An Integrated Imperfect Production-Inventory Model with Lot-Size-Dependent Lead-Time and Quality Control

  • Oshmita Dey
  • Anindita Mukherjee
Conference paper
Part of the Springer Proceedings in Mathematics & Statistics book series (PROMS, volume 225)

Abstract

In this article, an integrated single-vendor single-buyer production-inventory model with stochastic demand and imperfect production process is investigated. The lead-time is assumed to be dependent on the lot-size and a fixed delay due to non-productive times. A methodology is developed to derive the optimal vendor investment required to reduce the defect rate and thereby minimize the total cost of the integrated system. Under the n-shipment policy, an algorithm is proposed so as to minimize the expected integrated total cost and determine the optimal values of the number of shipments, lot-size, safety stock factor, and percentage of defectives. Numerical results are used to illustrate the effect of various parameters on the system.

Keywords

Economic order quantity Integrated model Imperfect production Process quality Variable lead-time 

References

  1. 1.
    Banerjee, A.: A joint economic-lot-size model for purchaser and vendor. Decis. Sci. 17, 292–311 (1986)CrossRefGoogle Scholar
  2. 2.
    Ben-Daya, M., Hariga, M.: Economic lot scheduling problem with imperfect production process. J. Oper. Res. Soc. 51, 875–881 (2000)CrossRefzbMATHGoogle Scholar
  3. 3.
    Ben-Daya, M., Hariga, M.: Integrated single vendor single buyer model with stochastic demand and variable lead-time. Int. J. Prod. Econ. 92, 75–80 (2004)CrossRefGoogle Scholar
  4. 4.
    Ben-Daya, M., Darwish, M., Ertogral, K.: The joint economic lot sizing problem: review and extensions. Eur. J. Oper. Res. 185, 726–742 (2008)MathSciNetCrossRefzbMATHGoogle Scholar
  5. 5.
    Dey, O., Giri, B.C.: Optimal vendor investment for reducing defect rate in a vendor-buyer integrated system with imperfect production process. Int. J. Prod. Econ. 155, 222–228 (2014)CrossRefGoogle Scholar
  6. 6.
    Glock, C.H.: A comment: “integrated single vendor-single buyer model with stochastic demand and variable lead time”. Int. J. Prod. Econ. 122, 790–792 (2009)CrossRefGoogle Scholar
  7. 7.
    Glock, C.H.: Lead timer eduction strategies in a single-vendor single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand. Int. J. Prod. Econ. 136, 37–44 (2012)CrossRefGoogle Scholar
  8. 8.
    Goyal, S.K.: An integrated inventory model for a single supplier-single customer problem. Int. J. Prod. Res. 15, 107–111 (1976)CrossRefGoogle Scholar
  9. 9.
    Goyal, S.K.: A joint economic-lot-size model for purchaser and vendor: a comment. Decis. Sci. 19, 236–241 (1988)CrossRefGoogle Scholar
  10. 10.
    Goyal, S.K., Cárdenas-Barrón, L.E.: Note on: economic production quantity model for items with imperfect quality—a practical approach. Int. J. Prod. Econ. 77, 85–87 (2002)CrossRefGoogle Scholar
  11. 11.
    Ha, D., Kim, S.L.: Implementation of JIT purchasing: an integrated approach. Prod. Plan. Control 8, 152–157 (1997)CrossRefGoogle Scholar
  12. 12.
    Hill, R.M.: The single-vendor single-buyer integrated production-inventory model with a generalized policy. Eur. J. Oper. Res. 97, 493–499 (1997)CrossRefzbMATHGoogle Scholar
  13. 13.
    Hill, R.M.: The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem. Int. J. Prod. Res. 37, 2463–2475 (1999)CrossRefzbMATHGoogle Scholar
  14. 14.
    Hsiao, Y.-C.: Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information. Int. J. Prod. Econ. 115, 229–235 (2008)CrossRefGoogle Scholar
  15. 15.
    Huang, C.K.: An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration. Int. J. Prod. Econ. 91, 91–98 (2004)CrossRefGoogle Scholar
  16. 16.
    Lin, H.J.: An integrated supply chain inventory model. Yugoslav J. Oper. Res. 22 (2012).  https://doi.org/10.2298/YJOR110506019L
  17. 17.
    Ouyang, L.Y., Wu, K.S., Ho, C.H.: Analysis of optimal vendor-buyer integrated inventory policy involving defective items. Int. J. Adv. Manuf. Technol. 29, 1232–1245 (2006)CrossRefGoogle Scholar
  18. 18.
    Ouyang, L.Y., Wu, K.S., Ho, C.H.: Integrated vendor-buyer inventory model with quality improvement and lead-time reduction. Int. J. Prod. Econ. 108, 349–358 (2007)CrossRefGoogle Scholar
  19. 19.
    Pan, J.C.-H., Yang, J.S.: A study of an integrated inventory with controllable lead time. Int. J. Prod. Res. 40, 1263–1273 (2002)CrossRefzbMATHGoogle Scholar
  20. 20.
    Porteus, E.L.: Optimal lot sizing, process quality improvement and setup cost reduction. Oper. Res. 36, 137–144 (1986)CrossRefzbMATHGoogle Scholar
  21. 21.
    Salameh, M.K., Jaber, M.Y.: Economic production quantity model with for items with imperfect quality. Int. J. Prod. Econ. 64, 59–64 (2000)CrossRefGoogle Scholar
  22. 22.
    Shu, H., Zhou, X.: An optimal policy for a single-vendor and a single-buyer integrated system with setup cost reduction and process-quality improvement. Int. J. Syst. Sci. (2013).  https://doi.org/10.1080/00207721.2013.786155
  23. 23.
    Zhang, X., Gerchak, Y.: Joint lot sizing and inspection policy in an EOQ model with random yield. IIE Trans. 22, 41–47 (1990)CrossRefGoogle Scholar

Copyright information

© Springer Nature Singapore Pte Ltd. 2018

Authors and Affiliations

  1. 1.Department of MathematicsTechno India UniversityKolkataIndia

Personalised recommendations