Abstract
The most challenging task of existing tunnel enlargement projects is the conservation ofnormal transport activities during the construction. Started in February 2016, Hai Van road tunnel enlargement project is the first time in Vietnam where the evacuation tube has been widened to become another main tube by NATM technology while the main tube is always in use. In this paper, the environmental impact of the project was assessed via the monitoring data of the soil, water, and air environment at different locations at the construction site. Favourable measured results showed the appropriateness of the design and construction solutions in minimizing the bad environmental impacts of a tunnel enlargement project in Vietnam.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Similar content being viewed by others
References
FHWA (2009). Report FHWA-NHI-10-034: Technical Manual for Design and Construction of Road Tunnels - Civil Elements. U.S. Department of Transportation - Federal Highway Administration - National Highway Institute.
Lunardi, P., and Calcerano, G. (2001). A new construction method for widening highway and railway tunnels. Proceedings of AITES-ITA 2001 World tunnel congress on Progress in Tunnelling after 2000. Milan, pp 665–671.
Mashimo, H., and Ishimura, T. (2003). Technological development of section enlargement for existing tunnels. Tunnels and Underground, 34 (9), pp 729–736.
Ministry of Natural resources and Environment of Vietnam (2013). QCVN 05:2013/BTNMT National technical regulation on ambient air quality. (In Vietnamese)
Ministry of Natural resources and Environment of Vietnam (2010). QCVN 26:2010/BTNMT National technical regulation on noise. (In Vietnamese)
Ministry of Science and Technology of Vietnam (1995). TCVN 5067:1995 Air quality – Weighing method for determination of dust content. (In Vietnamese)
Ministry of Science and Technology of Vietnam (2010). TCVN7878-2:2010 Acoustic – Description, measurement and assessment of environmental noise - Part 2: Determination of environmental noise levels. (In Vietnamese)
NK-NKV-HL (2016). Package HV2-XL1 and HV2-XL2: Construction of 1/2 east tunnel at the north (KM1+800 - KM4+789). Volume I: Design report. DCIC.
NK-NKV-HL (2017). Package HV2-XL1 and HV2-XL2: Construction of 1/2 east tunnel at the north (KM1+800 - KM4+789). Volume V: Technical specification. DCIC.
OSHA (1910). Safety and Health Regulations for Construction - Occupational Health and Environmental Control - Occupational noise exposure 29 CFR 1910.95. US Occupational Safety and Health Administration.
OSHA (1926). Underground Construction (Tunnelling) regulation 29 CFR 1926.800. US Occupational Safety and Health Administration.
PIRAC (2012). Road tunnels: Vehicle emissions and air demand for ventilation. PIRAC Technical Committee C4 Road tunnel operation.
Standards Australia and Standards New Zealand (2003). Australian/New Zealand Standard - Methods for sampling and analysis of ambient air - Method 9.6: Determination of suspended particulate matter - PM10 high volume sampler with size selective inlet - Gravimetric method AS/NZS 3580.9.6:2003.
Acknowledgements
Deep gratitude is expressed to Deo Ca investment joint stock company (Vietnam), the owner of Hai Van road tunnel enlargement project for giving the permission of access to all the related technical documents for research purposes.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Tran, TH. (2020). Environmental impact assessment of an in-service road tunnel during the enlargement project in Vietnam. In: Duc Long, P., Dung, N. (eds) Geotechnics for Sustainable Infrastructure Development. Lecture Notes in Civil Engineering, vol 62. Springer, Singapore. https://doi.org/10.1007/978-981-15-2184-3_66
Download citation
DOI: https://doi.org/10.1007/978-981-15-2184-3_66
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-15-2183-6
Online ISBN: 978-981-15-2184-3
eBook Packages: EngineeringEngineering (R0)