Abstract
The construction industry in Malaysia drives the economic growth and development of the country. However, the industry is plagued with delays and cost overrun which transforms what should have been successful projects to projects incurring additional costs, disagreements, litigation and in some cases abandonment of projects. This research studied the causes of delays and cost overrun in the industry and ranked them according to their perceived importance to the contractors, with a view to establishing those to be addressed by the contractors. Online questionnaires were used for data collection for this research. A total of 69 responses were analysed using principal component analysis (PCA) (factor analysis) to identify the main causes. The result of the analysis showed that delay in preparation of design document, poor schedule and control of time, delay in delivery of material to site, lack of knowledge about the different defined execution methods, shortage of labour and material in market, and changes in scope of work were the main causes of delay and cost overrun. The identified causes if properly addressed would reduce the rate of delays and cost overrun in construction projects, thus enhancing the economic growth and development of the country.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsReferences
Department of Statistics (DOSM): National Accounts: Quarterly Gross Domestic Product (Fourth Quarter 2016). Department of Statistics, Editor. 2017, Department of Statistics, Malaysia: Kuala Lumpur (2017)
Alaghbari, W.E., et al.: The significant factors causing delay of building construction projects in Malaysia. Eng. Constr. Architectural Manag. 14(2), 192–206 (2007)
Shehu, Z., Endut, I.R., Akintoye, A.: Factors contributing to project time and hence cost overrun in the Malaysian construction industry. J. Financ. Manage. Property Constr. 19(1), 55–75 (2014)
Minchin Jr., R.E., et al.: Comparison of cost and time performance of design-build and design-bid-build delivery systems in Florida. J. Constr. Eng. Manage. 139(10), 04013007 (2013)
Forbes, L.H., Ahmed, S.M.: Modern Construction: Lean Project Delivery and Integrated Practices (2010) (CRC Press)
Rasdorf, W.J., Abudayyeh, O.Y.: Cost-and schedule-control integration: issues and needs. J. Constr. Eng. Manage. 117(3), 486–502 (1991)
Flyvbjerg, B., Holm, M.S., Buhl, S.: Underestimating costs in public works projects: error or lie? J. Am. Plann. Assoc. 68(3), 279–295 (2009)
Enshassi, A., Al-Najjar, J., Kumaraswamy, M.: Delays and cost overruns in the construction projects in the Gaza Strip. J. Financ. Manage. Property Constr. 14(2), 126–151 (2009)
JBIM: Official publication of the national BIM standard (NBIMS) and the national institute of building science. J. Build. Inf. Model (2007) (Washington D.C.)
Ismail, I., et al.: Comparative Study on Time Management Practices in Construction Industry Between Kedah and Kelantan (2013)
Rahman, I.A., et al.: Time and cost performance of costruction projects in southern and cenrtal regions of Penisular Malaysia. In: 2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER) (2012)
Mohd-Nor, M., Grant, M.P.: Building information modelling (BIM) in the malaysian architecture industry. WSEAS Trans. Env. Dev. 10, 264–273 (2014)
Yamin, R.A., Harmelink, D.J.: Comparison of linear scheduling model (LSM) and critical path method (CPM). J. Constr. Eng. Manage. 127(5), 374–381 (2001)
John, N.: Project Management for Business and Technology. Prentice Hall (2003)
Lester, A.: Project Planning and Control. Butterworth-Heinemann (2003)
Bazjanac, V.: Virtual Building Environments (VBE)-Applying Information Modeling to Buildings (2006)
Ramanathan, C., Potty, N.S., Idrus, A.B.: Analysis of time and cost overrun in Malaysian construction. In: Advanced Materials Research. Trans Tech Publications (2012)
Sambasivan, M., Soon, Y.W.: Causes and effects of delays in Malaysian construction industry. Int. J. Project Manage. 25(5), 517–526 (2007)
Ting, S., Khoo, H., Wong, S.: Project Management Development in Malaysia: A Case Study. Department of Civil Engineering, Faculty of Engineering, University Malaysia (2009)
Doloi, H., et al.: Analysing factors affecting delays in Indian construction projects. Int. J. Project Manage. 30(4), 479–489 (2012)
Memon, A.H., et al.: BIM in Malaysian construction industry: status, advantages, barriers and strategies to enhance the implementation level. Res. J. Appl. Sci. Eng. Technol. 8(5), 606–614 (2014)
Kaming, P.F., et al.: Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Constr. Manage. Econ. 15(1), 83–94 (1997)
Ofori, G.: Programmes for improving the performance of contracting firms in developing countries: A review of approaches and appropriate options. Constr. Manage. Econ. 9(1), 19–38 (1991)
Ofori, G.: Research on construction industry development at the crossroads. Constr. Manage. Econ. 11(3), 175–185 (1993)
Chan, D.W., Kumaraswamy, M.M.: A comparative study of causes of time overruns in Hong Kong construction projects. Int. J. Project Manage. 15(1), 55–63 (1997)
Al-Momani, A.H.: Construction delay: a quantitative analysis. Int. J. Project Manage. 18(1), 51–59 (2000)
Chan, D.W., Kumaraswamy, M.M.: Compressing construction durations: lessons learned from Hong Kong building projects. Int. J. Project Manage. 20(1), 23–35 (2002)
Kaliba, C., Muya, M., Mumba, K.: Cost escalation and schedule delays in road construction projects in Zambia. Int. J. Project Manage. 27(5), 522–531 (2009)
Toor, S.U.R., Ogunlana, S.O.: Problems causing delays in major construction projects in Thailand. Constr. Manage. Econ. 26(4), 395–408 (2008)
Olawale, Y.A., Sun, M.: Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Constr. Manage. Econ 28(5), 509–526 (2010)
Al-Tmeemy, S.M.H., Abdul-Rahman, H., Harun, Z.: Contractors’ perception of the use of costs of quality system in Malaysian building construction projects. Int. J. Project Manage. 30(7), 827–838 (2012)
Cochran, W.G.: Sampling Techniques. Wiley (2007)
Neill, J.: Writing up a Factor Analysis, 7 p. Retrieved 7 Sept 2008
Abd El-Razek, M., Bassioni, H., Mobarak, A.: Causes of delay in building construction projects in Egypt. J. Constr. Eng. Manage. 134(11), 831–841 (2008)
Author information
Authors and Affiliations
Corresponding authors
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2019 Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Tahir, M.M., Haron, N.A., Alias, A.H., Diugwu, I.A. (2019). Causes of Delay and Cost Overrun in Malaysian Construction Industry. In: Pradhan, B. (eds) GCEC 2017. GCEC 2017. Lecture Notes in Civil Engineering , vol 9. Springer, Singapore. https://doi.org/10.1007/978-981-10-8016-6_5
Download citation
DOI: https://doi.org/10.1007/978-981-10-8016-6_5
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-10-8015-9
Online ISBN: 978-981-10-8016-6
eBook Packages: EngineeringEngineering (R0)