Abstract
The highway alteration project of the section from Meilin to Shanheling in Ninghai urban areas involves a line with a total length of 11.235 km. The section is designed according to the standard for the first-class highway with 4–6 lanes; the design speed is 80 km/h; and the subgrade width is 26.5–45 m. The transportation of earthwork is restricted during highway excavation in urban areas. In addition, the outsourced fillers are also prohibited due to the difficulty in transportation. Therefore, it is more appropriate to use the undisturbed soil to carry out the construction after the undisturbed soil is treated by lime. Specific judgment can be made from an economical and environmental protection perspective, as shown in Tables 12.1 and 12.2.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2019 Springer Nature Singapore Pte Ltd. and Zhejiang University Press
About this chapter
Cite this chapter
Zhu, H., Wu, Z., Chen, M., Zhao, Y. (2019). Practice in Treatment of the Bumps at Bridgeheads of the Highways in Ningbo City. In: Controlling Differential Settlement of Highway Soft Soil Subgrade. SpringerBriefs in Applied Sciences and Technology. Springer, Singapore. https://doi.org/10.1007/978-981-13-0722-5_12
Download citation
DOI: https://doi.org/10.1007/978-981-13-0722-5_12
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-13-0721-8
Online ISBN: 978-981-13-0722-5
eBook Packages: EngineeringEngineering (R0)