Abstract
In the Section 7 of the latest IEEE 383-2015 [1], it is required that the qualification of the cables located in the mild environment shall include long-term water immersion testing for 1 year period. Also, in some third generation nuclear power plant, it is required that the 1E or non-1E shall be conducted the test for spray/immersion conditions with extreme pH in non-DBA Conditions. Based on this, the test for spray/immersion conditions with extreme pH is more and more paid attention. However, the research on this test has not been done in China. The aim at this article is doing the research of test of spray/immersion conditions with extreme pH, and is to discuss and introduce the qualification method.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
IEEE Standard for Qualifying Class 1E Electric Cables and Field Splices for Nuclear Power Generating Stations, IEEE 383-2015, 9 (2015)
IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, IEEE 323-2003, 1 (2004)
Ding, Kai: Study on Pipe Whip Analysis of High Energy Pipe Break. Shanghai, China (2014)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2018 Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Wang, XY., Zhu, FF., Wu, Q., Yang, JY. (2018). Research on Test for Spray/Immersion Conditions with Extreme pH of Third Generation Nuclear Class 1E Cables. In: Xu, Y., Gao, F., Chen, W., Liu, Z., Gu, P. (eds) Nuclear Power Plants: Innovative Technologies for Instrumentation and Control Systems. SICPNPP 2017. Lecture Notes in Electrical Engineering, vol 455. Springer, Singapore. https://doi.org/10.1007/978-981-10-7416-5_10
Download citation
DOI: https://doi.org/10.1007/978-981-10-7416-5_10
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-10-7415-8
Online ISBN: 978-981-10-7416-5
eBook Packages: EnergyEnergy (R0)