Abstract
This chapter is intended to enhance the original Overall Equipment Effectiveness (OEE). Calculating plant/equipment OEE can be very helpful for monitoring trends (such as whether a given plant is improving OEE over time) or as a rough measure of where a manufacturng plant lies in the OEE benchmarking spectrum. OEE concept in Total Productive Maintenance (TPM) implementation truly reduces manufacturing complexity into simple, intuitive presentation of information. The proposed approaches establish the functional technique for improvement of the effectiveness of production lines operating and dealing with uncertainty of the six major losses to OEE. The losses associated with production and limits for that losses are the major indexes of the production line performance, because it enables direct evaluation of production line output. The OEE is the process, which is acquired to specify an equivalent weight setting of every single element, even if, each concerning losses are totally different. Hence, the study proposes a weighted approach, to identify dissimilarity in weighting of each OEE element. Theoretical values for the losses improve the measurement of the OEE and Fuzzy analysis can help the decision makers to assess OEE for plant performances. Further, proposed fuzzy methodology can be used to reduce the indecisiveness. Therefore this technique introduces fuzzy theory for OEE computation and will also assist decision makers to evaluate uncertainty and imprecision. The proposed concepts are used to find the OEE for the manufacturing plant, as well as to set the target for the plant and the area to focus for their improvement.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Abbreviations
- A:
-
Availability
- BD:
-
Break-Down
- JIPM:
-
Japan Institute of Plant Maintenance
- MI:
-
Minor/Idling stoppages
- OEE:
-
Overall Equipment Effectiveness
- P:
-
Performance rate
- PE:
-
Plant Effectiveness
- Q:
-
Quality rate
- RL:
-
Reject/rework Losses
- RS:
-
Reduced Speed
- SA:
-
Setup Adjustment
- SL:
-
Start-up Losses
- TPM:
-
Total Productive Maintenance
References
Nakajima S (1988) Introduction to TPM. Productivity Press, Cambridge
Venkatesh J (2005) An introduction to total productive maintenance (TPM), The plant maintenance resource center, pp 2–3, 15–27
Wireman T (1990) World class maintenance management. Industrial Press, New York
Yamashina H (1995) Japanese manufacturing strategy and the role of total productive maintenance. J Qual Maint Eng 1(1):27–38
Lungberg O (1998) Mearsument of overall equipment effectiveness as a basic for TPM activities. Int J oper Prod Manag 18(5):495–507
Lesshammar M (1999) Evaluation and improvement of manufacturing performance measurement systems—the role of OEE. Int J Oper Prod Manag 19(1):55–78
Dal B, Tugwell P, Greatbanks R (2000) Overall equipment effectiveness as a measure of operational improvement. Int J Oper Prod Manag 20(12):1488–1520
Yu B, Singh MP (2002) An evidential model for distributed reputation management, AAMAS’02, Bologna, Italy, 15–19 July 2002
Thiagarajan K, Raghunathan A, Natarajan P, Poonkuzhali G, Ranjan P (2009) Weighted graph approach for trust reputation management. World Acad Sci Eng Technol 32:830–836
Yu B, Singh MP (2000) Trust and reputation management in a small- world network. In: proceedings of the 4th international conference on multiagent systems, pp 449–450
Yu B, Singh MP (2000) A social mechanism of reputation management in electronic communities. In: proceedings of the 4th international workshop on cooperative information agents
Harary F (1969) Graph theory. Addision-Wesley, Reading
Maran M, Manikandan G, Thiagarajan K (2012) Overall Equipment effectiveness measurement by weighted approach method. In: Lecture notes in engineering and computer science: proceedings of the international multi conference of engineers and computer scientists 2012, IMECS 2012, 14–16 March, Hong Kong, pp 1280–1285
Srinivasan SP, Malliga P, Thiagarajan K (2008) An Algorithmic graphical approach for ground level logistics management of Jatropha seed distribution. Ultra Sci Phys Sci 20(3):605-612
Acknowledgments
The authors would like to thank Dr. Ponnammal Natarajan, Former Director of Research, Anna University, Chennai, India. Currently Advisor (Research and Development), Rajalakshmi Engineering College, for her intuitive ideas and fruitful discussions with respect to the paper’s contribution and the Management of Velammal College of Engineering and Technology, Madurai and Dr. R. Vivekaanandhan, Assistant Professor, Department of English, Velammal College of Engineering and Technology, Madurai, for his constant encourage and support to complete the task.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2013 Springer Science+Business Media Dordrecht
About this chapter
Cite this chapter
Maran, M., Manikandan, G., Thiagarajan, K. (2013). Overall Equipment Effectiveness Measurement: Weighted Approach Method and Fuzzy Expert System. In: Yang, GC., Ao, SI., Huang, X., Castillo, O. (eds) IAENG Transactions on Engineering Technologies. Lecture Notes in Electrical Engineering, vol 186. Springer, Dordrecht. https://doi.org/10.1007/978-94-007-5651-9_17
Download citation
DOI: https://doi.org/10.1007/978-94-007-5651-9_17
Published:
Publisher Name: Springer, Dordrecht
Print ISBN: 978-94-007-5623-6
Online ISBN: 978-94-007-5651-9
eBook Packages: EngineeringEngineering (R0)