Abstract
Selection of the optimal variant for opening and development of the opencast mine is based on the organized, systematized and fundamental research of different natural, technical and economic mining project determinants. This is necessary but not sufficient condition for successful implementation of the mining projects. Mining capital projects, such as are the opening of new opencast mines, are very complex due to the influence of a number of internal and external technical, technological, economic and natural factors and the limitations resulting from the natural deposit conditions as well as from the socio - economic environment. Environment of the project for the opening of the opencast coal mine Radljevo is very complex and involves a series of deterministic and stochastic processes. In order to manage efficiently and effectively the project, it is necessary to synthesize a large number of skills, tools and techniques in the project management development plan, which is ensured by a good project management, achieving a better project results.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Charvat, J.: Project Management Methodologies - Selecting, Implementing, and Supporting Methodologies and Processes for Projects. John Wiley & Sons Inc. (2003)
Harvard Business School: Project management manual (1997)
Kerzner, H.: Project Management: A Systems Approach to Planning, 8th edn. John Wiley & Sons, Inc., Hoboken (2003)
Kerzner, H.: Strategic Planning for Project Management using a Project Management Maturity. John Wiley & Sons, Inc. (2001)
Maylor, H.: Project management, 3rd edn. Prentice Hall (2003)
Guide, P.A.: to the Project Management Body of Knowledge (PMBOK Guide), 4th edn. Project management Institute (2010)
Smith, N.J.: Engineering Project Management. Blackwell Publishing (2009)
Zambruski, M.: A Standard for enterprise project management. CRC Press (2009)
Feasibility Study with Preliminary Coal Mining Design at Opencast Mine Radljevo, Vattenfall Europe Mining AG and University in Belgrade, Mining and Geology Faculty (2010)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2015 Springer International Publishing Switzerland
About this paper
Cite this paper
Ivos, V., Mitrović, S., Vučetić, A. (2015). Project Management Model for Opening of the Opencast Mine Radljevo in the Kolubara Coal Basin. In: Niemann-Delius, C. (eds) Proceedings of the 12th International Symposium Continuous Surface Mining - Aachen 2014. Lecture Notes in Production Engineering. Springer, Cham. https://doi.org/10.1007/978-3-319-12301-1_37
Download citation
DOI: https://doi.org/10.1007/978-3-319-12301-1_37
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-12300-4
Online ISBN: 978-3-319-12301-1
eBook Packages: EngineeringEngineering (R0)