Skip to main content

Design and Application of Centralized Instrument Transformer Measuring System in Series Compensation System

  • Conference paper
  • First Online:
Book cover Proceedings of PURPLE MOUNTAIN FORUM 2019-International Forum on Smart Grid Protection and Control (PMF 2019, PMF 2021)

Abstract

This paper analyzes the requirements of the high-voltage platform measuring system of the series compensation system. Through the analysis of the platform of series compensation system, this paper study’s the noise source and route of TA measuring system on the platform and puts forward a centralized TA measuring system. The system uses signal processing and photoelectric conversion module based on low-power CPLD and reliable redundant power supply. The module features in centralized TA measuring system are also introduced. The system was successfully applied in the Canadian series compensation project.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 229.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 299.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 299.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Zhou X (2008) Series compensation of power system. CEPP

    Google Scholar 

  2. Xia M, Huang Y, Wu J Development and current situation of substation automation system. J Beijing Jiaotong Univ

    Google Scholar 

  3. Zeng Y, Wang J (2005) Design and implementation of the control and protection system for 500 kV Hechi series compensation. Relay 33(10):75–78

    Google Scholar 

  4. Zhao S, Yu D, Li G (2002) Testing on secondary systems in Weixian series compensation station of Datong-Fangshan 500 kV double circuits. North China Electr Power (3):5–8

    Google Scholar 

  5. He E, Wu R, Li J, Li Y, Lu J (2008) Measures of anti-EMI in series compensation equipment. Relay 36(4):72–76

    Google Scholar 

  6. Zhu C, Feng Y, Liu G, Luo S, Wu Z, Wang D (2013) Application of electronic current transformer measuring system in series compensation system. Autom Electr Power Syst 37(13):132–135

    Google Scholar 

  7. Peng T, Xu L, Yin C, Li J, Luo S (2010) Development of HV Side power supply for electronic current transformer. Transformer 47(5):5–12

    Google Scholar 

  8. Qiu H, Li L, Duan X, Fan X Lu B (2006) Opt-electric transmission system of low power consumption for optically powered electronic current transformers. Autom Electr Power Syst 30(20):72–75

    Google Scholar 

  9. Li Z, Li G, Chen M, Liu Z, Li Y, Yu H, Li S (2012) Development of power supply for electronics on series capacitor platform as driven by current transformer. Power Syst Technol 36(12):195–199

    Google Scholar 

  10. Yin Z, Liu W, Qin S et al (2004) A new method for realizing interface of electronic transformer based on FPGA technology. Autom Electr Power Syst (14):93–96

    Google Scholar 

  11. Yuan Y, Bu Q, Bao Y et al (2009) Design and application of electronic transformer data analysis system. Autom Electr Power Syst 33(20):78–82

    Google Scholar 

  12. Wang P, Luo C, Zhang G (2006) Electronic current transformer based on low power current transformer. Autom Electr Power Syst 30(4):98–101

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Chang-yin Zhu .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Singapore Pte Ltd.

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Zhu, Cy. et al. (2020). Design and Application of Centralized Instrument Transformer Measuring System in Series Compensation System. In: Xue, Y., Zheng, Y., Rahman, S. (eds) Proceedings of PURPLE MOUNTAIN FORUM 2019-International Forum on Smart Grid Protection and Control. PMF PMF 2019 2021. Lecture Notes in Electrical Engineering, vol 584. Springer, Singapore. https://doi.org/10.1007/978-981-13-9779-0_41

Download citation

  • DOI: https://doi.org/10.1007/978-981-13-9779-0_41

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-13-9778-3

  • Online ISBN: 978-981-13-9779-0

  • eBook Packages: EnergyEnergy (R0)

Publish with us

Policies and ethics