Skip to main content

Blue Nile (Abbay) Hydropower Potential, Prioritization, and Trade-Offs on Priority Investments

  • Chapter

Abstract

The low level of access, rising fuel costs, and increasing effects of climate change are reinvigorating the policy-makers’ interest in Africa in renewable energy sources such as hydropower. Ethiopia is among countries which have very low modern energy sources, but possesses one of the highest hydropower potential, next to Congo. The topographic feature and the availability of water in Ethiopia permit a large hydropower potential. However, as the available runoff in rivers has very high hydrological variability, tapping into this potential requires investment on storage to smooth out the temporal hydrological variability. In this chapter, first the behavior of this hydrological variability and implication of water resources development are discussed. Second, various documents and reports providing varying values of hydropower potential of Ethiopia and Abbay are summarized. To improve the existing understanding of sites, topographical and hydrological evaluation of 129 hydropower potential sites has been carried out. These sites were identified in previous studies having a total capacity of 13,845 MW. After evaluations, 91 possible sites with total potential of 12,148 MW from various tributary rivers were identified and mapped. Dabus sub-basin stands first among the 16 sub-basins with 13 hydropower potential sites and a total capacity of 3,524 MW, and similarly the other sub-basins are also ranked. The ranking of these sites has been carried out based on cost per kilowatt hour of the hydropower potential (HP) sites. Furthermore, the chapter discusses the benefits and trade-offs for four priority developments identified as Eastern Nile regional fast-track projects.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD   169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

References

  • Awulachew SB (2000) Investigation of water resources aimed at multi-objective development with respect to limited data situation: the case of Abaya-Chamo Basin, Ethiopia. PhD thesis, TU Dresden

    Google Scholar 

  • BCEOM – French Engineering Consultants, in association with ISL and BRGM (1998) Abbay river basin integrated development master plan project (ARBIDMPP), phase 2 Volume I Main report, volume II part 1 climatology, part 2 Hydrology, Volume VI part 2 Large dames and Hydropower schemes, phase 3 volume IV part 7 hydropower schemes

    Google Scholar 

  • Block P (2007) Integrated management of the Blue Nile Basin in Ethiopia: hydropower and irrigation modeling. International Food Policy Research Institute. IFPRI Discussion Paper 00700

    Google Scholar 

  • Michael A (2004) Lesson learned from existing hydro schemes, case study: Koka Dam. First National Water Forum conference proceeding paper, Ministry of Water Resources, Addis Ababa, Ethiopia, pp 49–58

    Google Scholar 

  • McCornick PG, Awulachew SB, Abebe M (2008). Water–food–energy–environment synergies and tradeoffs: major issues and case studies. Water Policy 10(S1):23–26

    Article  Google Scholar 

  • MoWR (Ministry of Water Resources) (2002) Ethiopia water sector development programme 2002–2016, main report

    Google Scholar 

  • WAPCOS (1990) Preliminary water resource development master plan for Ethiopia, vol III, annex – a hydrology and hydrogeology, vol V annex J – hydropower

    Google Scholar 

  • World Bank (2006) Ethiopia: managing water resources to maximize sustainable growth: country water resources assistance strategy. The World Bank, Washington, DC

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Dereje T. Desalegn .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2011 Springer Science+Business Media B.V.

About this chapter

Cite this chapter

Desalegn, D.T., Awulachew, S.B., Moges, S.A. (2011). Blue Nile (Abbay) Hydropower Potential, Prioritization, and Trade-Offs on Priority Investments. In: Melesse, A.M. (eds) Nile River Basin. Springer, Dordrecht. https://doi.org/10.1007/978-94-007-0689-7_16

Download citation

Publish with us

Policies and ethics