Abstract
Today’s industrial growth is inseparable from the free market mechanism which is a consequence of economic globalization and thus cannot be avoided by any country. All this leads to a very keen business competition. This can be seen in the high competition of the Indonesian national cement industry and worsened by the oversupply of domestic cement in Indonesia. Semen Padang Co. as a national cement company sets the optimization of production capacity as one of the focus of initiatives. To achieve this, maintenance of production equipment is very important. In the mining unit, the occurrences of breakdown are very high in the crusher plant and conveyor belts having a large number of equipment and serial production activities that need to be set up for effective maintenance planning. The purpose of this study is to develop preventive maintenance planning with the implementation of the Reliability Centered Maintenance methodology and to submit a schedule of planned preventive maintenance activities with the limitation of meeting the target production hours of conveying limestone and silica to each plant. Based on the calculation results from the implementation of preventive maintenance planning, it can reduce the breakdown time by 42% and it is recommended to be applicable. The next study is to calculate the maintenance costs needed in accordance with the maintenance plan that is made with the Reliability Centered Maintenance methodology. This step is expected help the company in minimizing the cost of maintaining crusher plant and conveyor belts.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsReferences
Hoseinie, S.H., Kumar, U., Behzad, G.: Reliability Centered Maintenance (RCM) for Automated Mining Machinery, Luleå University of Technology, Luleå (2016)
Moubray, J.: Reliability-Centred Maintenance, Biddles Ltd, Guildford and King’s Lynn, Great Britain (1997)
Sifonte, J.R., Reyes-Picknell, J.V.: Reliability Centered Maintenance Reengineered Practical Optimization of the RCM Process with RCM-R®. CRC Press Taylor & Francis Group, Boca Raton (2017)
Langlo, F.: Application of reliability centered maintenance on a drilling system, Department of Mechanical and Structural engineering and Material Science, Faculty of Science and Technology, UIS, Stavanger (2014)
Afefy, I.H.: Reliability-centered maintenance methodology and application: a case study. Sci. Res. Eng. 2010(2), 863–873 (2010)
Regan, N.: The RCM Solution: A Practical Guide to Starting and Maintaining a Successful RCM Program. Industrial Press Inc., New York (2012)
Bloom, N.: Reliability Centered Maintenance Implementation Made Simple. McGraw-Hill Inc, New York (2006)
Engineering, US Army Corps of Engineers Construction: Streamlined reliability centered maintenance (RCM): tutorial and application (RCM.ppt/R6.exe). USACERL Technical report 99/50 (1999)
National Aeronatics and Space Administration: Reliability Centered Maintenance Guide for Facilities and Collateral Equipment (2000)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Alta, E., Putri, N.T., Henmaidi (2020). Reliability Centered Maintenance of Mining Equipment: A Case Study in Mining of a Cement Plant Industry. In: Osman Zahid, M., Abd. Aziz, R., Yusoff, A., Mat Yahya, N., Abdul Aziz, F., Yazid Abu, M. (eds) iMEC-APCOMS 2019. iMEC-APCOMS 2019. Lecture Notes in Mechanical Engineering. Springer, Singapore. https://doi.org/10.1007/978-981-15-0950-6_26
Download citation
DOI: https://doi.org/10.1007/978-981-15-0950-6_26
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-15-0949-0
Online ISBN: 978-981-15-0950-6
eBook Packages: EngineeringEngineering (R0)