Abstract
The use of complex OR models gives rise to the problem of acceptance which has been being discussed since recently. In this discussion the existence of OR models is taken for granted. There is however, a problem of acceptance with regard to shaping a certain problem and handling it or not, once the customary scope of procedures and methods generally practiced gone beyond. More precisely, this refers to a first problem of acceptance as to the decision of deeming a problem worth being handled and shaped, the solution of which problem constituting a prerequisite for designing a model of higher complexity. The point is that the cases in question have to be new ones, otherwise the procedures applied would be commonly known and combine the formulation of the problem and possible ways of solution. Since time and cost are required for shaping the problem, the necessary expenditure has to be assured prior to the clear definition of the problem and the possibility of solving it.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Bibliography
W. Koenne, P. Zinterhof, Zuverlässigkeitstheoretische Analyse von Elektrizitätsversorgungsunternehmen. Springer-Verlag, Vol. 6 of the series of publications of the Technical University of Vienna
Deutsche Verbundgesellsphaft, Einführung in die Methode der Ausfallswahrscheinlichkeit von Kraftwerksblocken. Lecture 1969
Deutsche Verbundgesellschaft, Die Sicherheit der Stromversorgung. Special publication 1973
H. Niessen, Methoden der -Wahrscheinlichkeitsrechnung zur Bestimmung der Leistungsreserve und der Ausfallsdauer der Be- lastung von Kraftwerken. El.-Wi., volume 53 (1954).
G. Schenkel, Die Ausfallsdauerlinie - ein Beitrag zur Frage der Verfügbarkeit vom Dampfkraftwerken. El.-Wi., volume 65 (1966)
H.-D. Kochs, Theorie und Anwendung eines neuen Modells zur Berechnung der Kurzzeit-Zuverlässigkeit. ETZ-A, volume 96 (1975)
G. Traeder, Kurzzeitzuverlässigkeitsberechnungen zur Überwachung und Steuerung der schnellen Leistungsreserve von Elektrizitäts- versorgungsunternehmen im Verbundbetrieb. Dissertation RWTH Aachen
K.W. Edwin, Die Sicherheit der Stromversorgung - Leistungsreserve im Verbundbetrieb. Deutsche Verbundgesellschaft, Heidelberg 1973
G. Traeder, Beitrag zur Berechnung des Einflusses der schnellen Reserve auf die Kurzzeitzuverlässigkeit im Verbundsystem. ETZ-A, volume 96 (1975)
E. Witte, Organisation fur Innovationsentscheidungen. Göttingen 1973
E. Witte, Erfolg von Investitionen in neue Technologie durch richtige Auswahl der Mitarbeiter, included in Fortschrittliche Betriebsfiihrung und Industrial Engineering 24 (1975), page 47
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 1982 D. Reidel Publishing Company
About this chapter
Cite this chapter
Koenne, W. (1982). Problems Associated with the Design of a Reliability Model in Electricity Industry. In: Feichtinger, G., Kall, P. (eds) Operations Research in Progress. Theory and Decision Library, vol 32. Springer, Dordrecht. https://doi.org/10.1007/978-94-009-7901-7_35
Download citation
DOI: https://doi.org/10.1007/978-94-009-7901-7_35
Publisher Name: Springer, Dordrecht
Print ISBN: 978-94-009-7903-1
Online ISBN: 978-94-009-7901-7
eBook Packages: Springer Book Archive