Advertisement

The Analysis of Periodic Test Solution for Main Feedwater Isolation Valve

  • Zhi-Hong LvEmail author
Conference paper
  • 563 Downloads
Part of the Lecture Notes in Electrical Engineering book series (LNEE, volume 455)

Abstract

This paper relates with the main feedwater isolation valve of nuclear power plant in the periodic test. The article analyzes the requirements of standard and summarizes the series of related standards. The classification, content and method of periodic test have been described. The solutions are proposed according to the problems of the main feedwater isolation valves in T3 test. In the design process of the periodic test solution, not only the design standards should be satisfied, the compatibility of test equipment and field equipment to different types of actuators should also be considered.

Keywords

Periodic test T3 test Main feedwater isolation valve 

References

  1. 1.
    Solution for Periodic Interface Test. Mitsubishi motors (2014)Google Scholar
  2. 2.
    IEEE 603: Standard criteria for safety systems for nuclear power generating stations (2009)Google Scholar
  3. 3.
    IEEE 338: Standard for criteria for the periodic surveillance of nuclear power generating station safety (2012)Google Scholar
  4. 4.
    GB/T 13284.1: The safety systems for nuclear power plants-Part 1: Design criteria (2008)Google Scholar
  5. 5.
    Zhang, L.Q., Jiang, H., Tian, Y.J.: Periodical test solution for safety I&C system of CPR1000 new project. Chin. J. Nucl. Sci. Eng. 30, 103–109 (2010)Google Scholar
  6. 6.
    IEC 60671: Nuclear power plants - Instrument and control systems important to safety - Surveillance testing (2007)Google Scholar

Copyright information

© Springer Nature Singapore Pte Ltd. 2018

Authors and Affiliations

  1. 1.State Key Laboratory of Nuclear Power Safety Monitoring Technology and EquipmentChina Nuclear Power Design Co., Ltd.ShenzhenChina

Personalised recommendations