Abstract
The phosphate (P) release and re-uptake behaviors have been discussed by a model of two species biomass[1,2]. In the present research the relationship between the kinetic parameters and BOD load were examined using a bench scale sequencing batch reactor.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Similar content being viewed by others
References
Yoon C H, Suzuki M (1990) Simulation by using model of two species of biomass on biological phosphorus removal processes. Jpn J Wat Pollut Res 13: 441–448
Imai H (1990) A simulation model of phosphorus removal by sequencing batch reactor. Chem Eng 35: 29–34 (in Japanese)
Imai H, Endoh K, Kozuka T (1988) Magnesium requirement for biological removal of phosphate by activated sludge. J Ferment Tech 66: 657–666
Gujer W, Henze M (1991) Activated sludge modeling and simulation. Wat Sci Tech 23 Kyoto: 1011–1023
Tsuno H, Goda T, Somiya I (1978) Kinetic model of activated sludge metabolism and i t s application to the response of qualitative shock load. Wat Res 12: 513–522
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 1992 Springer-Verlag Tokyo
About this paper
Cite this paper
Hiroshi, I., Takeshi, Y., Akihiro, S., Motoko, M. (1992). Relation Between Kinetic Parameters and BOD Load in Simulation of BOD and P Behaviors in a Sequencing Batch Reactor. In: Furusaki, S., Endo, I., Matsuno, R. (eds) Biochemical Engineering for 2001. Springer, Tokyo. https://doi.org/10.1007/978-4-431-68180-9_216
Download citation
DOI: https://doi.org/10.1007/978-4-431-68180-9_216
Publisher Name: Springer, Tokyo
Print ISBN: 978-4-431-68182-3
Online ISBN: 978-4-431-68180-9
eBook Packages: Springer Book Archive