic Committee. (2011). 2020 Candidature acceptance procedure. Retrieved from http://www.olympic.org/Documents/Host_city_elections/2020_CAP.pdf

    Google Scholar 

  • International Olympic Committee. (2012). Choice of the host city—lifecycle planning. Retrieved 10 March, 2012, from http://www.olympic.org/host-city-election

    Google Scholar 

  • International Paralympic Commitee. (2009). Accessibility guide: An inclusive approach to the olympic and paralympic games. Retrieved from http://www.paralympic.org/IPC/Documentation_Centre/.

    Google Scholar 

  • International Paralympic Commitee. (2012). Principles. Retrieved from http://www.paralympic.org/IPC/Documentation_Centre/.

    Google Scholar 

  • Jefferies, M., Gameson, R., and Rowlinson, S. (2002). Critical success factors of the BOOT procurement system: reflections from the Stadium Australia case study. Engineering Construction and Architectural Management, 9 (4), 352–61.

    Article  Google Scholar 

  • Kearins, K., and Pavlovich, K. (2002). The role of stakeholders in Sydney’s Green Games. Corporate Social Responsibility and Environmental Management, 9 (3), 157–69.

    Article  Google Scholar 

  • Kelso, P. (2008, April 9). Budget for Olympic aquatic centre triples, The Guardian. Retrieved from http://www.guardian.co.uk/sport/2008/apr/09/athletics.olympics2012.

    Google Scholar 

  • Kent, M. (2006). Paying off the Montreal Olympic debt—Quebec’s Big Owe stadium debt is over. CBS News Monteal. Retrieved from http://www.cbc.ca/news/canada/montreal/story/2006/12/19/qc-olympicstadium.html will.

    Google Scholar 

  • Liu, Y. W., Zhao, G. F., and Wang, S. Q. (2010). Many hands, much politics, multiple risks—The Case of the 2008 Beijing Olympics Stadium. Australian Journal of Public Administration, 69, S85–S98. doi: 10.1111/j.1467-8500.2009.00661.x.

    Google Scholar 

  • Long, J. G. (2005). Full count: The real cost of public funding for Major League Sports Facilities. Journal of Sports Economics 6(2), 119–143. doi:10.1177/1527002504264614.

    Article  Google Scholar 

  • Major Stadia Task Force. (2007). Perth stadium feasibility report–The stadium and the city: Volume 1 Vol. 1. Making the Case for a World-Class Stadium in Perth. Retrieved from http://www.dsr.wa.gov.au/assets/files/Major%20Stadium/The%20Stadium%20and%20the%20City%20Vol%201.pdf.

    Google Scholar 

  • Mangan, J. A. (2008). Prologue: Guarantees of global goodwill: Post-olympic legacies–too many limping White Elephants? International Journal of the History of Sport, 25 (14), 1869–83.

    Article  Google Scholar 

  • Myer, A., and Chaffee, C. (1997). Life-cycle analysis for design of the Sydney Olympic Stadium. Renewable Energy, 10(2–3), 169–72. doi: 10.1016/0960-1481(96)00058-4.

    Article  Google Scholar 

  • Nimmo, A., Wright, S., and Coulson, D. (2011). Delivering London 2012: temporary venues. Proceedings of the Institution of Civil Engineers. Civil Engineering, 164 (6), 59–64. doi: 10.1680/cien.2011.164.6.59.

    Google Scholar 

  • Olympic Co-ordination Authority. (1996). Access Guidelines (1st edn). Sydney: Olympic Co-ordination Authority.

    Google Scholar 

  • Olympic Co-ordination Authority. (1998). Access Guidelines ( 2nd edn ). Sydney: Olympic Co-ordination Authority.

    Google Scholar 

  • Olympic Co-ordination Authority. (1999). Access Guidelines ( 3rd edn ). Sydney: Olympic Co-ordination Authority.

    Google Scholar 

  • Olympic Co-ordination Authority. (2000). Sydney 2000 Access Guide to the Olympic and Paralympic Games. Homebush Bay, N.S.W: Olympic Co-ordination Authority.

