Skip to main content

Special Assumptions for the Draft Agreement

  • Chapter
A Joint Venture Agreement for Seabed Mining

Abstract

In the Draft Agreement it is foreseen that the joint venture operation will take place in a “reserved site” within the meaning of Annex III, Article 8 of the Convention. The underlying premise is that a truly parallel system of access for contractors and for the Enterprise will be established in the Convention. A parallel system of access promises to represent a workable compromise between the interests of the industrialized nations and those of developing states.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

eBook
USD 16.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 16.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 1981 Springer Science+Business Media Dordrecht

About this chapter

Cite this chapter

Jaenicke, G., Schanze, E., Hauser, W. (1981). Special Assumptions for the Draft Agreement. In: A Joint Venture Agreement for Seabed Mining. Studies in Transnational Law of Natural Resources, vol 5. Springer, Dordrecht. https://doi.org/10.1007/978-94-017-4344-0_3

Download citation

  • DOI: https://doi.org/10.1007/978-94-017-4344-0_3

  • Publisher Name: Springer, Dordrecht

  • Print ISBN: 978-94-017-4346-4

  • Online ISBN: 978-94-017-4344-0

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics