Abstract
Major highway infrastructure elements, in need of post-earthquake maintenance for improved highway life-cycle, motorist’s guidance, and safety, include bridges, pavements, interchanges, and tunnels. In addition, there are numerous, minor infrastructure elements vital to motorist’s guidance and safety, such as overhead and roadside appurtenances, including signs, guardrails, and luminaries. The maintenance and upkeep of all infrastructure components is crucial for mobility, driver safety and guidance, and overall efficient functioning of a highway system. Successive research efforts have been made in developing optimal Maintenance Repair and Rehabilitation (MR&R) strategies for major infrastructure components, such as pavements and bridges. However, there has been limited studies reported on Maintenance Inspection and Scheduling (MI&S) of minor infrastructure elements, such as signs, guardrails, and luminaries, particularly after the occurrence of seismic events. Typically, a field inspection of such elements is carried out at fixed time intervals to determine their condition, which is used to develop optimal MR&R plan over a given planning horizon, which is not. In this paper we introduce a bilevel model for developing an optimal MI&S plan for large-scale highway infrastructure elements, following a seismic event. At the lower level a set of optimal inspection routes is obtained, which is used at the upper level to obtain optimal maintenance schedule over a given planning horizon. Separate algorithms are developed for solving the lower and upper level optimization models, including a genetic algorithm for solving the lower level model and a customized heuristic for solving the upper level model. A numerical example using a real highway network from Maryland is presented. Finally, directions for future work are discussed.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Abdullah J (2007) Models for the effective maintenance of roadside features. Doctoral dissertation, Morgan State University, Baltimore, MD
Brotcorne L, Labbe M, Marcotte P, Savard G (2001) A bilevel model for toll optimization on a multicommodity transportation network. Transport Sci 35(4):345–358
Golabi K, Kulkarni RB, Way GB (1982) A statewide pavement management system. Interfaces 12(6):5–21
Greenfield D (1996) An OR bridge to the future. ORMS Online Edition 23(6)
Hejazi SR, Memariani A, Jahanshahloo G, Sepehri MM (2002) Linear bilevel programming solution by genetic algorithm. Com Oper Res 29(13):1913–1925
Huang B, Liu N (2004) Bilevel programming approach to optimizing a logistic distribution network with balancing requirements. Trans Res Record 1894:188–197
Jha MK, Abdullah J (2006a) A Markovian approach for optimizing highway life-cycle with genetic algorithms by considering maintenance of roadside appurtenances. J Frankl Inst 343:404–419
Jha MK, Kepaptsoglou K, Karlaftis M, Abdullah J (2006) A genetic algorithms-based decision support system for transportation infrastructure management in urban areas. In: Taniguchi E, Thompson R (eds) Recent advances in city logistics: proceedings of the 4th international conference on city logistics. Elsevier, New York
Jha MK, Abdullah J (2006b) A probabilistic approach to Maintenance Repair And Rehabilitation (MR&R) of roadside features. In: Proceedings of the 14th Pan-American conference on traffic and transportation engineering (PANAM XIV), Las Palmas de Gran Canaria, Spain
Kang M (2008) An alignment optimization model for a simple highway Network, Doctoral dissertation, University of Maryland, College park, MD
Karlaftis M, Kepaptsoglou K, Lambropoulos S (2007) Fund allocation for transportation network recovery following natural disasters. J Urban Plan Dev ASCE 133(1):1–8
Kepaptsoglou K, Karlaftis M, Bitsikas T, Panetsos P, Lambropoulos S (2006) A methodology and decision support system for scheduling inspections in a bridge network following a natural disaster. IABMAS 2006 proceedings. Balkema Publishers, Porto, Portugal
Le Y, Miao L, Wang H, Wang C (2006) A bilevel programming model and a solution method for public logistics terminal planning. In: Proceedings of the 85th transportation research board conference, Washington, DC
Madanat S (1991) Optimizing sequential decisions under measurement and forecasting uncertainty: application to infrastructure inspection, maintenance and rehabilitation. D.Sc. dissertation, Massachusetts Institute of Technology, Boston, MA
Maji A, Jha MK (2007a) Modeling highway infrastructure maintenance schedule with budget constraint. Trans Res Record 1991:19–26
Maji A, Jha MK (2007b) Maintenance schedule of highway infrastructure elements using a genetic algorithm. In: Proceedings of the international conference on civil engineering in the new millennium: opportunities and challenges (CENeM-2007), Bengal Engineering and Science University, Shibpur, Howrah, India
Marcotte P, Savard G, Semet F (2004) A bilevel programming approach to the travelling salesman problem. Oper Res Lett 32(3):240–248
Mathur K, Puri MC (2005). A bilevel bottleneck programming problem. Eur J Oper Res 85:337–344
Murray-Tuite PM, Mahmassani HS (2004). Methodology for determining vulnerable links in a transportation network. Trans Res Record 1882:88–96
Samanta S, Jha MK (2006). A bilevel model for station locations optimization along a rail transit line. In: Allan J et al. (eds) Computers in railways X (COMPRAIL 2006). WIT Press, Southampton, UK
Yang H, Yagar S (1994). Traffic assignment and traffic control in general freeway-arterial corridor systems, Transport Res B Meth 28:463–486
Yin Y (2000). Genetic-algorithms based approach for bilevel programming models. J Transp Eng ASCE 126(2):115–120
Acknowledgements
This work was jointly carried out at the Center for Advanced Transportation and Infrastructure Engineering Research, Morgan State University and the National Technical University of Greece, Athens. The authors wish to acknowledge Dr. Jawad Abdullah for his assistance with some of the work.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2011 Springer Science+Business Media B.V.
About this chapter
Cite this chapter
Jha, M.K., Kepaptsoglou, K., Karlaftis, M., Karri, G.A.K. (2011). A Bilevel Optimization Model for Large Scale Highway Infrastructure Maintenance Inspection and Scheduling Following a Seismic Event. In: Papadrakakis, M., Fragiadakis, M., Lagaros, N. (eds) Computational Methods in Earthquake Engineering. Computational Methods in Applied Sciences, vol 21. Springer, Dordrecht. https://doi.org/10.1007/978-94-007-0053-6_22
Download citation
DOI: https://doi.org/10.1007/978-94-007-0053-6_22
Published:
Publisher Name: Springer, Dordrecht
Print ISBN: 978-94-007-0052-9
Online ISBN: 978-94-007-0053-6
eBook Packages: EngineeringEngineering (R0)