Abstract
11.1.1 Before the handover of each project, it shall be checked and accepted, and records shall be made; the comprehensive test shall be carried out before the completion of the monitoring system, and the reasons for the unqualified items shall be analyzed and rectified in time to ensure the acceptance of the project quality and handover.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2020 The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd.
About this chapter
Cite this chapter
Yang, Y. (2020). Project Acceptance. In: Technical Code for Monitoring of Building Structures. Springer, Singapore. https://doi.org/10.1007/978-981-15-1049-6_11
Download citation
DOI: https://doi.org/10.1007/978-981-15-1049-6_11
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-15-1048-9
Online ISBN: 978-981-15-1049-6
eBook Packages: EngineeringEngineering (R0)