Abstract

Periodic test can check the time of valve opening and closing, and prevent valve jamming, which impacts the safety and economy of nuclear-power plant directly. For solving the problem of the greater load fluctuation, the control principle of the steam control-valve and the scheme of the valve periodic test are researched. The reason of greater load fluctuation is analysed. An optimization of valve control strategy is provided and introduced. Finally the optimization scheme is verified during field valve test. The field test result indicates that load fluctuation has been greatly reduced during valve periodic test and the total valve test time is greatly shortened, so the nuclear power plant can return to rated power ahead of time. The optimization greatly enhances the safety and economy of nuclear power plant. The optimization scheme mentioned can also provide reference for other turbine units.

Keywords

Periodic test Nuclear power Load fluctuation Optimization Time shorten 

References

  1. 1.
    Ma, C.L., Wang, Y.M., Jiao, K.: Turbine valve test logic perfection. Northeast Electr. Power Technol. 36(1), 44–46 (2015)Google Scholar
  2. 2.
    Dong, W., Huang, M.H., Zeng, B.: Study on the valve position fluctuation of turbine main regulator valve in nuclear power plant. Process Autom. Instrum. 36(11), 50–52 (2015)Google Scholar
  3. 3.
    Xia, W.: Comprehensive optimization measures for unilateral joint valve activity test of high pressure total valve-governing valve of 600 MW supercritical steam turbine. Guangdong Electr. Power 27(5), 23–27 (2014)Google Scholar
  4. 4.
    Specification of instrumentation and control for turbine in nuclear power plant. NB/T 25019 (2014)Google Scholar
  5. 5.
    Zeng, B., Zhan, X.L., Zhang, C.: Analysis and research on the standardized design of turbine control system in nuclear power plant. Process Autom. Instrum. 36(11), 36–40 (2015)Google Scholar
  6. 6.
    Sun, X.L., Zhao, S.Y.: Commissioning test of stop valve and control valve for semi-speed steam turbine in 1119 MW nuclear power plant. Electr. Power Constr. 34(5), 62–65 (2013)Google Scholar

Copyright information

© Springer Nature Singapore Pte Ltd. 2018

Authors and Affiliations

  1. 1.State Key Laboratory of Nuclear Power Safety Monitoring Technology and EquipmentChina Nuclear Power Engineering Co., Ltd.ShenzhenChina

Personalised recommendations