Skip to main content

Tata Power

  • Chapter
  • First Online:
  • 1746 Accesses

Part of the book series: Flexible Systems Management ((FLEXSYS))

Abstract

On February 16, 2018, Director’s lounge, IIT Delhi—Mr. Praveer Sinha, CEO of Tata Power Delhi Distribution Limited (TPDDL), was waiting to proceed to the seminar hall for inaugurating Parivartan’18—the annual management, sports, and cultural festival of the Department of Management Studies (DMS), IIT Delhi. He was in conversation with the management students of DMS, coordinating the event, where he discussed the transformation journey of TPDDL in the past 18 years. He gave insights about the particular challenges faced by the company owing to its PPP ownership structure. He also recollected about the power situation in Delhi years ago and talked about major steps taken by TPDDL in order to successfully solve the pertaining issues and bring the figures on the balance sheets to remotely optimistic values from the deep losses accumulated in past decades. Since its origin in 2002, TPDDL has continuously endeavored to reduce the accumulated technical and commercial (AT&C) losses that it had inherited from the Delhi Vidyut Board (DVB) upon creation of the public–private joint venture. It has set many successful benchmarks since then in its operations, distributions, customer service, and technical innovations to brighten the power scenario of Delhi.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   69.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD   89.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

References

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Sanjay Dhir .

15.1 Electronic supplementary material

Below is the link to the electronic supplementary material.

Supplementary material 1 (DOCX 588 kb)

Exhibits

Exhibits

Exhibit 15.1
figure 1figure 1

Source http://tatapower-ddl.com

P&L statement of TPDDL for FY 2016–17.

Exhibit 15.2
figure 2

Source http://tatapower-ddl.com

Tata Power—DDL loss reduction trajectory from 2002–03 to 2016–17.

Exhibit 15.3
figure 3

Source http://tatapower-ddl.com. Delhi’s bulk power rate is 60% higher than national average (₹ 5.49 v/s. ₹ 3.49). Delhi’s state generation cost is 70% higher than average cost of other state generators (₹ 5.00 v/s. ₹ 2.93). Delhi does not have access to center’s unallocated pool

Overall purchase cost versus state’s generation cost in the different states of India.

Exhibit 15.4
figure 4

Source http://tatapower-ddl.com

Changes in Business Regulatory Framework during Multi Year Tariff Regime.

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Singapore Pte Ltd.

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

Dhir, S., Sushil (2019). Tata Power. In: Cases in Strategic Management. Flexible Systems Management. Springer, Singapore. https://doi.org/10.1007/978-981-13-7064-9_15

Download citation

Publish with us

Policies and ethics