Abstract
In summer 1990 the Lainbach catchment experienced a thunderstorm-induced flood with a recurrence interval far in excess of 100 years of a magnitude never registered before. The Lainbach has and the effects of the flood could be observed directly in the field. For the 120 m long measuring reach a new topographic map was drawn after the flood on the same level of resolution (0.1 metre contours) as the basemap produced in 1988. A comparison gave detailed information on river bed changes. Using pre-flood and post-flood longitudinal and cross profile surveys, sediment budgets were calculated for the mountain reaches of the Lainbach and Kotlaine. The main sources of eroded channel sediments lay upstream of the broken check dams. River segments with low slopes were generally most affected by high accumulation rates. In the geodetically surveyed reaches considerably more material was accumulated than eroded, resulting in an overall mass balance surplus of about 35000 m3. A large part of this material was mobilized in the tributary channels and slope rills. Slope failures were only of minor importance, characterizing this catastrophic event as a channel flood. The flood caused a fundamental transformation of the channel system.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
BAKER, V.R., KOCHEL, R.C. & PATTON, P.C. (eds.) (1988): Flood Geomorphology —New York (Wiley).
BECHT, M. (1991): Auswirkungen und Ursachen von Katastrophenhochwassern in kleinen, alpinen Einzugsgebieten.—Z. Geomorph. N.F. Suppl. Bd. 89: 49–61, Berlin, Stuttgart.
BECHT, M. & WETZEL, K.F. (1989): Der Einfluß von Muren, Schneeschmelze und Regenniederschlägen auf die Sedimentbilanz eines randalpinen Wildbacheinzugsgebietes.—Die Erde 120: 189–202, Berlin.
BEVEN, K. & CARLING, P. (eds.) (1989): Floods—Hydrological, Sedimentological and Geomorphological Implications—Chichester (Wiley).
BUSSKAMP; R. (1993): The influence of channel steps on coarse bed load transport in mountain torrents: Case study using the radio tracer technique PETsy., (this volume).
CHIN, A. (1989): Step pools in stream channels.—Progress in Physical Geography 13:391–407, London
CHORLEY, R.J. & KENNEDY, B. (1971): Physical Geography—A Systems Approach.—London (Prentice Hall).
ERGENZINGER, P. (1992): River bed adjustment in a step-pool system.—In: BILLI, P., HEY, R.D., THORNE, C.R. & TACCONI, P. (eds): Dynamics of Gravel-Bed Rivers, 415–430, Chichester (Wiley).
FELIX, R., PRIESMEIER, K., WAGNER, O., VOGT, H. & WILHELM, F. (1988): Abschlußbericht des Teilprojektes A2, Sonderforschungsbereich 81 (TUM).—Münchener Geogr. Abhandlungen B 6, München.
GINTZ, D. & SCHMIDT, K.-H. (1991): Grobgeschiebetransport in einem Gebirgsbach als Funktion von Gerinnebettform und Geschiebemorphometrie.—Z. Geomorph. N.F. Suppl. Bd. 89: 63–72, Berlin, Stuttgart
GRANT, G.E., SWANSON, F.J. & WOLMAN, M.G. (1990): Pattern and origin of stepped morphology in high-gradient streams, Western Cascades, Oregon.— Geol. Soc. Am. Bull. 102: 340–352, Boulder.
NEWSON, M. (1980): The geomorphological effectiveness of floods—a contribution stimulated by two recent events in Mid-Wales—Earth Surface Processes and landforms 5: 1–16, Chichester.
SCHMIDT, K.-H., BLEY, D., BUSSKAMP, R., ERGENZINGER, P. & GINTZ, D. (1992): Feststofftransport und Flußbettdynamik in Wildbachsystemen.—Das Beispiel des Lainbachs in Oberbayern.—Die Erde 123: 17–28, Berlin.
SCHMIDT, K.-H. & ERGENZINGER, P. (1990): Magnettracer und Radiotracer-Die Leistungen neuer Meßsysteme für die fluviale Dynamik.—Die Geowissenschaften, 8: 96–102, Weinheim.
SCHMIDT, K.-H. & ERGENZINGER, P. (1992): Bedload entrainment, travel lengths, step lengths, rest periods studied with passive (iron, magnetic) and active (radio) tracer techniques.—Earth Surface processes and Landforms 17: 147–165, Chichester.
WILLIAMS, G.P. & COSTA, J.E. (1988): Geomorphic measurements after floods.—In: BAKER, V.R., KOCHEL, R.C. & PATTON, P.C. (eds.): Flood Geomorphology: 63–77, New York.
Author information
Authors and Affiliations
Editor information
Rights and permissions
Copyright information
© 1994 Springer-Verlag
About this chapter
Cite this chapter
Schmidt, KH. (1994). River channel adjustment and sediment budget in response to a catastrophic flood event (Lainbach catchment, Southern Bavaria). In: Ergenzinger, P., Schmidt, KH. (eds) Dynamics and Geomorphology of Mountain Rivers. Lecture Notes in Earth Sciences, vol 52. Springer, Berlin, Heidelberg. https://doi.org/10.1007/BFb0117835
Download citation
DOI: https://doi.org/10.1007/BFb0117835
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-57569-6
Online ISBN: 978-3-540-48235-2
eBook Packages: Springer Book Archive