Identification of the Residual Value Risk Factors for Road PPP Projects in China: Questionnaire Survey and Analysis

  • Conference paper
  • First Online:

Abstract

With the increasing use of Public–Private Partnership (PPP) mode in road construction, the discrepancy between residual value and agreement of PPP projects in the transition phase has become a prominent problem. Though the risk management of road PPP projects has been lucubrated, systematic research of residual value of them are still in a state of blank. Research described in this paper aims to identify the residual value risk (RVR) factors of road PPP projects and find out the key factors of them. RVR factors of road PPP projects were first identified through the method of literature collection. In this research, 29 RVR factors were identified which were divided into 4 packages. The importance degree of each factor was then presented via descriptive analysis and confirmatory factor analysis based on the data of a questionnaire survey which explored PPP experts’ perceptions of 29 factors. The order of the importance degree of each factor indicates that the incidence of residual risks within road PPP projects is strongly influenced by organizational risk, design risk, construction costs, quality of projects, operating costs, quality of service, maintenance costs, market demand and toll pricing. These 29 factors can be used to recognize the risk source and reduce the incidence of residual risks of road PPP projects.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

References

  1. Teng TL, Yuan JF, Li QM (2014) Analysis of the formation path of the residual value risk in public private partnership projects based on SEM method. Adv Mater Res 1079–1080:1126–1130

    Article  Google Scholar 

  2. Bing L, Akintoye A, Edwards PJ et al (2005) The allocation of risk in PPP/PFI construction projects in the UK. Int J Project Manage 23(1):25–35

    Article  Google Scholar 

  3. Chan APC, Yeung JFY (2011) Empirical study of risk assessment and allocation of public-private partnership projects in China. J Manage Eng 27(3):136–148

    Article  Google Scholar 

  4. Leruth LE (2012) Public-Private cooperation in infrastructure development: a principal-agent story of contingent liabilities, fiscal risks, and other (Un)pleasant surprises. Netw Spatial Econ 12(2):223–237

    Article  Google Scholar 

  5. Xu Y, Sun C, Skibniewski MJ (2012) System dynamics (SD)-based concession pricing model for PPP highway projects. Int J Project Manage 30(2):240–251

    Article  Google Scholar 

  6. Heravi G, Hajihosseini Z (2012) Risk allocation in public-private partnership infrastructure projects in developing countries: case study of the Tehran-Chalus Toll Road. J Infrastruct Syst 18(3):210–217

    Article  Google Scholar 

  7. Bagui SK, Ghosh A (2012) Traffic and revenue forecast at risk for a BOT road project. KSCE J Civil Eng 16(6):905–912

    Article  Google Scholar 

  8. Wu D, Yin Y, Lawphongpanich S (2011) Optimal selection of build–operate-transfer projects on transportation networks. Transp Res Part B: Methodol 45(10):1699–1709

    Article  Google Scholar 

  9. Meduri SS, Annamalai TR (2013) Unit costs of public and PPP road projects: evidence from India. J Constr Eng Manage 139(1):35–43

    Article  Google Scholar 

  10. Bagui SK, Ghosh A (2012) Traffic and revenue forecast at risk for a BOT road project. KSCE J Civil Eng 16(6):905–912

    Article  Google Scholar 

  11. Ke Y, Wang S, Chan APC (2010) Preferred risk allocation in China’s public–private partnership (PPP) projects. Int J Project Manage 28(5):482–492

    Article  Google Scholar 

  12. Queiroz C (2007) Public-Private partnerships in highways in transition economies: recent experience and future prosupects. Transp Res Rec J Transp Res Board 1996:34–40

    Article  Google Scholar 

  13. Tan Z, Yang H (2012) Flexible build-operate-transfer contracts for road franchising under demand uncertainty. Transp Res Part B Methodol 46(10):1419–1439

    Article  Google Scholar 

  14. Akbıyıklı R (2013) Performance assessment of a private finance initiative road project. Transport 28(1):11–24

    Article  Google Scholar 

  15. Khan AM (2013) Risk factors in toll road life cycle analysis. Transportmetrica A Transp Sci 9(5):408–428

    Article  Google Scholar 

  16. Yuan J, Wang C, Skibniewski MJ (2012) Developing key performance indicators for public-private partnership projects: questionnaire survey and analysis. J Manage Eng 28(3):252–264

    Article  Google Scholar 

Download references

Acknowledgments

The authors’ special thanks go to all and reviewers of the paper, and to the National Natural Science Foundation of China (NSFC-71001027, 71472037), Social Foundation of Jiangsu Province, China (13GLB005), Program for Outstanding Young Teachers of Southeast University (2242015R30009), and the Fundamental Research Funds for the Central Universities for financially supporting this research.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Yingjie Shao .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2017 Springer Science+Business Media Singapore

About this paper

Cite this paper

Shao, Y., Yuan, J., Li, Q. (2017). Identification of the Residual Value Risk Factors for Road PPP Projects in China: Questionnaire Survey and Analysis. In: Wu, Y., Zheng, S., Luo, J., Wang, W., Mo, Z., Shan, L. (eds) Proceedings of the 20th International Symposium on Advancement of Construction Management and Real Estate. Springer, Singapore. https://doi.org/10.1007/978-981-10-0855-9_33

Download citation

  • DOI: https://doi.org/10.1007/978-981-10-0855-9_33

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-10-0854-2

  • Online ISBN: 978-981-10-0855-9

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics