The BRAHMATWINN project was funded by the European Community (EC contract no. 036952) and was carried out between June 2006 and December 2009. Its overall objective was to provide a comprehensive impact assessment of climate change to the hydrological dynamics and integrated land and water resources management (ILWRM) in alpine mountain massifs.


River Basin Ocean General Circulation Model Danube River Hydrological Dynamic Danube River Basin 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.


  1. Flügel W-A (2011b) Twinning European and South Asian river basins to enhance capacity and implement adaptive integrated water resources management approaches—results from the EC-project BRAHMATWINN. Adv Sci Res 7:1–9. doi:10.5194/asr-7-1-2011. www.adv-sci-res.net/7/1/2011/ CrossRefGoogle Scholar
  2. ICPDR, International Commission for the Protection of the Danube River (2005) The Danube River Basin District. Part A and B. ICPDR Document IC/084. 18 March 2005, 191 pGoogle Scholar

Copyright information

© Springer India 2015

Authors and Affiliations

  1. 1.Department of Geoinformatics, Hydrology and ModellingFriedrich Schiller University, Jena (FSU-Jena)JenaGermany
  2. 2.Department of Water Resources Development & ManagementIndian Institute of Technology RoorkeeRoorkeeIndia

Personalised recommendations