Skip to main content

Application of Mosaic Instruments on Back-up Panel in Nuclear Power Plant

  • Conference paper
  • First Online:
Nuclear Power Plants: Innovative Technologies for Instrumentation and Control Systems (SICPNPP 2018)

Abstract

The mosaic instruments installed on the back-up panel (BUP) have uniform dimensions and are demonstrated to be not only a modern style of main control room (MCR) but also conveniently installed, maintained and powerfully extended. As the human-machine interface equipments, mosaic instrument needs to consider the requirement of human factors (operability, readability, prevention of malfunction) and independence (physical separation and electrical isolation) in the nuclear power plant (NPP) designing process in order to insure the NPP in safe status This paper mainly introduces the type and dimension character of the mosaic instruments and describe the human factors engineering, independence application characters that how to meet the standard requirements when the mosaic instruments are used on BUP in main control room of NPP. As the development of nuclear industry, for the NPP, the application of mosaic instruments will be a new choice.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. IEC 61554: Panel mounted equipment-Electrical measuring instruments-Dimensions for panel mounting. International Electrotechnical Commission (1999)

    Google Scholar 

  2. GB/T 1242: Dimensions for panel mounted indicating and recording electrical measuring instruments (2000)

    Google Scholar 

  3. Yang, H.L., et al.: Discussion on verification criterion and method of human factors engineering for nuclear power plant controller. Atomic Energy Sci. Technol. 48(Suppl.), 1043–1047 (2014)

    Google Scholar 

  4. HAF J0055: Principles of Human Factors Engineering for control room design of nuclear power plants (1995)

    Google Scholar 

  5. NUREG 0700 Rev.2: Human-system interface design review guideline. U.S. Nucl. Regul. Comm. (AAA, 2211) (2002)

    Google Scholar 

  6. IEEE 384(2008) Criteria for Independence of Class 1E Equipment and Circuits. The Institute of Electrical and Electronics Engineers

    Google Scholar 

  7. Lu, C., et al.: Independence Design of Safety Class DCS System in Nuclear Power Plant. Nucl. Sci. Eng. 32(Suppl. 2), 222–230 (2012)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Zhi-Guo Ma .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Singapore Pte Ltd.

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Ma, ZG., Gao, C., Meng, QJ., Sun, HT., Xie, FJ. (2019). Application of Mosaic Instruments on Back-up Panel in Nuclear Power Plant. In: Xu, Y., Xia, H., Gao, F., Chen, W., Liu, Z., Gu, P. (eds) Nuclear Power Plants: Innovative Technologies for Instrumentation and Control Systems. SICPNPP 2018. Lecture Notes in Electrical Engineering, vol 507. Springer, Singapore. https://doi.org/10.1007/978-981-13-3113-8_24

Download citation

  • DOI: https://doi.org/10.1007/978-981-13-3113-8_24

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-13-3112-1

  • Online ISBN: 978-981-13-3113-8

  • eBook Packages: EnergyEnergy (R0)

Publish with us

Policies and ethics