The precast concrete (PC) method has been preferred for reasons of shortening of construction time, quality assurance, and cost reduction. In addition, in situ production of PC members under equivalent production conditions can save costs while ensuring quality equal to or better than in-plant production. Despite these advantages, in situ production is being avoided due to possible risks from project management. Therefore, in order to generalize the in situ production of PC members, it is necessary to clarify the causes of the possible risks and establish responses. Therefore, the purpose of this study is to analyse the in situ production risks of PC members. The results of this study can be used to establish a systematic response plan for possible risks in the in situ production of PC members.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Chan, W.T., Hu, H.: Constraint programming approach to precast production scheduling. J. Constr. Eng. Manage. 128, 513–521 (2002). https://doi.org/10.1061/(ASCE)0733-9364(2002)128:6(513)
Eastman, C.M., Sacks, R.: Relative productivity in the AEC industries in the United States for on-site and off-site activities. J. Constr. Eng. Manage. 134(7), 517–526 (2008). https://doi.org/10.1061/(ASCE)0733-9364(2008)134:7(517)
Badir, Y.F., Abdul Kadir, M.R., Hasim, A.H.: Industrialized building systems construction in Malaysia. J. Archit. Eng. 8(1), 19–23 (2002). https://doi.org/10.1061/(ASCE)1076-0431(2002)8:1(19)
Kale, S., Arditi, D.: Diffusion of ISO 9000 certification in the precast concrete industry. Constr. Manage. Econ. 24(5), 485–495 (2006). https://doi.org/10.1080/01446190600601594
Polat, G.: Factors affecting the use of precast concrete systems in the united states. J. Constr. Eng. Manage. 134(3), 169–178 (2008). https://doi.org/10.1061/(ASCE)0733-9364(2008)134:3(169)
Kang, H.J.: A study of ship design process optimization in a concurrent engineering environment. Master’s thesis, Seoul National University (2008)
Oh, O.J.: A model for production and erection integration management (PEIM) of large scale pc structures using system dynamics. Doctor’s thesis, Kyung Hee University (2017)
Hong, W.K., Lee, G., Lee, S., Kim, S.: Algorithms for in-situ production layout of composite precast concrete members. Autom. Constr. 41, 50–59 (2014). https://doi.org/10.1016/j.autcon.2014.02.005
Lim, C., Joo, J.K., Lee, G.J., Kim, S.: Basic analysis for form system of in-situ production of precast concrete members. In: 2011 Autumn Annual Conference of Construction Engineering and Management, vol. 12, no. 1, pp. 137–138 (2011)
Lee, G.J.: A study of in-situ production management model of composite precast concrete members. Doctor’s thesis, Kyung Hee University (2012)
Park, S.H., Lim, C.Y., Lee, W.J., Kim, D.S., Jung, Y.S.: The experimental study on concrete manufacturing technologies for ultra high strength concrete pile. In: 2013 Spring Annual Conference Korea Concrete Institute, vol. 25, no. 1, pp. 67–68 (2013)
Won, I., Na, Y., Kim, J.T., Kim, S.: Energy-efficient algorithms of the steam curing for the in situ production of precast concrete members. Energy Build. 64, 275–284 (2013). https://doi.org/10.1016/j.enbuild.2013.05.019
Lim, J., Cho, W., Lee, T.O., Kim, S.: A basic study of process and layout for in-situ production of precast concrete members. In: 2016 Autumn Annual Conference of The Architectural Institute of Korea, vol. 36, no. 2, pp. 945–946 (2016)
Lim, C.: Construction planning model for in-situ production and installation of composite precast concrete frame. Doctor’s thesis, Kyung Hee University (2016)
Kim, I.H.: Risk management in the construction projects. Kimoondang, pp. 51–52 (2001)
Acknowledgements
This work was supported by the National Research Foundation of Korea (NRF) grant funded by the Korea government (MOE) (No. 2017R1D1A1B04033761).
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2019 Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Lim, J., Son, S., Na, Y., Kim, S. (2019). Risk Analysis of the In Situ Production of Precast Concrete Members. In: Pradhan, B. (eds) GCEC 2017. GCEC 2017. Lecture Notes in Civil Engineering , vol 9. Springer, Singapore. https://doi.org/10.1007/978-981-10-8016-6_22
Download citation
DOI: https://doi.org/10.1007/978-981-10-8016-6_22
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-10-8015-9
Online ISBN: 978-981-10-8016-6
eBook Packages: EngineeringEngineering (R0)