Project Management Using Graphics

  • Fábio Pettinati
Conference paper

Abstract

This paper addresses the problem of lack of visualization most managers face when using computer-based project control systems: although highly relevant information is generated, usually no graphical output is produced. This paper presents a system called UniPert that automatically produces high quality drawings showing all activities present in a project and the relationship among them. A detailed description of UniPert’s major components and algorithms is presented as well as examples of its actual use. The main contribution of this paper is the integration of many different techniques and concepts that led to the development of the UniPert system.

Keywords

Graphical Output Virtual Memory Interface File Precedence Diagram Syntax Graph 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Bibliography

  1. [DEDO80]
    Dedourek JM, Gujar UG (1980) Scanner Design. Software-Practice and Experience, Vol. 10, pp 959–972CrossRefGoogle Scholar
  2. [LEWI76]
    Lewis II PM et al (1976) Compiler Design Theory. Addison-Wesley Publishing Co.MATHGoogle Scholar
  3. [SETZ79]
    Setzer VW (1979) Non-recursive Top-down Syntax Analysis. Software-Practice and Experience, Vol. 9, pp 237–245CrossRefMATHMathSciNetGoogle Scholar
  4. [WIRT79]
    Wirth N (1976) Algorithms + Data Structures Prentice-HallGoogle Scholar
  5. [WIRT77]
    Wirth N (1977) Compilerbau (in german) B.G. Teubner (ed)Google Scholar

Copyright information

© Springer-Verlag Tokyo 1985

Authors and Affiliations

  • Fábio Pettinati
    • 1
  1. 1.Tecninger Sistemas LtdaBrasil

Personalised recommendations