Abstract
This chapter provided an overview of the objective and structure of the book as well as of the one-site case study on which it is based. In particular, it proposed a framework on how the multiplicity of laws and intermediary informal normative orders in the Philippine housing and relocation system has created negative unintended effects to the government’s Post-Disaster Recovery (PDR) program under the 2010 Philippine Disaster Risk Reduction Management Act (PDRRMA). Applying the sociological and normative legal pluralist perspectives and the one-site case study method, it outlined broadly the theoretical and methodological framework for evaluating the adequacy of the housing and resettlement project of the Tropical Storm Ketsana victims in the government-owned Southville Rodriguez Housing Project (SRHP), one of the many Southville housing projects established by the government in various parts of the country. Lastly, it showed a roadmap of the book, explaining briefly the content of each chapter and how the chapters are interrelated to achieve the book’s overall objectives.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Notes
- 1.
- 2.
“The Human Cost of Human-Related Disasters: 1995–2015” Retrieved from http://www.unisdr.org/7B39392C-70B6-4451-8831-EAA0AA3B3130/FinalDownload/DownloadId-45F0A75073EB82DEA2E80C3CB638DFEC/7B39392C-70B6-4451-8831-EAA0AA3B3130/2015/docs/climatechange/COP21_WeatherDisastersReport_2015_FINAL.pdf.
- 3.
A fact-finding mission by Demolitionwatch in the SRHP Phase 8B, for instance, revealed that relocatees have no security of tenure to their housing units. The relocation area lacks materials, services, and infrastructure, and the housing units are defective and made of substandard construction materials, etc. See urgent appeal to the United Nations at https://demolitionwatch.wordpress.com/2012/02/Urgent-appeal-f-2/. The religious group, Claretians, also made a similar appeal to the government to improve the lives of the relocatees in the SRHP.
- 4.
UN-HABITAT (2007). Forced Evictions—Towards Solutions?: Second Report of the Advisory Group on Forced Evictions to the Director of UN-HABITAT. Nairobi, Kenya: Advisory Group on Forced Eviction (AGFE) pp. 43–44.
- 5.
The West and East Valley Fault line system spans from Montalban (Rodriguez), Rizal, i.e., near the SRHP, all the way to Carmona, Cavite, and is considered the most feared event, known as the “Big One,” in case it moves. It could affect millions of people and paralyze cities and towns nearby, including Metro Manila, because it is predicted to occur at any time registering a >7.0 magnitude earthquake. See interactive map at http://www.s1expeditions.com/2014/07/158-west-east-valley-fault-line.html.
- 6.
See “Relocation sites: the land of empty promises in the middle of nowhere.” Retrieved from http://bulatlat.com/main/2015/01/14/relocation-sites-the-land-of-empty-promises-in-the-middle-of-nowhere/.
- 7.
- 8.
- 9.
Because a national budget has been set aside for the construction of government relocation and housing projects, a portion of the ADB loan is intended for the social services and livelihood programs of relocatees affected by Pasig River rehabilitation. However, disgruntled relocatees and members of the KV1 Action Group asked President Gloria Macapagal‒Arroyo’s government to probe the anomalous PHP 2.116 billion budget of the Pasig River Rehabilitation Commission (PRRC) for its resettlement projects. They alleged that the Estrada government wasted the huge amount of loan from the Asian Development Bank (ADB), which is part of the overall PHP 7.9 billion budget for the river’s rehabilitation (http://bulatlat.com/archive1/009erap_city.htm).
- 10.
- 11.
See Fig. 1.2.
- 12.
- 13.
- 14.
- 15.
For a more detailed explanation of these types of resettlement programs, see Ballesteros and Egana (2012) at http://www.dbm.gov.ph/62C97C27-20B5-4CB0-9BD2-8286EDF12907/FinalDownload/DownloadId-802ACD5E5502BED15120A5F66A855713/62C97C27-20B5-4CB0-9BD2-8286EDF12907/wp-content/uploads/DBM%20Publications/FPB/ZBB-2012/e.pdf.
References
ADB. (2015). Proceedings of the regional knowledge forum on post-disaster management, October 20–21, 2015. Asian Development Bank. Accessed February 29, 2016.
Ballano, V. (2016). Sociological perspectives on media piracy in the Philippines and Vietnam. Singapore: Springer Science+Business Media Singapore.
Ballesteros, M. (2000). Land Use Planning in Metro Manila and the Urban Fringe: Implications on the Land and Real Estate Market. Discussion Paper Series No. 2000–20
Ballesteros, M., & Egana, J. (2012). Efficiency and effectiveness review of the National Housing Authority (NHA) resettlement program. http://www.dbm.gov.ph/62C97C27-20B5-4CB0-9BD2-8286EDF12907/FinalDownload/DownloadId-802ACD5E5502BED20A5F66A855713/62C97C27-20B5-4CB0-9BD2-8286EDF12907/wp-content/uploads/DBM%20Publications/FPB/ZBB-2012/e.pdf. Accessed March 4, 2015.
Baroudi, B., & Rapp, R. R. (2014). Stakeholder management in disaster restoration projects. International Journal of Disaster Resilience in the Built Environment, 5(2), 182–193.
Barton, Allen H. (1969). Communities in disaster: A sociological analysis of collective stress situations. Garden City, New York: Doubleday & Company Inc.
Benator, B., & Thumann, A. (2003). Project management and leadership skills for engineering and construction projects. United States of America: The Fairmont Press Inc.
Berke, P., Wenger, D., & Kartez, J. (1993). Recovery after Disaster: Achieving Sustainable Development, Mitigation and Equity. Disasters, 17(2), 93–109.
Boen, T. (2006). Building a safer Aceh, reconstruction of houses, one year after the Dec. 26, 2004 Tsunami. In the 40th Anniversary of Trisakti University, “Answering the Challenges in Today’s Civil Engineering,” January 26, 2006.
Carver, R. (2011). Is there a human right after a disaster? Environmental Hazards, 10(20122), 232–247. http://www.humanitarianinfo.org/iasc/downdoc.aspx?docID=4503&type=pdf. Accessed December 14, 2012.
Chang, Y., et al. (2010). Resourcing challenges for post-disaster housing reconstruction: A comparative analysis. Building Research & Information, 38(3), 247–264.
Chang, Y., Wilkinson, S., Seville, E., & Potangaroa, R. (2012). Changes in resource need for post-disaster reconstruction: A longitudinal study in China. Building Research and Information, 40(3), 327–336.
Coburn, A. W., et al. (1984). Reconstruction and resettlement 11 years later: A case study of Bingöl Province, Eastern Turkey. In S. Schupisser & J. Studer (Eds.), Earthquake relief in less industrialized areas (pp. 49–58). Rotterdam: A. A. Balkema.
Cooke-Davies, T,. J. (2002). Towards improved project management practice, PhD thesis, Leeds Metropolitan University.
Crawford, L.et al. (2012). Building capability for disaster resilience. Paper presented at the 28th Annual Conference of Association of Researchers in Construction Management (ARCOM), September 2012, Edinburgh, Scotland.
Cutter, S. L., Boruff, B. J. & Shirley, W. L. (2003). Social Vulnerability to Environmental Hazards. Social Science Quarterly, 84, 242–261. doi:10.1111/1540-6237.8402002
Cutter, S. L., & Emrich, C. T. (2006). Moral hazard, social catastrophy: The changing face of vulnerability along the hurricane coasts. The Annals of the American Academy, 604, 102–112.
Davidson, C. H., et al. (2007). Truths and myths about community participation in post-disaster housing projects. Habitat International, 31(1), 100–115.
Deflem, Matthieu (Ed.). (2012). Disaster, hazards, and law. Sociology of crime, law and deviance (Vol. 17). United Kingdom: Emerald.
Dhillon, B. S. (2002). Engineering and technology management tools and applications (1st ed.). Boston, London: Artech House Publishers.
Drabek, T. E., & McEntire, D. A. (2002). Emergent phenomena and multiorganizational coordination in disasters: Lessons from the research literature. International Journal of Mass Emergencies and Disasters, 20, 197–224.
Flatt, V. B., & Stys, J. J. (2013). Long term recovery in disaster response and the role of non-profits (April 22, 2012). Oñati Socio-Legal Series, 3(2). Available at SSRN: http://ssrn.com/abstract=2119879. Accessed February 1, 2015.
Freeman, P.K. (2007). Allocation of post-disaster reconstruction financing to housing. Building Research & Information, 32(5), 37–41 (January 2013).
Ge, Y., Gu, Y. & Deng, W. (2010). Evaluating china’s national post-disaster plans: The 2008 Wenchuan Earthquake’s recovery and reconstruction planning. International Journal of Disaster Risk Science, 1(2): 17–27. doi:10.3974/j.issn.2095-0055.2010.02.003
Grenfell, L. (2006). Legal pluralism and the rule of law in Timor-Leste. Leiden Journal of International Law, 19(2006), 305–337.
Haigh, R., & Sutton, R. (2012). Strategies for the effective engagement of multi-national construction enterprises in post-disaster building and infrastructure projects. International Journal of Disaster Resilience in the Built Environment, 3(3), 270–282.
Harris, N. R. (2010). Discretion and expediency in the enforcement of planning controls. Town Planning Review, 81(6), 675–700.
