Skip to main content
  • 250 Accesses

Abstract

The findings from this book suggest that while, at the time of signing the initial agreement, the parties must have found its terms to possess the characteristics of reasonableness, objectiveness, transparency, and non-discrimination, their post-construction behaviour shows that such characteristics are not enduring. Evidence from the case studies shows endogenous mutual dependency conditions to be prevalent in the pipeline projects. It becomes necessary to widen the scope of the definition of mutual dependency, as this enables the identification of exogenous conditions, which will inevitably encompass issues pertaining to politics and international relations. These, in combination with the endogenous conditions, provide a comprehensive mutual dependency bargaining framework that will serve as a deterrent to arbitrary rent-seeking by the transit country.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 54.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Authors

Copyright information

© 2013 Ekpen James Omonbude

About this chapter

Cite this chapter

Omonbude, E.J. (2013). Concluding Remarks. In: Cross-border Oil and Gas Pipelines and the Role of the Transit Country: Economics, Challenges, and Solutions. Palgrave Pivot, London. https://doi.org/10.1057/9781137274526_7

Download citation

Publish with us

Policies and ethics