Abstract
SBA of complex products is a system engineering, which includes collaboration of personnel/organization, management and technology. All the activities involved in equipment system and the life-cycle require the support of comprehensive management. Research on management of SBA life-cycle is introduced in this paper. An evaluation indicator system is given with the analysis of SBA risk. Based on cost breakdown structure (CBS), a method of cost estimation is proposed. Moreover, a schedule prediction method using arrow diagramming method (ADM) and Monte-Carlo simulation is provided. Finally, with the application on SBA of one aircraft, the methods proposed in this paper are demonstrated.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Frost, R.: Simulation Based Acquisition, The Road Map. 99S-SIW-147.doc
Di, Y.-Q., Li, B.-H., Chai, X.-D., Wang, P.: Research of multi-disciplines virtual prototype collaborative modeling and simulation platform and key technology. Computer Integrated Manufacturing System 11(7), 901–908 (2005)
Li, B.-H., Chai, X.-D., Zhu, H.-W., Sun, J.-G., Liang, B.-C., Wu, H.-Z., Peng, X.-Y.: The research of environment supporting technology if SBA. Journal of System Simulation 16(2), 181–185 (2004) (in Chinese)
Ren, Z.-Y., Ni, H.-Y.: Inspiration of American acquisition reform to our army. Technology Foundation of National Defense (2), 55–57 (2010) (in Chinese)
Zhou, Y.-D., Zhang, D.-P., Li, Y.-H.: Analysis of American progressive acquisition experience. Journal of the Academy of Equipment 19(4), 25–29 (2008) (in Chinese)
Dong, H.-L., Zhang, H.: Inspiration of American life-cycle equipment management to our army. Journal of Pla Nanjing INSTITUDE of Politics 3(134), 58–61 (2007) (in Chinese)
Hu, J.-X., Li, S.-S., Liu, Z.-T., Yan, J.-W.: Research of American space equipment acquisition risk control system 27(1), 118–120 (2010) (in Chinese)
International Standard IEC 300-3-3 Life Cycle Costing 9 (1996)
Sun, H.-B.: Research and Realization of Artillery complex product cost estimation method. National University of Technology Graduate Academy (2002) (in Chinese)
Zhong, D.-H., Liu, K.-J., Yang, X.-G.: Research of process flexible network’s Uncertainty. System Engineering (2), 107–112 (2005) (in Chinese)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2012 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Wang, A., Chai, X., Li, H., Qu, H. (2012). Research on Risk Management Technology of Complex Products SBA Life-Cycle. In: Xiao, T., Zhang, L., Ma, S. (eds) System Simulation and Scientific Computing. ICSC 2012. Communications in Computer and Information Science, vol 326. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-34381-0_39
Download citation
DOI: https://doi.org/10.1007/978-3-642-34381-0_39
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-34380-3
Online ISBN: 978-3-642-34381-0
eBook Packages: Computer ScienceComputer Science (R0)