    Google Scholar 

  • Olympic Co-ordination Authority. (2001). Accessible Operations Post Game Report– Sydney 2000 Olympic and Paralympics Games. Sydney: Olympic Co-ordination Authority.

    Google Scholar 

  • Robinson, J. A., and Torvik, R. (2005). White elephants. Journal of Public Economics, 89 (2–3), 197–210.

    Article  Google Scholar 

  • Russo, F. E., Esckilsen, L. A., and Stewart, R. J. (2009). Public Assembly Facility Management: Principles and Practices ( 2nd edn ). Coppel, TX: International Association of Assembly Managers.

    Google Scholar 

  • Scherer, J. (2011). Olympic Villages and Large-Scale urban development: Crises of capitalism, deficits of democracy? Sociology, 45 (5), 782–97.

    Article  Google Scholar 

  • Scherer, J., Sam, M., and Batty, R. (2005). Sporting sign wars: advertising and the contested terrain of sporting events and venues. International Journal of Sport Management and Marketing, 1 (1), 17–36.

    Article  Google Scholar 

  • Searle, G. (2002). Uncertain legacy: Sydney’s Olympic stadiums. European Planning Studies, 10 (7), 845–60.

    Article  Google Scholar 

  • Shirbin, J. (1999). The Olympic Stadium: Innovation in project financing. University of New South Wales Law Journal, 22 (3), 29.

    Google Scholar 

  • Sydney Olympic Park Authority. (2009). Master Plan 2030. Homebush Bay, N.S.W.: Sydney Olympic Park Authority.

    Google Scholar 

  • The Elephant Conservation Centre. (2010). The Royal Elephant stable. Retrieved 1 January, 2012, from http://www.thailandelephant.org/en/royalstable.html

    Google Scholar 

  • Toohey, K. (2008). The Sydney Olympics: striving for legacies–overcoming short-term disappointments and long-term deficiencies. The International Journal of the History of Sport, 25 (14), 1953–71.

    Article  Google Scholar 

  • Vanoc. (2007). Olympic Games Impact Program: Baseline Report. Vancouver: VANOC.

    Google Scholar 

  • VanWynsberghe, R., Bischel, T., Gatzeva, M., Hambrock, M., Kwan, B., and Lim, C. (2011). Olympic Games Impact (OGI) Study for the 2010 Olympic and Paralympic Winter Games Games-time Report. Vancouver: Prepared by The OGIUBC Research Team for the Vancouver Organizing Committee for the 2010 Olympic and Paralympic Games (VANOC).

    Google Scholar 

  • Veal, A. J. (2011). Leisure, Sport and Tourism: Politics, Policy and Planning ( 3rd ed. ). Wallingford, Oxon, UK: CABI Publishing.

    Google Scholar 

  • Weed, M., Coren, E., Fiore, J., Chatziefstathiou, D., Mansfield, L., and Wellard, I. (2008). A systematic review of the evidence base for developing a physical activity, sport and health legacy from the London 2012 Olympic and Paralympic Games. Canterbury: Centre for Sport, Physical Education and Activity Research (SPEAR), Canterbury Christ Church University.

    Google Scholar 

  • Westerbeek, H., Smith, A., Turner, P., Emry, P., Green, C., and van Leeuwen, L. (2005). Managing Sport Facilities and Major Events. Sydney: Allen and Unwin.

    Google Scholar 

  • Zou, P. X. W., and Leslie-Carter, R. (2010). Lessons learned from managing the design of the ‘Water Cube’ National Swimming Centre for the Beijing 2008 Olympic Games. Architectural Engineering and Design Management, 6(3), 175–88.

    Article  Google Scholar 

Download references

Authors

Editor information

Editors and Affiliations

Copyright information

© 2013 Simon Darcy and Tracy Taylor

About this chapter

Cite this chapter

Darcy, S., Taylor, T. (2013). Managing Olympic Venues. In: Frawley, S., Adair, D. (eds) Managing the Olympics. Palgrave Macmillan, London. https://doi.org/10.1057/9780230389588_7

Download citation

Publish with us

Policies and ethics