Abstract
Prior research on global information systems development (ISD) outsourcing projects and new product development identifies several management challenges, including the mitigation of cultural differences that can jeopardize project success. Despite the common mantra that greater distance makes ISD more critical, a growing body of literature on global virtual teams and internationally standardized codes of conduct suggests that they are becoming increasingly uniform. The concept of culture may thus increasingly refer to context-specific and dynamic professional cultures, rather than being solely embedded and statically rooted in national culture. In this chapter we show that with the globalization of IT project-management standards, alignment of professional practices and a maturing market for ISD off shoring, fewer culture-related conflicts appear to be emerging.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Anderson, J. C. and Narus, J. A. (1990), ‘A model of distributor firm and manufacturer firm working partnerships’, Journal of Marketing, 54(1): 42–58.
Beck, R., Gregory, R., and Prifling, M. (2008), ‘Cultural intelligence and project management interplay in IT offshore outsourcing projects’, Proceedings of the 29th International Conference on Information Systems, Paris.
Blumenberg, S., Beimbom, D., and König, W. (2008), ‘Determinants of IT outsourcing relationships: A conceptual model’, Proceedings of the 41st Hawaii International Conference on System Sciences, IEEE Computer Society, Hawaii, USA.
Bradford, K. D., Stringfellow, A., and Weitz, B.A. (2004), ‘Managing conflict to improve the effectiveness of retail networks’, Journal of Retailing, 80(3): 181–195.
David, C.G., Chand, D., Newell, S., and Resende-Santos, J. (2008), ‘Integrated collaboration across distributed sites: The perils of process and the promise of practice’, Journal of Information Technology, 23(1): 44–54.
Dibbern, J., Winkler, J., and Heinzl, A. (2008), ‘Explaining variations in client extra costs between software projects off shored to India’, MIS Quarterly, 32(2): 333–366.
Dwyer, R.R, Schun, P.H., and Oh, S. (1987), ‘Developing buyer-seller relationship’, Journal of Marketing, 51(2): 11–27.
Eisenhardt, K.M. and Bourgeois, L.J. (1988), ‘Politics of strategic decision making in high-velocity environments: Toward a midrange theory’, Academy of Management Journal, 31(4): 737–770.
Gellings, C. (2007), ‘Outsourcing relationships: The contract as IT governance tool’, Proceedings of the 40th Annual Hawaii International Conference on System Sciences, IEEE Computer Society, Hawaii, HI.
Glaser, B. and Strauss, A. (1967), The discovery of grounded theory: Strategies for qualitative research, Chicago: Aldine Publishing Company.
Glaser, B.G. (1978), Theoretical sensitivity, Mill Valley, CA: The Sociology Press.
Glaser, B.G. (1998), Doing grounded theory: Issues and discussions, Sociology Press: Mill Valley, CA.
Goles, T. and Chin, W.W. (2005), ‘Information systems outsourcing relationship factors: Detailed conceptualization and initial evidence’, The DATA BASE for Advances in Information Systems, 36(4): 47–67.
Goo, J., Kishore, R., Nam, K., Rao, H.R., and Song, Y. (2007), ‘An investigation of factors that influence the duration of IT outsourcing relationships’, Decision Support Systems, 42(4): 2107–2125.
Gopal, A., Mukhopadhyay, T, and Krishnan, M.S. (2002), ‘The role of software processes and communication in offshore software development’, Communications of the ACM, 45(4): 193–200.
Hinds, P.J. and Bailey, D.E. (2003), ‘Out of sight, out of sync: Understanding conflict in distributed teams’, Organization Science, 14(6): 615–632.
Holmström Olsson, H., O Conchhuir, E., Agerfalk, P.J., and Fitzgerald, B. (2008), ‘Two-stage-offshoring: An investigation of the Irish bridge’, MIS Quarterly, 32(2): 257–279.
Iacovou, C.L. and Nakatsu, R. (2008), ‘A risk profile of offshore-outsourced development projects’, Communications of the ACM, 51(6): 89–94.
Kankanhalli, A., Tan, B.C.Y., and Wei, K.K. (2007), ‘Conflict and performance in global virtual teams’, Journal of Management Information Systems, 23(3): 237–274.
