Skip to main content
  • 125 Accesses

Abstract

In Section 6.6 of this report some ideas that would entail minor changes to existing liner design details, to aid decommissioning, were discussed. The paragraphs that follow discuss some possible, more wide ranging changes that could be made in liner design philosophy to facilitate the eventual removal of the liner from the vessel during the decommissioning phase.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 1984 ECSC, EEC, EAEC, Brussels and Luxembourg

About this chapter

Cite this chapter

Paton, A.A., Benwell, P., Irwin, T.F., Hunter, I. (1984). Removal of Liner and Penetrations. In: Civil Engineering Design for Decommissioning of Nuclear Installations. Springer, Dordrecht. https://doi.org/10.1007/978-94-009-5632-2_8

Download citation

  • DOI: https://doi.org/10.1007/978-94-009-5632-2_8

  • Publisher Name: Springer, Dordrecht

  • Print ISBN: 978-0-86010-614-2

  • Online ISBN: 978-94-009-5632-2

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics