Skip to main content

Evaluate the Impact on Adjacent MRT Station from Shield Tunneling by Numerical Analysis and Risk Management – Taking Taipei MRT Circular Line for Example

  • Conference paper
Book cover Proceedings of the 2nd International Symposium on Asia Urban GeoEngineering

Abstract

The first and second phase of Taipei Mass Rapid Transit (MRT) networks were operated now, and the additional routes were approved under design and construction. Although the developed MRT network provides great convenience to passengers, the planned new routes and stations usually overlap the operated ones. Therefore, the complexity and difficulty of design and analysis are gradually increased, and the geotechnical analysis tools should also be improved. In this project, risk identification and rating are carried out at first to realize the risk which might happen at each construction schedule. The strategies in accordance with each risk item are figured out at the design stage to mitigate the risk as much as possible. Hence, the numerical analysis (1-D, 2-D, 3-D) follows the strategy suggestions to simulate whether the effect of these risk strategies is enough or not. The feedback database of previous projects from the in-situ monitoring results could provide some basis for numerical analysis to assume the suitable parameter. Therefore, the analysis results could simulate the actual condition closer, and the analysis results should satisfy the related standard demands. For monitoring the safety of the operation station at all times, automatic monitoring system is set up to monitor the deformation immediately during the whole life cycle.

The major goal is that “Prevent in design, Manage in construction, Monitor after completing”, and the passengers’ safety could be ensured under constructing the new routes. The evaluation and analysis of the impact on the existing stations from the nearby constructions were discussed in this study, and the conclusions could provide some suggestions for the design and risk management.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Chen-Wei Hung .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer Nature Singapore Pte Ltd. and Zhejiang University Press

About this paper

Cite this paper

Hung, CW., Lai, CM., Su, FL. (2018). Evaluate the Impact on Adjacent MRT Station from Shield Tunneling by Numerical Analysis and Risk Management – Taking Taipei MRT Circular Line for Example. In: Chen, R., Zheng, G., Ou, C. (eds) Proceedings of the 2nd International Symposium on Asia Urban GeoEngineering. Springer Series in Geomechanics and Geoengineering. Springer, Singapore. https://doi.org/10.1007/978-981-10-6632-0_26

Download citation

  • DOI: https://doi.org/10.1007/978-981-10-6632-0_26

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-10-6631-3

  • Online ISBN: 978-981-10-6632-0

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics