Skip to main content
Log in

Commissioning progress of the FAST

  • Invited Review
  • Published:
Science China Physics, Mechanics & Astronomy Aims and scope Submit manuscript

Abstract

The Five-hundred-meter Aperture Spherical radio Telescope (FAST) was completed with its main structure installed on September 25, 2016, after which it entered the commissioning phase. This paper aims to introduce the commissioning progress of the FAST over the past two years. To improve its operational reliability and ensure effective observation time, FAST has been equipped with a real-time information system for the active reflector system and hierarchical commissioning scheme for the feed support system, which ultimately achieves safe operation of the two systems. For meeting the high-performance indices, a high-precision measurement system was set up based on the effective control methods that were implemented for the active reflector system and feed support system. Since the commissioning of the FAST, a low-frequency ultra-wideband receiver and 19-beam 1.05-1.45 GHz receiver have been mainly used. Telescope efficiency, pointing accuracy, and system noise temperature were completely tested and ultimately achieved the acceptance indices of the telescope. The FAST has been in the process of national acceptance preparations and has begun to search for pulsars. In the future, it will still strive to improve its capabilities and expand its application prospects.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Similar content being viewed by others

References

  1. R. Nan, Sci China Ser G-Phys. Mech. Astron. 49, 129 (2006).

    Article  ADS  Google Scholar 

  2. R. Nan, D. Li, C. Jin, Q. Wang, L. Zhu, W. Zhu, H. Zhang, Y. Yue, and L. Qian, Int. J. Mod. Phys. D 20, 989 (2011), arXiv: 1105.3794.

    Article  ADS  Google Scholar 

  3. L. Qian, Z. C. Pan. D. Li. G. Hobbs, W. W. Zhu, P. Wang, Z. J. Liu, Y. L. Yue, Y. Zhu, H. F. Liu, D. J. Yu, J. H. Sun, P. Jiang, G. F. Pan, H. Li, H. Q. Gan, R. Yao, X. Y. Xie, F. Camilo, A. Cameron, L. Zhang, S. Wang, and FAST Collaboration, Sci. China-Phys. Mech. Astron. 62, 959508 (2019), arXiv: 1903.06318.

    Article  Google Scholar 

  4. K. Zhang, J. W. Wu, D. Li, M. Krco, L. Staveley-Smith, N. Y. Tang, L. Qian, M. T. Liu, C. J. Jin, Y. L. Yue, Y. Zhu, H. F. Liu, D. J. Yu, J. H. Sun, G. F. Pan, H. Li, H. Q. Gan, R. Yao, and FAST Collaboration, Sci. China-Phys. Mech. Astron. 62, 959506 (2019), arXiv: 1903.06402.

    Article  Google Scholar 

  5. Y.-Z. Yu, B. Peng, K. Liu, C. M. Zhang, L. Wang, F. F. Kou, J. G. Lu, M. Yu, and FAST Collaboration, Sci. China-Phys. Mech. Astron. 62, 959504 (2019), arXiv: 1903.06357.

    Article  Google Scholar 

  6. J. G. Lu, B. Peng, K. Liu, P. Jiang, Y. L. Yue, M. Yu, Y.-Z. Yu, F. F. Kou, L. Wang, and FAST Collaboration, Sci. China-Phys. Mech. Astron. 62, 959503 (2019), arXiv: 1903.06364.

    Article  Google Scholar 

  7. J. G. Lu, B. Peng, R. X. Xu, M. Yu, S. Dai, W. W. Zhu, Y.-Z. Yu, P. Jiang, Y. L. Yue, L. Wang, and FAST Collaboration, Sci. China-Phys. Mech. Astron. 62, 959505 (2019), arXiv: 1903.06362.

    Article  Google Scholar 

  8. H. F. Wang, W. W. Zhu, P. Guo, D. Li, S. B. Feng, Q. Yin, C. C. Miao, Z. Z. Tao, Z. C. Pan, P. Wang, X. Zheng, X. D. Deng, Z. J. Liu, X. Y. Xie, X. H. Yu, S. P. You, H. Zhang, and FAST Collaboration, Sci. China-Phys. Mech. Astron. 62, 959507 (2019), arXiv: 1903.06383.

    Article  Google Scholar 

  9. P. Jiang, R. D. Nan, L. Qian, and Y. L. Yue, Res. Astron. Astrophys. 15, 10 (2015).

    Google Scholar 

  10. P. Jiang, Q. W. Li, and R. D. Nan, Res. Astron. Astrophys. 17, 9 (2017).

    Article  ADS  Google Scholar 

  11. P. Jiang, Q. W. Li, and R. D. Nan, J. Mech. Eng. 53, 17 (2017).

    Google Scholar 

  12. X. Tang, and R. Yao, J. Mech. Des. 133, 111012 (2011).

    Article  Google Scholar 

  13. R. Yao, W. Zhu, and C. Sun, Adv. Mech. Eng. 6: 209167 (2014).

    Article  Google Scholar 

  14. H. Li, and R. Yao, Adv. Mech. Eng. 6: 716097 (2014).

    Article  Google Scholar 

  15. H. Li, J. H. Sun, G. F. Pan, and Q. G. Yang, Cable-Driven Parall. Robots 53, 402 (2017).

    Article  Google Scholar 

  16. R. Yao, Q. W. Li, J. H. Sun, and W. B. Zhu, J. Mech. Eng. 53, 36 (2017).

    Article  Google Scholar 

  17. B. N. Song, L. C. Zhu, and D. J. Yu, J. Guizhou Univ. 31, 6 (2014).

    Google Scholar 

  18. R. W. Zhou, L. C. Zhu, J. W. Hu, and W. M. Li, Astron. Res. Technol. 9, 1 (2012).

    Google Scholar 

  19. Z. F. Bian, Surveying (China Agriculture Press, Beijing, 2002).

    Google Scholar 

  20. H. Liu, and S. Weinreb, Microw. Opt. Technol. Lett. 59, 2229 (2017).

    Article  Google Scholar 

  21. R. A. Perley, and B. J. Butler, Astrophys. J. Suppl. Ser. 204, 19 (2013), arXiv: 1211.1300.

    Article  ADS  Google Scholar 

  22. C. Jin, K. Zhu, J. Fan, H. Liu, Y. Zhu, H. Gan, J. Yu, Z. Gao, Y. Wu, and H. Zhang, The optics of the five-hundred-meter aperture spherical radio telescope: Proceedings of the International Symposium on Antennas & Propagation (IEEE, New York, 2013).

    Google Scholar 

  23. B. Song, L. Zhu, D. Yu, and H. Yuan, The Application of BDS/GPS/GLONASS Data Fusion in FAST Measurement: China Satellite Navigation Conference (CSNC) edited by J. Sun, J. Liu, Y. Yang, S. Fan, and W. Yu (Springer, Singapore, 2017).

Download references

Author information

Authors and Affiliations

Authors

Consortia

Corresponding authors

Correspondence to Peng Jiang, Rui Yao or Bo Peng.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Jiang, P., Yue, Y., Gan, H. et al. Commissioning progress of the FAST. Sci. China Phys. Mech. Astron. 62, 959502 (2019). https://doi.org/10.1007/s11433-018-9376-1

Download citation

  • Received:

  • Accepted:

  • Published:

  • DOI: https://doi.org/10.1007/s11433-018-9376-1

Keywords

Navigation