Skip to main content
  • 1052 Accesses

Abstract

Environment management team does not involve into tendering process in small and medium projects; however, in mage construction project, it is necessary for environment management team to look into every step of tendering. The “tendering” referred to hereby basically include the requirements in the environment protection part of the tender document for General Contractor candidates, and the tendering for dedicated environment protection facilities for this project as well. It takes some craftsmanship to do tender management. A well-managed tender can take predominant effect on the contractor’s performance after boarding.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

eBook
USD 16.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 119.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Jianming Yang .

Rights and permissions

Reprints and permissions

Copyright information

© 2017 East China University of Science and Technology Press and Springer Nature Singapore Pte Ltd.

About this chapter

Cite this chapter

Yang, J. (2017). Tendering. In: Environmental Management in Mega Construction Projects. Springer, Singapore. https://doi.org/10.1007/978-981-10-3605-7_10

Download citation

Publish with us

Policies and ethics