Hayes, P. F., & Hammons, A. (2000). Disaster recovery project management. Paper presented at the Industry Applications Conference, October 8–12, 2000, Rome.
Hidayat, B. & Egbu, C. O. (2010). A literature review of the role of project management in post-disaster reconstruction, in: 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. http://usir.salford.ac.uk/10144/
Hughes, B. & Cotterell, M., (2002), Software Project Management (2nd edition). New Jersey: Wiley & Sons.
IFRC (2015). How law and regulation supports disaster risk reduction Haiti case - study report. Geneva: Haiti Red Cross Society and the International Federation of Red Cross and Red Crescent Societies. Available at http://www.ifrc.org/Global/Publications/IDRL/country%20studies/HAITI%20DRR%20Report.pdf
Ika, L. A. (2012). Project Management for Development in Africa: Why Projects Are Failing and What Can Be Done About It. Proj Mgmt Jrnl, 43, 27–41. doi:10.1002/pmj.21281
Imura, M., & Shaw, R. (2009). Challenges and potentials of post-disaster relocation. Asian Journal of Environment and Disaster Management, 1(2), 199–221. doi:10.3850/S1793924009000029
Ismael, D. et al. (2005). A review of project management for post-disaster reconstruction project: From International NGOs (INGOs) Perspective. Research in Civil and Environmental Engineering, 2(04), 199–215. Retrieved from https://www.academia.edu/10168784/A_REVIEW_OF_PROJECT_MANAGEMENT_FOR_POSTDISASTER_RECONSTRUCTION_PROJECT_FROM_INTERNATIONAL_NGOs_INGOs_PERSPECTIVE
Iwai, T., & Tabuchi, S. (2013). Survey: Housing projects delayed for more than 10,000 evacuees. The Asahi Shimbun.
Kennedy, J., et al. (2008). The meaning of “build back better”: Evidence from post-tsunami Aceh and Sri Lanka. Journal of Contingencies and Crisis Management, 16(1), 24–36.
Kerzner, H. (2003). Project management: A systems approach to planning, scheduling, and controlling eight edit. New Jersey, USA: Wiley.
Kim, K., & J. Choi (2013) Breaking the vicious cycle of flood disasters: goals of project management in post-disaster rebuild projects. International Journal of Project Management, 31, 147–160.
LaBrosse, M. (2007). Project management’s role in disaster recovery. Leadership and Management in Engineering, 89(July), 1.
Linda M. Peñalba, Dulce D. Elazegui, Juan M. Pulhin & Rex Victor O. Cruz, (2012). Social and institutional dimensions of climate change adaptation, International Journal of Climate Change Strategies and Management, 4(3), 308–322. https://doi.org/10.1108/17568691211248748
Lloyd-Jones, T. (2006). Mind the Gap! Post-disaster reconstruction and the transition from humanitarian relief. Summary report for RICS by the Max Lock Centre at the University of Westminster.
Marchewka, J. T. (2006). Information Technology Project Management. New Jersey: John Wiley & Sons.
Matsumaru, R., Nagami, K., & Takeya, K. (2012). Reconstruction of the Aceh Region following the 2004 Indian Ocean tsunami disaster: A transportation perspective. IATSS Research, 36(1) 11–19. https://doi.org/10.1016/j.iatssr.2012.07.001
Michael, A. J. (1988). Effects of three-dimensional velocity structure on the seismicity of the 1984 Morgan Hill, California, aftershock sequence. Bulletin of the Seismological Society of America, 78, 1199–1221.
Mileti, Dennis. (1999). Disasters by design: A reassessment of natural hazards in the United States. Washington, D.C.: Joseph Henry Press.
Moe, T. L., & Pathranarakul, P. (2006). An integrated approach to natural disaster management: Public project management and its critical success factors. Disaster Prevention and Management, 15(3), 396–413.
Moloney, A. (2014). Haitians still homeless, “suffering in despair” 4 years after the quake-Amnesty (pp. 4–6). Thomson Reuters Foundation.
Morrow, B. H. (1999). Identifying and Mapping Community Vulnerability. Disasters, 23, 1–18. doi:10.1111/1467-7717.00102
Munns, A., & Bjeirmi, B. (1996). The role of project management in achieving project success. International Journal of Project Management, 14(2), 81–87.
NDRRCC Report (2011). National Disaster Risk Reduction and Management Plan (NDRRMP) 2011–2028. Available at http://www.adrc.asia/documents/dm_information/Philippines_NDRRM_Plan_2011-2028.pdf
Nazara, S., & Resosudarmo, B. P. (2007). Aceh-Nias reconstruction and rehabilitation: Progress and challenges at the end of 2006, Tokyo.
OHCHR. (2009). The right to adequate housing. Fact Sheet No. 21 (Rev. 1). http://www.ohchr.org/Documents/Publications/FS21_rev_1_Housing_en.pdf. Accessed February 12, 2015.
Oliver-Smith, A. (1991). Successes and failures in post-disaster resettlement. Disasters, 15(1), 12–23.
Olshansky, Robert B., Johnson, Laurie A., & Topping, Kenneth C. (2006). Rebuilding Communities Following Disaster: Lessons from Kobe and Los Angeles. Built Environment, 32(4), 354–374(21). https://doi.org/10.2148/benv.32.4.354
Quarantelli, F. L. (1988). Disaster management crisis: A summary of research findings. Journal of Management Studies, 25(4), 373–385.
Quarantelli, F. L. (2000). Disaster Planning, emergency management, and civil protection: The historical development and current characteristics of organized efforts to prevent and respond to disasters. Preliminary Paper #301: Disaster Research Center, University of Delaware. http://www.udel.edu/DRC/PreliminaryPapers/pp.301.pdf. Accessed March 2, 2013.
Roosli, R., Vebry, M., Mydin, A. O., & Ismail, M. (2012). Building and Planning of Post-Disaster Rehabilitation and Reconstruction. International Journal of Academic Research, 4(1), 194–199.
Roseveare, C. (2013). Rule of law and international development. London: DFID.
Rubin, C. (1991). Recovery from disaster. In: Drabek, T. E. & Hoetmer, G. J. (Eds.), Emergency management: Principles and practice for local government. Washington D.C.: International City Management Association.
Rubin, Claire B., Saperstein, Martin D. & Barbee, Daniel G. (1985). Community recovery from a major natural disaster. FMHI Publications. Paper 87. http://scholarcommons.usf.edu/fmhi_pub/87
Schwab, J. (1998). Planning for post disaster recovery and reconstruction. PAS Report No. 483/484, American Planning Association, Chicago, IL.
Seleim, A., & Bontis, N. (2009). The relationship between culture and corruption: A cross-national study. Journal of Intellectual Capital, 10(1), 165–184. doi:10.1108/14691930910922978
Sherwood, A., et al. (2015). Resolving post-disaster displacement: Insights from the Philippines after Typhoon Haiyan (Yolanda). The Brookings Institution. International Organization for Migration (IOM).
Steinberg, F. (2007). Housing reconstruction and rehabilitation in Aceh and Nias. Indonesia-Rebuilding lives. Habitat International, 31(1), 150–166.
Steret, S. (2013). Disaster and Sociolegal Studies. New Orleans: LA: Onati Socio-Legal Series, Quid Pro Books.
Sydow, J. et al (2004). Project-Based Organizations, Embeddedness and Repositories of Knowledge: Editorial. Organization Studies, 25, 1475–1489.
Tobin, Graham A. & Ollenburger, Jane C. (1993). Natural Hazards and the Elderly. Boulder: University of Colorado, Natural Hazards Research and Applications Information Center.
Turner, B. L., et al. (2003) A framework for vulnerability analysis in sustainability science. Proceedings of the National Academy of Sciences, 100(14), 8074–8079.
UNHCR (2014). Global Strategy for Resettlement and Shelter: A UNHCR Strategy 2014–2018. Available at http://www.unhcr.org/530f13aa9.pdf
Valte, M. (2000). Chapter 6. Urban Shelter. In HUDCC 2000 Report. Urban Partnerships Foundation. Retrieved from http://www.ombudsman.gov.ph
Walker, D., Steinfort, P., & Maqsood, T. (2014). Stakeholder voices through rich pictures. International Journal of Managing Projects in Business, 7(3), 342–361.
World Bank. (2013). Building resilience: Integrating climate and disaster risk into development. Washington DC. Available at: www.worldbank.org
World Bank. (2016). Doing business 2016: Measuring regulatory quality and efficiency.
Ye, Y., & Okada, N. (2002). Integrated relief and reconstruction management following a natural disaster. In Second Annual IIASA-DPRI Meeting, Integrated Disaster Risk Management: Megacity Vulnerability and Resilience (pp. 1–18), IIASA, Laxenburg, Austria, July 29–31, 2002.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2017 Springer Nature Singapore Pte Ltd.
About this chapter
Cite this chapter
Ballano, V.O. (2017). Introduction. In: Law, Normative Pluralism, and Post-Disaster Recovery. Springer, Singapore. https://doi.org/10.1007/978-981-10-5074-9_1
Download citation
DOI: https://doi.org/10.1007/978-981-10-5074-9_1
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-10-5073-2
Online ISBN: 978-981-10-5074-9
eBook Packages: Social SciencesSocial Sciences (R0)