Abstract
The operation of drilling a well into a potential reservoir interval is the only way to prove the presence of hydrocarbon. Whether a well is drilled onshore or offshore is immaterial to the fundamentals of the process. A classification of wells can be made as in Table 3.1.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Craft, B.C., Holden, W.R. and Graves, E.D. Well Design, Drilling and Production,Prentice-Hall, Houston.
Gray, G.R. and Darley, H.C.H. Composition and Properties of Oil Well Drilling Fluids,Gulf Publishing Company, Houston.
American Petroleum Institute API Bulletin 5C2 (1972).
Composite Catalogue of Oilfield Equipment and Services 35th Revision (1982–83), 5 vols. Gulf Publishing Co, Houston Tx.
Peden, J.M., Russel, J. and Oyeneyin, M.B. The design and optimisation of gravel packing operations in deviated wells, SPE Paper 12997, Proc. Europe (1984), 321
Bruijn, H.J., Kemp, A.J. and van Donegen, J.C. The use of MWD for turbodrill performance optimisation, SPE Paper 13000, Proc. Europe (1984), 353.
Bailey, T.J., Bern, P.A. and McEwan, F. Downhole rheological behaviour of low toxicity oil muds, SPE Paper 13001, Proc. Europe (1984), 361.
Paterson, A.W. and Shute, J.P. Experience with polycrystalline diamond compact bits in the northern North Sea, Paper EUR 339, Proc. (1982), 575.
Johnson, K.A. and Burdyulo, L. Successful liner completion on the Muchison platform, Paper EUR 365, Proc. Europe (1982) 769.
CSRPPGN Blow Out Prevention and Well Control,Graham and Trotman, London (1981).
ENSPM, Inst. Franc. du. Petrole Drilling Data Handbook, Graham and Trotman, London (1978).
Adams, N. and Frederick, M. Drilling costs, OGJ (Dec. 6, Dec. 13, Dec. 27, 1982 ).
Baldwin, D.D. Drilling high angle directional wells, Proc. 11th World Pet. Cong. Paper PD5(2), (1983).
Tanguy, D.R. Downhole measurements while drilling, Proc. 11th World Pet. Cong. Paper PD5(3), (1983).
ENSPM Geological and Mud Logging in Drilling Control — Catalogue of Typical Cases,Graham and Trotman, London (1982).
CSRPPGN Drilling Mud and Cement Slurry Rheology Manual,Graham and Trotman, London (1982).
van Lingen, N.H. Bottom scavenging — a major factor governing penetration rates at depth, Trans. AIME 225 (1962), 187.
Holster, J.L. and Kipp, R.J. Effect of bit hydraulic horsepower on drilling rate of a PCD compact bit, JPT (Dec. 1984), 2110.
Cooke, C.E., Kluck, M.P. and Medrano, R. Annular pressure and temperature measurements diagnose cementing operations, JPT (Dec. 1984). 2181.
Adams, N. Well Control Problems and Solutions, Pennwell, Tulsa (1980).
Rowlands, G.W. and Booth, N.R. Planning for deep high pressured wells in the northern North Sea, EUR 244, Proc. Europ. Soc. Pet. Eng.
World Oil 1985 Tubing and casing joint tables, World Oil (Jan. 1985 ), 37.
Woodyard, A.H. Risk analysis of well completion systems. JPT (April 1982) 713.
Denholm, J.M. Offshore drilling operations. Trans I.Mar. E (TM) 94 (1982) (26) 2.
Mohnot, S.M. Characterisation and control of fine particles involved in drilling, JPT (Sept 1985) 1622.
Remson, D. Planning techniques — Key to drilling efficiency. JPT (Sept 1985) 1613.
Black, A.D., Dearing, H.L. and Dibona, B.G. Effects of pore pressure and mild filtration on drilling rates in a permeable sandstone. JPT (Sept 1985) 1671.
Rabia, H. Specific Energy as a criterion for bit selection. JPT (July 1985) 1225.
Elliott, L.R. et al. Recording downhole data while drilling, JPT (July 1985) 1231.
Bourgoyne, A.T., and Holden, W.R. An experimental study of well control procedures for deepwater drilling operations. JPT (July 1985) 1239.
Warren, T.M. and Smith, M.B. Bottomhole stress factors affecting drilling rate at depth. JPT (Aug. 1985) 1523.
Hill, T.H., Money, R.C., and Palmer, C.R. Qualifying drillstring components for deep drilling. JPT (Aug. 1985) 1511.
Joosten, M.W. and Robinson, G.C. Development of specification for christmas tree and wellhead components. JPT (April 1985) 655.
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 1986 J S Archer and C G Wall
About this chapter
Cite this chapter
Archer, J.S., Wall, C.G. (1986). Oilwell Drilling. In: Petroleum Engineering. Springer, Dordrecht. https://doi.org/10.1007/978-94-010-9601-0_3
Download citation
DOI: https://doi.org/10.1007/978-94-010-9601-0_3
Publisher Name: Springer, Dordrecht
Print ISBN: 978-0-86010-715-6
Online ISBN: 978-94-010-9601-0
eBook Packages: Springer Book Archive