Abstract
Scheduling problems in manufacturing industries are usually associated with production system, where the typical kind of resource is machine. However, the problems also arise in non-production setting, for example in an aircraft MRO (maintenance, repair, and overhaul) shop. In the shop, the primary resource is technician. There are three stages: stripping, repairing, and testing, with spare part procurement delay between stripping and repairing stages . Once a repair job is allocated to a technician, it will be processed by the same technician in subsequent stages, hence dedicated technician constraint. In the testing stage, jobs require not only technician but also dedicated testing machine. This paper models the scheduling problem as a mixed integer linear programming problem with makespan as the objective function. Numerical experiments are conducted to explore the model behaviors as well as to demonstrate the capability of the model .
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Pinedo, M.L.: Scheduling – Theory, Algorithms, and Systems, 5th edn. Springer, Heidelberg (2016)
McFadden, M., Worrells, D.S.: Global outsourcing of aircraft maintenance. J. Aviat. Technol. Eng. 1(2), 63–73 (2012)
Safaei, N., Banjevic, D., Jardine, A.K.S.: Workforce-constrained maintenance scheduling for military aircraft fleet: a case study. Ann. Oper. Res. 186, 295–316 (2011)
Halim, A.H., Jenny: Penjadwalan pada flowshop dengan kelompok mesin heterogen untuk meminimasi makespan. Jurnal TMI (2003)
Naderi, B., Gohari, S., Yazdani, M.: Hybrid flexible flowshop problems: models and solution. Appl. Math. Model. 38, 5767–5780 (2014)
Tyagi, N., Tripathi, R.P., Chandramouli, A.B.: Flexible flowshop scheduling model with four stages. Indian J. Sci. Technol. 9(42), 1–11 (2016)
Bedhief, A.O., Dridi, N.: Minimizing makespan in a three-stage hybrid flow shop with dedicated machines. Int. J. Ind. Eng. Comput. 10(2), 161–176 (2019)
Besbes, W., Loukil, T., Teghem, J.: A two-stage flow shop with parallel dedicated machines. In: 8th International Conference of Modeling and Simulation, Hammamet (2010)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Aribowo, W., Prastomo, O.W., Halim, A.H. (2020). Scheduling an Aircraft Maintenance Shop with Dedicated Technician and Dedicated Machine Constraints. In: Osman Zahid, M., Abd. Aziz, R., Yusoff, A., Mat Yahya, N., Abdul Aziz, F., Yazid Abu, M. (eds) iMEC-APCOMS 2019. iMEC-APCOMS 2019. Lecture Notes in Mechanical Engineering. Springer, Singapore. https://doi.org/10.1007/978-981-15-0950-6_40
Download citation
DOI: https://doi.org/10.1007/978-981-15-0950-6_40
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-15-0949-0
Online ISBN: 978-981-15-0950-6
eBook Packages: EngineeringEngineering (R0)