Skip to main content

Project Management and Planning

  • Chapter
  • First Online:
Book cover Offshore Platform Integration and Floatover Technology

Part of the book series: Springer Tracts in Civil Engineering ((SPRTRCIENG))

Abstract

Commonly, an engineer is more interested in the technical details and the development journey of a new technology. However, if he/she has the opportunities to be assigned to a real project for the floatover operation, his/her knowledge in the project management will be a very important factor for him/her to effectively fit in the project team. Project management plays the vital role in the success of the project. If the reader is only interested in the technique aspect of the floatover technology, he/she can skip this chapter. The discussions in this chapter touch several important issues for offshore installation project management. Through the materials presented, it is emphasized how the integrated efforts can be realized through well-established management systems. Details of project team framework, project QMS, PEP, communication network, document control system, etc. are also covered in the discussion.

The original version of this chapter was revised: See the “Chapter Note” section at the end of this chapter for details. The erratum to this chapter is available at 10.1007/978-981-10-3617-0_11

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Institutional subscriptions

References

  1. NORSOK Standard: Common Requirements MARINE OPERATIONS, J-CR-003, Rev 1., (1995)

    Google Scholar 

  2. EIA Document: Overview of U.S. Legislation and Regulations Affecting Offshore Natural Gas and Oil Activity, September 2005. www.eia.doe.gov

  3. Vinnem, J.E., et al.: Risk Assessments for Offshore Installations in the Operational Phase, ORA (Operational Risk Assessment) paper, supposed to be presented at ESREL (European Safety and Reliability) (2003)

    Google Scholar 

  4. Bamidele, B.: Review of the Hazards and Management Control Issues in Abandonment Safety Cases, OTH 547, ISBN 0-7176-1429-8 (1997)

    Google Scholar 

  5. Article: Case Study: Big Project, Big Difference, Big Results. Hitachi Consulting, London

    Google Scholar 

  6. Handbook: Group Health, Safety, Environment and Security Handbook. MA-GL-HSE-005 Version 1, Subsea 7 (2012). http://www.subsea7.com/content/dam/subsea7/documents/whatwedo/HSES-handbook.pdf

  7. Document: Project Specific HSE Plan, Tolunay-Wong Engineers, Inc.

    Google Scholar 

  8. Cliem, R.: Effective Communications for Project Management, © 2008 Taylor & Francis Group, LLC, ISBN‑13: 978‑1‑4200‑6246‑5

    Google Scholar 

  9. Wang, A., et al.: A Complete Failure of A Floatover Installation with Strand Jack Lifting Scheme and A Great Success of Float-on and Float-off Rescue Operation, OMAE2014-24117. San Francisco, California

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2017 Science Press, Beijing and Springer Nature Singapore Pte Ltd.

About this chapter

Cite this chapter

Liu, G., Li, H. (2017). Project Management and Planning . In: Offshore Platform Integration and Floatover Technology. Springer Tracts in Civil Engineering . Springer, Singapore. https://doi.org/10.1007/978-981-10-3617-0_7

Download citation

  • DOI: https://doi.org/10.1007/978-981-10-3617-0_7

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-10-3616-3

  • Online ISBN: 978-981-10-3617-0

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics