Abstract
Six Sigma is a Quality Improvement Technique widely used in Man-ufacturing Industry. Application of Six Sigma is yet to be explored exhaustively in the field of Construction. This study explores the possibility of application of Six Sigma in METRO Rail Construction. This paper defines and analyses Con-struction Performance of Pier Construction in METRO Rail Project of Ahmed-abad using Six Sigma Technique. A stretch of 4 km from North-South Corridor is selected for the study from APMC to Shreyas. The data such as Work Break-down Structure, List of Activities, Time of Activities, Dependency of Activi-ties, Construction sequence etc. is collected and analysed using software Pri-mavera and Minitab. Process Capability Analysis is used to determine how well an actual process meets a set of specification limits in a scheduled plan. Data is represented and analysed by preparing different charts and graphs such as I – Chart, Moving Range Chart, Capability Histogram and Capability Plot. A com-parison was done between the actual works done at the site and the schedule planned for the progress to calculate the Sigma value. It is found from the result that the calculated Sigma value is near to the ultimate Sigma Level. This work provides valuable insights for the implementation of Six Sigma Technique in the Construction Industry. Six Sigma Technique can evaluate the quality of cur-rent construction activity and quantify the improvement goals so as to control succeeding critical activities for the project. Improvement in Quality of Con-struction can be observed at large extent with the application of Six Sigma Technique. Six Sigma Technique can be linked with Lean Principle.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Aboelmaged, M. G. (2010). “Six sigma quality: A structured review and impli-cations for future research.” International Journal of Quality & Reliability Management. 27(3), 268–317.
Kuo-Liang L., Yang S. (2013)“Applying Six Sigma to Quality Improvement in Construction”, Journal of Management in Engineering, 29(4): 464-470
Sarathkumar K., Loganathan R. (2016) “Evaluation of Six Sigma Concepts in Construction Industry”, International Journal of Scientific & Engineering Re-search,7(4): 202-207
Sawant S., Pataskar S. (2014) “Applying Six Sigma Principles in Construction In-dustry for Quality Improvement”, International Journal of Scientific & Engineering Research, 117(4): 129-139
Seung H., Myung C., Keon S., Ho D. (2008) “Six Sigma-Based Approach to Im-prove Performance in Construction Operations”, Journal of Management in Engi-neering, 24(1): 21-31
Acknowledgement
Authors of the paper are grateful to Nirma University for providing encouragement and all kind of support for this research work.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Parekh, V., Solanki, K., Prajapati, N. (2020). Application of Six Sigma on METRO Rail Construction Project. In: Ha-Minh, C., Dao, D., Benboudjema, F., Derrible, S., Huynh, D., Tang, A. (eds) CIGOS 2019, Innovation for Sustainable Infrastructure. Lecture Notes in Civil Engineering, vol 54. Springer, Singapore. https://doi.org/10.1007/978-981-15-0802-8_89
Download citation
DOI: https://doi.org/10.1007/978-981-15-0802-8_89
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-15-0801-1
Online ISBN: 978-981-15-0802-8
eBook Packages: EngineeringEngineering (R0)