Skip to main content

Abstract

This chapter presents case studies of the ERM implementation in three CCFs based in Singapore. They were large-, medium-, and small-sized firms, respectively, and participated in the Survey II. TableĀ 8.1 shows the profile of the six interviewees who provided information for the three case studies. In addition to the interviews, their past documents, including the internal documents about ERM and the reports in the mass media, were also reviewed.

TableĀ 8.1 Profile of interviewees for case studies

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • AON (2010) Global risk management survey 2010. AON plc, Chicago

    Google ScholarĀ 

  • Beasley MS, Clune R, Hermanson DR (2005) Enterprise risk management: an empirical analysis of factors associated with the extent of implementation. J Acc Public Policy 24(6):521ā€“531

    ArticleĀ  Google ScholarĀ 

  • Beasley MS, Branson BC, Hancock BV (2010) Developing key risk indicators to strengthen enterprise risk management. ERM Initiative at North Carolina State University and the Committee of Sponsoring Organizations of the Treadway Commission, Raleigh, NC

    Google ScholarĀ 

  • Cendrowski H, Mair WC (2009) Enterprise risk management and COSO: a guide for directors, executives, and practitioners. Wiley, Hoboken

    Google ScholarĀ 

  • China (2011) Head office takes over CRCCā€™s light rail project, Beijing. http://www.china.org.cn/business/2011-01/22/content_21798050.htm. Retrieved 13 July 2011

  • Cienski J (2011) China group sees collapse of Poland ambitions. Financ Times Warsaw Pol. http://www.ft.com/intl/cms/s/0/d17dda5a-96b7-11e0-baca-00144feab49a.html#axzz1Tgz4hTH5. Retrieved 31 July 2011

  • Espersen D (2007) The language of risk: organizations can improve risk management and audit processes by communicating risks in terms that everyone understands. Intern Auditor 64(3):69ā€“73

    Google ScholarĀ 

  • Hopkin P (2010) Fundamentals of risk management. Kogan Page, London

    Google ScholarĀ 

  • Kartam NA, Kartam SA (2001) Risk and its management in the Kuwaiti construction industry: a contractorsā€™ perspective. Int J Proj Manage 19(6):325ā€“335

    ArticleĀ  Google ScholarĀ 

  • Lam J (2003) Enterprise risk management: from incentives to controls, Wiley, Hoboken

    Google ScholarĀ 

  • Liebenberg AP, Hoyt RE (2003) The determinants of enterprise risk management: evidence from the appointment of chief risk officers. Risk Manag Insur Rev 6(1):37ā€“52

    Google ScholarĀ 

  • Lu W, Li H, Shen L, Huang T (2009) Strengths, weaknesses, opportunities, and threats analysis of Chinese construction companies in the gobal market. J Manage Eng 25(4):166ā€“176

    Google ScholarĀ 

  • MOM (2006a) Workplace safety and health risk management: risk assessment guidelines. Ministry of Manpower, Singapore

    Google ScholarĀ 

  • MOM (2006b) A guide to the workplace safety and health (risk management) regulations. Ministry of Manpower, Singapore

    Google ScholarĀ 

  • Pagach DP, Warr RS (2010) The effects of enterprise risk management on firm performance. North Carolina State University, Raleigh

    Google ScholarĀ 

  • SASAC (2006) Guidance to enterprise risk management for central enterprises. State-owned Assets Supervision and Administration Commission of the State Council of China, Beijing

    Google ScholarĀ 

  • Thevendran V, Mawdesley MJ (2004) Perception of human risk factors in construction projects: an exploratory study. Int J Proj Manage 22(2):131ā€“137

    ArticleĀ  Google ScholarĀ 

  • Wang J, Yuan H (2011) Factors affecting contractorsā€™ risk attitudes in construction projects: case study from China. Int J Proj Manage 29(2):209ā€“219

    ArticleĀ  Google ScholarĀ 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Xianbo Zhao .

Rights and permissions

Reprints and permissions

Copyright information

Ā© 2015 Springer Science+Business Media Singapore

About this chapter

Cite this chapter

Zhao, X., Hwang, BG., Low, S.P. (2015). Case Studies. In: Enterprise Risk Management in International Construction Operations. Springer, Singapore. https://doi.org/10.1007/978-981-287-549-5_8

Download citation

  • DOI: https://doi.org/10.1007/978-981-287-549-5_8

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-287-548-8

  • Online ISBN: 978-981-287-549-5

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics