Causes of Delay and Cost Overrun in Malaysian Construction Industry

  • Conference paper
  • First Online:

Part of the book series: Lecture Notes in Civil Engineering ((LNCE,volume 9))

Abstract

The construction industry in Malaysia drives the economic growth and development of the country. However, the industry is plagued with delays and cost overrun which transforms what should have been successful projects to projects incurring additional costs, disagreements, litigation and in some cases abandonment of projects. This research studied the causes of delays and cost overrun in the industry and ranked them according to their perceived importance to the contractors, with a view to establishing those to be addressed by the contractors. Online questionnaires were used for data collection for this research. A total of 69 responses were analysed using principal component analysis (PCA) (factor analysis) to identify the main causes. The result of the analysis showed that delay in preparation of design document, poor schedule and control of time, delay in delivery of material to site, lack of knowledge about the different defined execution methods, shortage of labour and material in market, and changes in scope of work were the main causes of delay and cost overrun. The identified causes if properly addressed would reduce the rate of delays and cost overrun in construction projects, thus enhancing the economic growth and development of the country.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   189.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   249.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD   329.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

References

  1. Department of Statistics (DOSM): National Accounts: Quarterly Gross Domestic Product (Fourth Quarter 2016). Department of Statistics, Editor. 2017, Department of Statistics, Malaysia: Kuala Lumpur (2017)

    Google Scholar 

  2. Alaghbari, W.E., et al.: The significant factors causing delay of building construction projects in Malaysia. Eng. Constr. Architectural Manag. 14(2), 192–206 (2007)

    Article  Google Scholar 

  3. Shehu, Z., Endut, I.R., Akintoye, A.: Factors contributing to project time and hence cost overrun in the Malaysian construction industry. J. Financ. Manage. Property Constr. 19(1), 55–75 (2014)

    Article  Google Scholar 

  4. Minchin Jr., R.E., et al.: Comparison of cost and time performance of design-build and design-bid-build delivery systems in Florida. J. Constr. Eng. Manage. 139(10), 04013007 (2013)

    Article  Google Scholar 

  5. Forbes, L.H., Ahmed, S.M.: Modern Construction: Lean Project Delivery and Integrated Practices (2010) (CRC Press)

    Book  Google Scholar 

  6. Rasdorf, W.J., Abudayyeh, O.Y.: Cost-and schedule-control integration: issues and needs. J. Constr. Eng. Manage. 117(3), 486–502 (1991)

    Article  Google Scholar 

  7. Flyvbjerg, B., Holm, M.S., Buhl, S.: Underestimating costs in public works projects: error or lie? J. Am. Plann. Assoc. 68(3), 279–295 (2009)

    Article  Google Scholar 

  8. Enshassi, A., Al-Najjar, J., Kumaraswamy, M.: Delays and cost overruns in the construction projects in the Gaza Strip. J. Financ. Manage. Property Constr. 14(2), 126–151 (2009)

    Article  Google Scholar 

  9. JBIM: Official publication of the national BIM standard (NBIMS) and the national institute of building science. J. Build. Inf. Model (2007) (Washington D.C.)

    Google Scholar 

  10. Ismail, I., et al.: Comparative Study on Time Management Practices in Construction Industry Between Kedah and Kelantan (2013)

    Google Scholar 

  11. Rahman, I.A., et al.: Time and cost performance of costruction projects in southern and cenrtal regions of Penisular Malaysia. In: 2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER) (2012)

    Google Scholar 

  12. Mohd-Nor, M., Grant, M.P.: Building information modelling (BIM) in the malaysian architecture industry. WSEAS Trans. Env. Dev. 10, 264–273 (2014)

    Google Scholar 

  13. Yamin, R.A., Harmelink, D.J.: Comparison of linear scheduling model (LSM) and critical path method (CPM). J. Constr. Eng. Manage. 127(5), 374–381 (2001)

    Article  Google Scholar 

  14. John, N.: Project Management for Business and Technology. Prentice Hall (2003)

    Google Scholar 

  15. Lester, A.: Project Planning and Control. Butterworth-Heinemann (2003)

    Google Scholar 

  16. Bazjanac, V.: Virtual Building Environments (VBE)-Applying Information Modeling to Buildings (2006)

    Google Scholar 

  17. Ramanathan, C., Potty, N.S., Idrus, A.B.: Analysis of time and cost overrun in Malaysian construction. In: Advanced Materials Research. Trans Tech Publications (2012)

