This paper presents long-term electricity supply-demand scenarios for Kupang City, Indonesia. The objective of the analysis is to reveal the alternatives sizing of power plants along with the power generation costs that is potentially incurred during the study period. The study is conducted using bottom-up energy model. Electricity energy in terms of supply-demand variation is taking into account both fossil fueled and renewable energy potential in the supply side, and the scheme of high as well as average electricity growth rate in the demand side. Four variations of supply-demand conditions is presented as the study result. The results has shown total energy supplied which is required in order to satisfy the usual demand growth and the total saving potential under the demand scheme. The variation in terms of costs also shown depending upon the renewable energy penetration. The study is expected to contribute towards the utilization of more renewable energy potential, particularly the possible implementation of Photovoltaic plants and the campaign of energy efficiency and conservation within the observed area.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Heaps, C.: UNCSD 2012 (2012). http://www.uncsd2012.org/content/documents/Heaps-LEAP%20Slides.pdf
Huang, Y., Bor, Y.J., Peng, C.Y.: The long-term forecast of Taiwan’s energy supply and demand: LEAP model application. Energy Policy 39(11), 6790–6803 (2011)
Hiremath, R.B., Kumar, B., Balachandra, P., Ravindranath, N.H.: Bottom-up approach for decentralised energy planning: case study of Tumkur district in India. Energy Policy 38(2), 862–874 (2010)
BPS Kupang: Kupang in Figures. BPS, Kupang, Indonesia (2014)
Electricity Center for Kupang. PLN Kupang (2014)
Tanoto, Y., Handoyo, E.A.: Renewable energy potential for sustainable long-term electricity energy planning: A bottom-up model application. Int. J. Renew. Energy Res. 5(3), 919–925 (2015)
Acknowledgements
Authors are grateful for financial support given by the Institute of Research and Community Outreach, Petra Christian University, for conducting this research.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2016 Springer Science+Business Media Singapore
About this paper
Cite this paper
Rohi, D., Tanoto, Y. (2016). Sizing and Costs Implications of Long-Term Electricity Planning: A Case of Kupang City, Indonesia. In: Pasila, F., Tanoto, Y., Lim, R., Santoso, M., Pah, N. (eds) Proceedings of Second International Conference on Electrical Systems, Technology and Information 2015 (ICESTI 2015). Lecture Notes in Electrical Engineering, vol 365. Springer, Singapore. https://doi.org/10.1007/978-981-287-988-2_27
Download citation
DOI: https://doi.org/10.1007/978-981-287-988-2_27
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-287-986-8
Online ISBN: 978-981-287-988-2
eBook Packages: EngineeringEngineering (R0)