Karahanna, E., Evaristo, J.R., and Srite, M. (2005), ‘Levels of culture and individual behavior: An integrative perspective’, Journal of Global Information Management, 13(2) Apr-Jun: 1–20.
King, W.R. and Torkzadeh, G. (2008), ‘Information systems offshoring: Research status and issues’, MIS Quarterly, 32(2): 205–225.
Krishna, S., Sahay, S., and Walsham, G. (2004), ‘Managing cross-cultural issues in global software outsourcing’, Communications of the ACM, 47(4): 62–66.
Lee, A.S. (1999), ‘Rigor and relevance in MIS research: Beyond the approach of positivism alone’, MIS Quarterly, 23(1): 29–34.
Levina, N. and Vaast, E. (2008), ‘Innovating or doing as told? Status differences and overlapping boundaries in offshore collaboration’, MIS Quarterly, 32(2): 307–332.
McFarlan, RW. and Nolan, R.L. (1995), ‘How to manage an IT outsourcing alliance’, Sloan Management Review, 36(2): 9–23.
Mithas, S. and Whitaker, J. (2007), ‘Is the world flat or spiky? Information intensity, skills, and global service disaggregation’, Information Systems Research, 18(3): 237–259.
Mohr and Spekman (1994), ‘Characteristics of partnership success: Partnership attributes, communication behavior, and conflict resolution techniques’, Strategic Management Journal, 15(2): 135–152.
Nakatsu, R.T. and Iacovou, C.L. (2009), ‘A comparative study of important risk factors involved in offshore and domestic outsourcing of software development projects: A two-panel delphi study’, Information Su Management, 46(1): 57–68.
Nambisan, S. (2003), ‘Information systems as a reference discipline for new product development’, MIS Quarterly, 27(1): 1–18.
Rottman, J. and Lacity, M.C. (2004), ‘Twenty practices for offshore outsourcing’, MIS Quarterly Executive, 3 (3): 117–130.
Stebbins, RA. (2001), Exploratory research in the social sciences, Thousand Oaks, CA: Sage Publications.
Sun, S.-Y., Lin, T.-C, and Sun, P.-C (2002), ‘The factors influencing information systems outsourcing partnership. A study integrating case study and survey research methods’, Proceedings of the 35th Hawaii International Conference on System Sciences, IEEE Computer Society, Hawaii, HI.
Uzzi, B. (1997), ‘Social structure and competition in interfirm networks: The paradox of embeddedness’, Administrative Science Quarterly, 42(1): 35–67.
Walsham, G. (1993), Interpreting Information Systems in Organizations (1st ed.). John Wiley & Sons, Inc., New York, NY, USA.
Walsham, G. (2002), ‘Cross-cultural software production and use: A structurational analysis’, MIS Quarterly, 26(4): 359–380.
Walsham, G. and Sahay, S. (1999), ‘GIS for district-level administration in India: Problems and opportunities’, MIS Quarterly, 23(1): 39–65.
Willcocks, L.P., Lacity, M.C, and Cullen, S. (2007), ‘Information technology sourcing research: Critique, lessons and prospects’, 13th Americas Conference on Information Systems, Keystone, Colorado, CO.
Winkler, J., Dibbern, J., and Heinzl, A. (2007), ‘Der einfluss kultureller unterschiede beim IT-offshoring’, Wirtschaftsinformatik, 49(2): 95–103.
Winkler, J., Dibbern, J., and Heinzl, A. (2008),” The impact of cultural differences in offshore outsourcing. Case study results from German-Indian application development projects’, Information Systems Frontiers, 10: 243–258.
Yin, R. (2003), Case study research. Design and methods, Thousand Oaks, CA: Sage Publications.
Editor information
Editors and Affiliations
Copyright information
© 2014 Roman Beck
About this chapter
Cite this chapter
Beck, R. (2014). ‘Looking for Trouble’ in Global Information Systems Development and New Product Development Outsourcing Projects. In: Rowe, F., Te’eni, D. (eds) Innovation and IT in an International Context. Palgrave Macmillan, London. https://doi.org/10.1057/9781137336132_11
Download citation
DOI: https://doi.org/10.1057/9781137336132_11
Publisher Name: Palgrave Macmillan, London
Print ISBN: 978-1-349-46336-7
Online ISBN: 978-1-137-33613-2
eBook Packages: Palgrave Business & Management CollectionBusiness and Management (R0)