    Article  Google Scholar 

  18. Sambasivan, M., Soon, Y.W.: Causes and effects of delays in Malaysian construction industry. Int. J. Project Manage. 25(5), 517–526 (2007)

    Article  Google Scholar 

  19. Ting, S., Khoo, H., Wong, S.: Project Management Development in Malaysia: A Case Study. Department of Civil Engineering, Faculty of Engineering, University Malaysia (2009)

    Google Scholar 

  20. Doloi, H., et al.: Analysing factors affecting delays in Indian construction projects. Int. J. Project Manage. 30(4), 479–489 (2012)

    Article  Google Scholar 

  21. Memon, A.H., et al.: BIM in Malaysian construction industry: status, advantages, barriers and strategies to enhance the implementation level. Res. J. Appl. Sci. Eng. Technol. 8(5), 606–614 (2014)

    Google Scholar 

  22. Kaming, P.F., et al.: Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Constr. Manage. Econ. 15(1), 83–94 (1997)

    Article  Google Scholar 

  23. Ofori, G.: Programmes for improving the performance of contracting firms in developing countries: A review of approaches and appropriate options. Constr. Manage. Econ. 9(1), 19–38 (1991)

    Article  MathSciNet  Google Scholar 

  24. Ofori, G.: Research on construction industry development at the crossroads. Constr. Manage. Econ. 11(3), 175–185 (1993)

    Article  Google Scholar 

  25. Chan, D.W., Kumaraswamy, M.M.: A comparative study of causes of time overruns in Hong Kong construction projects. Int. J. Project Manage. 15(1), 55–63 (1997)

    Article  Google Scholar 

  26. Al-Momani, A.H.: Construction delay: a quantitative analysis. Int. J. Project Manage. 18(1), 51–59 (2000)

    Article  Google Scholar 

  27. Chan, D.W., Kumaraswamy, M.M.: Compressing construction durations: lessons learned from Hong Kong building projects. Int. J. Project Manage. 20(1), 23–35 (2002)

    Article  Google Scholar 

  28. Kaliba, C., Muya, M., Mumba, K.: Cost escalation and schedule delays in road construction projects in Zambia. Int. J. Project Manage. 27(5), 522–531 (2009)

    Article  Google Scholar 

  29. Toor, S.U.R., Ogunlana, S.O.: Problems causing delays in major construction projects in Thailand. Constr. Manage. Econ. 26(4), 395–408 (2008)

    Article  Google Scholar 

  30. Olawale, Y.A., Sun, M.: Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Constr. Manage. Econ 28(5), 509–526 (2010)

    Article  Google Scholar 

  31. Al-Tmeemy, S.M.H., Abdul-Rahman, H., Harun, Z.: Contractors’ perception of the use of costs of quality system in Malaysian building construction projects. Int. J. Project Manage. 30(7), 827–838 (2012)

    Article  Google Scholar 

  32. Cochran, W.G.: Sampling Techniques. Wiley (2007)

    Google Scholar 

  33. Neill, J.: Writing up a Factor Analysis, 7 p. Retrieved 7 Sept 2008

    Google Scholar 

  34. Abd El-Razek, M., Bassioni, H., Mobarak, A.: Causes of delay in building construction projects in Egypt. J. Constr. Eng. Manage. 134(11), 831–841 (2008)

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding authors

Correspondence to Muhammad Muhammad Tahir or Nuzul Azam Haron .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Singapore Pte Ltd.

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Tahir, M.M., Haron, N.A., Alias, A.H., Diugwu, I.A. (2019). Causes of Delay and Cost Overrun in Malaysian Construction Industry. In: Pradhan, B. (eds) GCEC 2017. GCEC 2017. Lecture Notes in Civil Engineering , vol 9. Springer, Singapore. https://doi.org/10.1007/978-981-10-8016-6_5

Download citation

  • DOI: https://doi.org/10.1007/978-981-10-8016-6_5

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-10-8015-9

  • Online ISBN: 978-981-10-8016-6

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics